927 resultados para Electric load management
Resumo:
This paper is a report of students' responses to instruction which was based on the use of concrete representations to solve linear equations. The sample consisted of 21 Grade 8 students from a middle-class suburban state secondary school with a reputation for high academic standards and innovative mathematics teaching. The students were interviewed before and after instruction. Interviews and classroom interactions were observed and videotaped. A qualitative analysis of the responses revealed that students did not use the materials in solving problems. The increased processing load caused by concrete representations is hypothesised as a reason.
Resumo:
This paper examines the linkages between diversity management (DM), innovation and high performance in social enterprises. These linkages are explicated beyond traditional framing of DM limited to workforce composition, to include discussions of innovation through networked diversity practices; reconciliation; and funding options. The paper draws upon a UK-based national survey and the case study data. Multiple data collection methods were used, including semi-structured interviews, questionnaires and workshops with participant observation. NVivo and SPSS software packages were utilized in order to analyse the qualitative and quantitative data, respectively. We used thematic coding and cropping techniques in analysing the case studies in the paper. A broad range of conflicting and supporting literature was enfolded into the conversations and discussion. The paper demonstrates that social enterprises exhibit unique characteristics in terms of size and location, as well as their double remit to add value both economically and socially. As a conclusion, we argue for social enterprises to consider options for DM in the interests of maximization of innovation and business performance. We contend that further research is needed to describe how social entrepreneurs draw upon their various ‘diversity resources’ in the process of innovation
Resumo:
From 19 authoritative lists with 164 entries of ‘endangered’ Australian mammal species, 39 species have been reported as extinct. When examined in the light of field conditions, the 18 of these species thought to be from Queensland consist of (a) species described from fragmentary museum material collected in the earliest days of exploration, (b) populations inferred to exist in Queensland by extrapolation from distribution records in neighbouring States or countries, (c) inhabitants of remote and harsh locations where search effort is extraordinarily difficult (especially in circumstances of drought or flooding). and/or (d) individuals that are clearly transitory or peripheral in distribution. ‘Rediscovery’ of such scarce species - a not infrequent occurrence - is nowadays attracting increasing attention. Management in respect of any scarce wildlife in Queensland presently derives from such official lists. The analyses here indicate that this method of prioritizing action needs review. This is especially so because action then tends to be centred on species chosen out of the lists for populist reasons and that mostly addresses Crown lands. There is reason to believe that the preferred management may lie private lands where casual observation has provided for rediscovery and where management is most desirable and practicable.
Resumo:
Tributyl tin (TBT) deposits in the sediments are one of many impacts that have been imposed on both the environment and the up-coming development of Boat Haven, Airlie Beach, Queensland. The current costly solution to this problem (that is, removal and re-burial) could be put in future to the credit of the developer rather than be treated (as at present) as a penalty. The Queensland Government’s Offsets Scheme provides an opportunity to promote effective conservation of regional landscapes. Because this scheme plans for offsetting in terrestrial vegetation systems through rehabilitation, so credits could be given to those approved developers who rehabilitate valuable marine habitats disturbed by TBT deposits.
Resumo:
Efficient state asset management is crucial for governments as they facilitate the fulfillment of their public functions, which include the provision of essential services and other public administration support. In recent times economies internationally and particularly in South east Asia, have displayed increased recognition of the importance of efficiencies across state asset management law, policies and practice. This has been exemplified by a surge in notable instances of reform in state asset management. A prominent theme in this phenomenon is the consideration of governance principles within the re-conceptualization of state asset management law and related policy, with many countries recognizing variability in the quality of asset governance and opportunities for profit as being critical factors. This issue is very current in Indonesia where a major reform process in this area has been confirmed by the establishment of a new Directorate of State Asset Management. The incumbent Director-General of State Asset Management has confirmed a re-emphasis on adherence to governance principles within applicable state asset management law and policy reform. This paper reviews aspects of the challenge of reviewing and reforming Indonesian practice within state asset management law and policy specifically related to public housing, public buildings, parklands, and vacant land. A critical issue in beginning this review is how Indonesia currently conceptualizes the notion of asset governance and how this meaning is embodied in recent changes in law and policy and importantly in options for future change. This paper discusses the potential complexities uniquely Indonesian characteristics such as decentralisation and regional autonomy regime, political history, and bureaucratic culture
Resumo:
