902 resultados para PROJECT MANAGEMENT COMPETENCY
Resumo:
This thesis was carried out as a case study of a company YIT in order to clarify the sev-erest risks for the company and to build a method for project portfolio evaluation. The target organization creates new living environment by constructing residential buildings, business premises, infrastructure and entire areas worth for EUR 1.9 billion in the year 2013. Company has noted project portfolio management needs more information about the structure of project portfolio and possible influences of market shock situation. With interviews have been evaluated risks with biggest influence and most appropriate metrics to examine. The major risks for the company were evaluated by interviewing the executive staff. At the same time, the most appropriate risk metrics were considered. At the moment sales risk was estimated to have biggest impact on company‟s business. Therefore project port-folio evaluation model was created and three different scenarios for company‟s future were created in order to identify the scale of possible market shock situation. The created model is tested with public and descriptive figures of YIT in a one-year-long market shock and the impact on different metrics was evaluated. Study was conducted using con-structive research methodology. Results indicate that company has notable sales risk in certain sections of business portfolio.
Resumo:
This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.
Behavioural Competency Management with special reference to Commercial Banks headquartered in Kerala
Resumo:
This study aims to analyze, compare and contrast the behavioral competency of officials in commercial banks headquartered in Kerala. This is done by analyzing the soft skills/behavioral skills possessed by an individual employee in both clerical and managerial levels and the means adopted to enhance their said skills in near future. The study was conducted with the objective of analyzing the behavioral competency of the managers and clerical staff in the commercial banks headquartered in Kerala. The researcher has gone through the available literature with respect to employee competency, job satisfaction and employee performance evaluation to formulate the problem and conceptualize the framework of the study. The study concluded that the competency of the employees differs from one bank to the other but strengthening the employees’ competency is the only possible solution by which the banks can determine their future growth prospects. Only through competency, banks can achieve high level of performance especially under the globalised situation.
Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.