1000 resultados para Highway transportation
Resumo:
Contracts Accepted for letting reports from the Iowa Department of Transportation.
Resumo:
Contracts Accepted for letting reports from the Iowa Department of Transportation.
Resumo:
Contracts Accepted for letting reports from the Iowa Department of Transportation.
Resumo:
Contracts Accepted for letting reports from the Iowa Department of Transportation.
Resumo:
Article 2120 of the Standard Specifications for Highway and Bridge Construction Series 2009 provides for a fuel adjustment factor to be applied to payments and partial payments for quantities of certain items of excavation work as the work is done, in accordance with the specification, when indicated in the contract documents. A Current Price Index (CPI), in dollars per gallon (liter), will be established by the DOT for each month. The CPI will be the price of No. 2 High Sulfur Diesel, as reported by Oil Price Information Service using the first weekday for the month and the average of all prices reported for Des Moines. The Base Price Index (BPI) for each contract will be the CPI in effect during the month previous to the month of the letting of that contract. If the contract has metric units, divide the Price Index ($/gal) by 3.785412 to obtain $/liter.
Resumo:
Weekly letting report.
Resumo:
This document serves as a reference guide to local planning agencies for the development of their regional Transportation Improvement Program (TIP) and the Statewide Transportation Improvement Program (STIP).
Resumo:
The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) develop Iowa’s Five-Year Transportation Improvement Program (Five-Year Program) to inform Iowans of planned investments in our state’s multi-modal transportation system. The Five-Year Program is typically updated and approved each year in June. The Five-Year Program encompasses investments in aviation, transit, railroads, trails, and highways. This brochure describes the programming process used by the Commission and Iowa DOT to develop the highway section of the Five-Year Program.
Resumo:
Weekly letting report.
Resumo:
Weekly letting report.
Resumo:
The measurement of pavement roughness has been the concern of highway engineers for more than 70 years. This roughness is referred to as "riding quality" by the traveling public. Pavement roughness evaluating devices have attempted to place either a graphical or numerical value on the public's riding comfort or discomfort. Early graphical roughness recorders had many different designs. In 1900 an instrument called the "Viagraph" was developed by an Irish engineer.' The "Viagraph" consisted of a twelve foot board with graphical recorder drawn over the pavement. The "Profilometer" built in Illinois in 1922 was much more impressive. ' The instrument's recorder was mounted on a frame supported by 32 bicycle wheels mounted in tandem. Many other variations of profilometers with recorders were built but most were difficult to handle and could not secure uniformly reproducible results. The Bureau of Public Roads (BPR) Road Roughness Indicator b u i l t in 1941 is the most widely used numerical roughness recorder.' The BPR Road Roughness Indicator consists of a trailer unit with carefully selected springs, means of dampening, and balanced wheel.
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2007
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2008
Resumo:
Audit report on Highway Safety Projects administered by The Integer Group Midwest for the year ended September 30, 2009
Resumo:
Weekly letting report.