In a previous chapter (Dean and Kavanagh, Chapter 37), the authors made a case for applying low intensity (LI) cognitive behaviour therapy (CBT) to people with serious mental illness (SMI). As in other populations, LI CBT interventions typically deal with circumscribed problems or behaviours. LI CBT retains an emphasis on self-management, has restricted content and segment length, and does not necessarily require extensive CBT training. In applying these interventions to SMI, adjustments may be needed to address cognitive and symptomatic difficulties often faced by these groups. What may take a single session in a less affected population may require several sessions or a thematic application of the strategy within case management. In some cases, the LI CBT may begin to appear more like a high-intensity (HI) intervention, albeit simple and with many LI CBT characteristics still retained. So, if goal setting were introduced in one or two sessions, it could clearly be seen as an LI intervention. When applied to several different situations and across many sessions, it may be indistinguishable from a simple HI treatment, even if it retains the same format and is effectively applied by a practitioner with limited CBT training. ----- ----- In some ways, LI CBT should be well suited to case management of patients with SMI. treating staff typically have heavy workloads, and find it difficult to apply time-consuming treatments (Singh et al. 2003). LI CBT may allow provision of support to greater numbers of service users, and allow staff to spend more time on those who need intensive and sustained support. However, the introduction of any change in practice has to address significant challenges, and LI CBT is no exception. ----- ----- Many of the issues that we face in applying LI CBT to routine case management in a mnetal health service and their potential solutions are essentially the same as in a range of other problem domains (Turner and Sanders 2006)- and, indeed, are similar to those in any adoption of innovation (Rogers 2003). Over the last 20 years, several commentators have described barriers to implementing evidence-based innovations in mental health services (Corrigan et al. 1992; Deane et al. 2006; Kavanagh et al. 1993). The aim of the current chapter is to present a cognitive behavioural conceptualisation of problems and potential solutions for dissemination of LI CBT.
Resumo:
Future air traffic management concepts often involve the proposal of automated separation management algorithms that replaces human air traffic controllers. This paper proposes a new type of automated separation management algorithm (based on the satisficing approach) that utilizes inter-aircraft communication and a track file manager (or bank of Kalman filters) that is capable of resolving conflicts during periods of communication failure. The proposed separation management algorithm is tested in a range of flight scenarios involving during periods of communication failure, in both simulation and flight test (flight tests were conducted as part of the Smart Skies project). The intention of the conducted flight tests was to investigate the benefits of using inter-aircraft communication to provide an extra layer of safety protection in support air traffic management during periods of failure of the communication network. These benefits were confirmed.
Resumo:
Goals of work: The aim of this secondary data analysis was to investigate symptom clusters over time for symptom management of a patient group after commencing adjuvant chemotherapy. Materials and methods: A prospective longitudinal study of 219 cancer outpatients conducted within 1 month of commencing chemotherapy (T1), 6 months (T2), and 12 months (T3) later. Patients' distress levels were assessed for 42 physical symptoms on a clinician-modified Rotterdam Symptom Checklist. Symptom clusters were identified in exploratory factor analyses at each time. Symptom inclusion in clusters was determined from structure coefficients. Symptoms could be associated with multiple clusters. Stability over time was determined from symptom cluster composition and the proportion of symptoms in the initial symptom clusters replicated at later times. Main results Fatigue and daytime sleepiness were the most prevalent distressing symptoms over time. The median number of concurrent distressing symptoms approximated 7, over time. Five consistent clusters were identified at T1, 2, and T3. An additional two clusters were identified at 12 months, possibly due to less variation in distress levels. Weakness and fatigue were each associated with two, four, and five symptom clusters at T1, T2, and T3, respectively, potentially suggesting different causal mechanisms. Conclusion: Stability is a necessary attribute of symptom clusters, but definitional clarification is required. We propose that a core set of concurrent symptoms identifies each symptom cluster, signifying a common cause. Additional related symptoms may be included over time. Further longitudinal investigation is required to identify symptom clusters and the underlying causes.
Resumo:
In this paper, the performance of voltage-source converter-based shunt and series compensators used for load voltage control in electrical power distribution systems has been analyzed and compared, when a nonlinear load is connected across the load bus. The comparison has been made based on the closed-loop frequency resopnse characteristics of the compensated distribution system. A distribution static compensator (DSTATCOM) as a shunt device and a dynamic voltage restorer (DVR) as a series device are considered in the voltage-control mode for the comparison. The power-quality problems which these compensator address include voltage sags/swells, load voltage harmonic distortions, and unbalancing. The effect of various system parameters on the control performance of the compensator can be studied using the proposed analysis. In particular, the performance of the two compensators are compared with the strong ac supply (stiff source) and weak ac-supply (non-still source) distribution system. The experimental verification of the analytical results derived has been obtained using a laboratory model of the single-phase DSTATCOM and DVR. A generalized converter topology using a cascaded multilevel inverter has been proposed for the medium-voltage distribution system. Simulation studies have been performed in the PSCAD/EMTDC software to verify the results in the three-phase system.
