892 resultados para Collective memory construction


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports safety leaders’ perceptions of safety culture in one of Australasia’s largest construction organisations. A modified Delphi method was used including two rounds of data collection. The first round involved 41 semi-structured interviews with safety leaders within the organisation. The second round involved an online quantitative perception survey, with the same sample, aimed at confirming the key themes identified in the interviews. Participants included Senior Executives, Corporate Managers, Project Managers, Safety Managers and Site Supervisors. Interview data was analysed using qualitative thematic analysis, and the survey data was analysed using descriptive statistics. Leaders’ definitions and descriptions of safety culture were primarily action-oriented and some confusion was evident due to the sometimes implicit nature of culture in organisations. Leadership was identified as a key factor for positive safety culture in the organisation, and there was an emphasis on leaders demonstrating commitment to safety, and being visible to the project-based workforce. Barriers to safety culture improvement were also identified, including the subcontractor management issues, pace of change, and reporting requirements. The survey data provided a quantitative confirmation of the interview themes, with some minor discrepancies. The findings highlight that safety culture is a complex construct, which is difficult to define, even for experts in the organisation. Findings on the key factors indicated consistency with the current literature; however the perceptions of barriers to safety culture offer a new understanding in to how safety culture operates in practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

4D simulation, building information modeling, virtual construction, computer simulation and virtual prototyping are emerging topics in the building construction industry. These techniques not only relate to the buildings themselves, but can also be applied to other forms of construction, including bridges. Since bridge construction is a complex process involving multiple types of plant and equipment, applying such virtual methods benefits the understanding of all parties in construction practice. This paper describes the relationship between temporary platforms, plant and equipment resources and a proposed-built model in the construction planning and use of Virtual Prototyping Simulation (VPS) to implement different construction scenarios in order to help planners identify an optimal construction plan. A case study demonstrates the use of VPS integrated with temporary platform design and plant and equipment-resource allocation to generate different construction scenarios.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Studies of orthographic skills transfer between languages focus mostly on working memory (WM) ability in alphabetic first language (L1) speakers when learning another, often alphabetically congruent, language. We report two studies that, instead, explored the transferability of L1 orthographic processing skills in WM in logographic-L1 and alphabetic-L1 speakers. English-French bilingual and English monolingual (alphabetic-L1) speakers, and Chinese-English (logographic-L1) speakers, learned a set of artificial logographs and associated meanings (Study 1). The logographs were used in WM tasks with and without concurrent articulatory or visuo-spatial suppression. The logographic-L1 bilinguals were markedly less affected by articulatory suppression than alphabetic-L1 monolinguals (who did not differ from their bilingual peers). Bilinguals overall were less affected by spatial interference, reflecting superior phonological processing skills or, conceivably, greater executive control. A comparison of span sizes for meaningful and meaningless logographs (Study 2) replicated these findings. However, the logographic-L1 bilinguals’ spans in L1 were measurably greater than those of their alphabetic-L1 (bilingual and monolingual) peers; a finding unaccounted for by faster articulation rates or differences in general intelligence. The overall pattern of results suggests an advantage (possibly perceptual) for logographic-L1 speakers, over and above the bilingual advantage also seen elsewhere in third language (L3) acquisition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Design-build (DB) system is well-known to be a popular and effective delivery method of construction work worldwide. It has been demonstrated as superior to the traditional delivery system in regards to time and cost performance. However, it suffers a major flaw, in that the performance of project quality cannot be guaranteed. This paper aims to investigate the underlying factors attributing to the poor quality performance of design-build projects in Queensland. Five major factors were first identified through a comprehensive literature review, which relate to (1) project briefing and scope definition, (2) client’s role and responsibility, (3) procurement selection, (4) contractor’s incentive, and (5) design document quality. A questionnaire survey with 127 DB professionals was conducted to determine how these factors affect various quality criteria, i.e. functional quality, architectural quality, technical quality, workmanship quality, client satisfaction and overall quality. With the architectural quality reduced greatly, the research findings reveal that the DB projects in Queensland have the reduced overall quality compared with traditional projects. The impacts of different factors on the quality performance of DB projects have been closely examined and summarized. The research findings will facilitate project stakeholder’s better understanding of the delivery process of the DB system and provide guidelines to improve the quality performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Columns and walls in buildings are subjected to a number of load increments during the construction and service stages. The combination of these load increments and poor quality construction can cause defects in these structural components. In addition, defects can also occur due to accidental or deliberate actions by users of the building during construction and service stages. Such defects should be detected early so that remedial measures can be taken to improve life time serviceability and performance of the building. This paper uses micro and macro model upgrading methods during construction and service stages of a building based on the mass and stiffness changes to develop a comprehensive procedure for locating and detecting defects in columns and walls of buildings. Capabilities of the procedure are illustrated through examples.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Work in the Australian construction industry is fraught with risk and the potential for serious harm. The industry is consistently placed within the three most hazardous industries to work along with other industries such as mining and transport (National Occupational Health and Safety Commission, 2003). In the 2001 to 2002 period, construction work killed 39 people and injured 13,250 more. Hence, more effort is required to reduce the injury rate and maximise the value of the rehabilitation/back-to-work process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Different archives of television material construct different versions of Australian national identity. There exists a Pro-Am archive of Australian television history materials consisting of many individual collections. This archive is not centrally located nor clearly bounded. The collections are not all linked to each other, nor are they aware of each other, and they do not claim to have a single common project. Pro-Am collections tend not to address Australian television as a whole, rather addressing particular genres, programs or production companies. Their vision of Australia is 'ordinary' and everyday. The boundaries of 'Australia' in the Pro-Am archive are porous, allowing non-Australians to contribute material, and also including non-Australian material and this causes little sense of anxiety.