Resumo:
Purpose: The paper seeks to apply the theory of the democratic deficit to school-based management with an emphasis on Australia. This theory was developed to examine managerial restructuring of the Australian Public Service in the 1990s. Given similarities between the use of managerial practices in the public service and government schools, the authors draw on recent literature about school-based management in Australia and apply the democratic deficit theory to it. ----- ----- Design/methodology/approach: This paper is conceptual in focus. The authors analyse literature in terms of the three components of the democratic deficit – i.e. the weakening of accountability, the denial of the roles and values of public employees, and the emergence of a “hollow state” – and in relation to the application of this theory to the Australian Public Service.----- ----- Findings: A trend towards the three components of the democratic deficit is evident in Australia although, to date, its emergence has not been as extensive as in the UK. The authors argue that the democratic principles on which public schooling in Australia was founded are being eroded by managerial and market practices.----- ----- Practical implications: These findings provide policy makers and practitioners with another way of examining managerial and market understandings of school-based management and its impact on teachers and on students. It offers suggestions to reorient practices away from those that are exclusively managerial-based towards those that are public-sector based.----- ----- Originality/value: The value of this paper is that it applies the theory of the democratic deficit to current understandings of school-based management.
Resumo:
Bridges are valuable assets of every nation. They deteriorate with age and often are subjected to additional loads or different load patterns than originally designed for. These changes in loads can cause localized distress and may result in bridge failure if not corrected in time. Early detection of damage and appropriate retrofitting will aid in preventing bridge failures. Large amounts of money are spent in bridge maintenance all around the world. A need exists for a reliable technology capable of monitoring the structural health of bridges, thereby ensuring they operate safely and efficiently during the whole intended lives. Monitoring of bridges has been traditionally done by means of visual inspection. Visual inspection alone is not capable of locating and identifying all signs of damage, hence a variety of structural health monitoring (SHM) techniques is used regularly nowadays to monitor performance and to assess condition of bridges for early damage detection. Acoustic emission (AE) is one technique that is finding an increasing use in SHM applications of bridges all around the world. The chapter starts with a brief introduction to structural health monitoring and techniques commonly used for monitoring purposes. Acoustic emission technique, wave nature of AE phenomenon, previous applications and limitations and challenges in the use as a SHM technique are also discussed. Scope of the project and work carried out will be explained, followed by some recommendations of work planned in future.
Resumo:
This paper presents the results of testing to determine pavement forces from three heavy vehicles (HVs). The HVs were instrumented to measure their wheel forces. A “novel roughness” value of the roads during testing is also derived. The various dynamic pavement forces are presented according to the range of novel roughness of pavement surfacings encountered during testing. The paper then examines the relationship between the two derived wavelengths predominant within the HV suspensions; those of axle hop and body-bounce. How these may be considered as contributing to spatial repetition of pavement forces from HVs is discussed. The paper concludes that pavement models need to be revised since dynamic forces from HVs in particular are not generally considered in current pavement design.
Resumo:
QUT Library and the High Performance Computing and Research Support (HPC) Team have been collaborating on developing and delivering a range of research support services, including those designed to assist researchers to manage their data. QUT’s Management of Research Data policy has been available since 2010 and is complemented by the Data Management Guidelines and Checklist. QUT has partnered with the Australian Research Data Service (ANDS) on a number of projects including Seeding the Commons, Metadata Hub (with Griffith University) and the Data Capture program. The HPC Team has also been developing the QUT Research Data Repository based on the Architecta Mediaflux system and have run several pilots with faculties. Library and HPC staff have been trained in the principles of research data management and are providing a range of research data management seminars and workshops for researchers and HDR students.
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Resumo:
Since 2005, Business Process Management (BPM) has been one of the top 10 issues for CIO’s. However, while there is a general awareness what BPM is and what it relates to, one needs to ask ‘does everyone have the same understanding of the BPM phenomenon? And if not, is there a pattern to these conceptions and how do the ways of conceptualizing BPM differ?’ This paper presents the practitioner conceptions of BPM using a phenomenographic approach to detect variations in the BPM conceptions emphasised. 26 interviews were conducted with BPM practitioners with various scopes of work (namely program management, project management and execution levels) in this qualitative research. Distinct variations in how BPM is conceptualized among BPM practitioners are revealed, showing that emphasis is put depending on their scope of work either towards value generation, improvement or managing processes. This is of particular relevance to the Information Systems and BPM community in order to align the rigorous work done to date by the research community with the current understanding of BPM in the practitioner community.