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This work investigated the production of bio oil from plum seed (Zyziphus jujuba) by fixed bed pyrolysis technology. A fixed bed pyrolysis system has been designed and fabricated for production of bio oil. The major components of the system are: fixed bed reactor, liquid condenser and liquid collector. Nitrogen gas was used to maintain the inert atmosphere in the reactor where the pyrolysis reaction takes place. The feedstock considered in this study is plum seed as it is available waste material in Bangladesh. The reactor is heated by means of a cylindrical biomass external heater. Rice husk was used as the energy source. The products are oil, char and gas. The parameters varied are reactor bed temperature, running time and feed particle size. The parameters are found to influence the product yields significantly. The maximum liquid yield of 39 wt% at 5200C for a feed particle size of 2.36-4.75 mm and a gas flow rate of 8 liter/min with a running time of 120 minute. The pyrolysis oil obtained at these optimum process conditions are analyzed for some of their properties as an alternative fuel. The density of the liquid was closer with diesel. The viscosity of the plum seed liquid was lower than that of the conventional fuels. The calorific value of the pyrolysis oil is one half of the diesel fuel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Partnering has drawn attention from both academics and practitioners in the construction industry in the context of construction and facilities management. The past decades have seen a number of articles reporting the application of partnering in construction. The Chinese construction industry is one of the largest industries in the world; however, to the authors’ best knowledge, no project in mainland China has adopted this procurement approach in a formal and systematic manner as yet. This study employed a qualitative approach to investigate the factors that support or impede the implementation of partnering in mainland China. The findings indicate that the partnering practice is feasible in the construction industry of China due to the large demand brought about by China’s strong economic growth and government support. However, the implementation of partnering in the Chinese construction industry is being impeded by the restrictions of the current Chinese regulatory framework and tender evaluation framework, the incompatible features of Chinese culture and the general lack of trust. Six strategies that help to facilitate the implementation of partnering in China have been developed. This study offers a useful reference to implement collaborative contracting models such as partnering in developing countries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – Rehearsing practical site operations is without doubt one of the most effective methods for minimising planning mistakes, because of the learning that takes place during the rehearsal activity. However, real rehearsal is not a practical solution for on-site construction activities, as it not only involves a considerable amount of cost but can also have adverse environmental implications. One approach to overcoming this is by the use of virtual rehearsals. The purpose of this paper is to investigate an approach to simulation of the motion of cranes in order to test the feasibility of associated construction sequencing and generate construction schedules for review and visualisation. Design/methodology/approach – The paper describes a system involving two technologies, virtual prototyping (VP) and four-dimensional (4D) simulation, to assist construction planners in testing the sequence of construction activities when mobile cranes are involved. The system consists of five modules, comprising input, database, equipment, process and output, and is capable of detecting potential collisions. A real-world trial is described in which the system was tested and validated. Findings – Feedback from the planners involved in the trial indicated that they found the system to be useful in its present form and that they would welcome its further development into a fully automated platform for validating construction sequencing decisions. Research limitations/implications – The tool has the potential to provide a cost-effective means of improving construction planning. However, it is limited at present to the specific case of crane movement under special consideration. Originality/value – This paper presents a large-scale, real life case of applying VP technology in planning construction processes and activities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry is an industry of major strategic importance. Its level of productivity has a significant effect on national economic growth. Productivity indicators are examined. The indicators consist of labour productivity, capital productivity, labour competitiveness, capital intensity and added value content of data, which are obtained from the published census/biannual surveys of the construction industry between the years 1999 and 2011 from the Department of Statistics of Malaysia. The results indicated that there is an improvement in the labour productivity, but the value-added content is declining. The civil engineering and special trades subsectors are more productive than the residential and non-residential subsectors in terms of labour productivity because machine-for-labour substitution is a more important process in those subsectors. The capital-intensive characteristics of civil engineering and special trade works enable these subsectors to achieve higher added value per labour cost but not the capital productivity. The added value per labour cost is lower in larger organizations despite higher capital productivity. However, the capital intensity is lower and unit labour cost is higher in the larger organizations.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper examines the use of metaphors in collective meaning-making in the work of managers and leaders of megaprojects, drawing on interviews with thirty-three leaders of complex projects in a case study organisation responsible for the delivery of major acquisitions. Recognising the notion of both contextualised and decontextualised approaches to either seeking to elicit or project metaphors, the paper describes the various ways in practising project leaders describe their work and the synergies these metaphors have with the broader social discourse and theorisation around complexity and the language of complex adaptive systems. The paper presents our case study findings where we outline our typology of meta-metaphors describing project leaders’ multiple roles and our interpretation of the significance of these choices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.