949 resultados para production management
Resumo:
The use of XML for representation of eLearning-content and for automatic generation of different kinds of teaching media from this material is with all its advantages nowadays stateof-the-art. In the last years there have been numerous projects that leveraged XML-based production environments. At the end of the financial advancement the created materials have to be maintained with limited (human) resources. In the majority of cases this is only possible, if the authors care for their teaching material without extensive IT-support. From our point of view there has so far been a lack of intuitive usable XML editors. The prototype of such an XML editor “aXess” is introduced with the intention to encourage a broad discussion about the required features to manage the content of eLearning-materials.
Resumo:
This paper is a report about the FuXML project carried out at the FernUniversität Hagen. FuXML is a Learning Content Management System (LCMS) aimed at providing a practical and efficient solution for the issues attributed to authoring, maintenance, production and distribution of online and offline distance learning material. The paper presents the environment for which the system was conceived and describes the technical realisation. We discuss the reasons for specific implementation decisions and also address the integration of the system within the organisational and technical infrastructure of the university.
Resumo:
Master production schedule (MPS) plays an important role in an integrated production planning system. It converts the strategic planning defined in a production plan into the tactical operation execution. The MPS is also known as a tool for top management to control over manufacture resources and becomes input of the downstream planning levels such as material requirement planning (MRP) and capacity requirement planning (CRP). Hence, inappropriate decision on the MPS development may lead to infeasible execution, which ultimately causes poor delivery performance. One must ensure that the proposed MPS is valid and realistic for implementation before it is released to real manufacturing system. In practice, where production environment is stochastic in nature, the development of MPS is no longer simple task. The varying processing time, random event such as machine failure is just some of the underlying causes of uncertainty that may be hardly addressed at planning stage so that in the end the valid and realistic MPS is tough to be realized. The MPS creation problem becomes even more sophisticated as decision makers try to consider multi-objectives; minimizing inventory, maximizing customer satisfaction, and maximizing resource utilization. This study attempts to propose a methodology for MPS creation which is able to deal with those obstacles. This approach takes into account uncertainty and makes trade off among conflicting multi-objectives at the same time. It incorporates fuzzy multi-objective linear programming (FMOLP) and discrete event simulation (DES) for MPS development.
Resumo:
Da sich Additive Manufacturing (AM) von traditionellen Produktionsverfahren unterscheidet, entstehen neue Möglichkeiten im Produktdesign und im Supply Chain Setup. Die Auswirkungen der Aufhebung traditionellen Restriktionen im Produktdesign werden unter dem Begriff „Design for Additive Manufacturing“ intensiv diskutiert. In gleicher Weise werden durch AM Restriktionen im traditionellen Supply Chain Setup aufgehoben. Insbesondere sind die folgenden Verbesserungen möglich: Reduktion von Losgrössen und Lieferzeiten, bedarfsgerechte Produktion auf Abruf, dezentrale Produktion, Customization auf Ebene Bauteil und kontinuierliche Weiterentwicklung von Bauteilen. Viele Firmen investieren nicht selbst in die AM Technologien, sondern kaufen Bauteile bei Lieferanten. Um das Potential der AM Supply Chain mit Lieferanten umzusetzen, entstehen die folgenden Anforderungen an AM Einkaufsprozesse. Erstens muss der Aufwand pro Bestellung reduziert werden. Zweitens brauchen AM Nutzer einen direkten Zugang zu den Lieferanten ohne Umweg über die Einkaufsabteilung. Drittens müssen geeignete AM Lieferanten einfach identifiziert werden können. Viertens muss der Wechsel von Lieferanten mit möglichst geringem Aufwand möglich sein. Ein mögliche Lösung sind AM spezifische E-Procurement System um diese Anforderungen zu erfüllen
Resumo:
In process industries, make-and-pack production is used to produce food and beverages, chemicals, and metal products, among others. This type of production process allows the fabrication of a wide range of products in relatively small amounts using the same equipment. In this article, we consider a real-world production process (cf. Honkomp et al. 2000. The curse of reality – why process scheduling optimization problems are diffcult in practice. Computers & Chemical Engineering, 24, 323–328.) comprising sequence-dependent changeover times, multipurpose storage units with limited capacities, quarantine times, batch splitting, partial equipment connectivity, and transfer times. The planning problem consists of computing a production schedule such that a given demand of packed products is fulfilled, all technological constraints are satisfied, and the production makespan is minimised. None of the models in the literature covers all of the technological constraints that occur in such make-and-pack production processes. To close this gap, we develop an efficient mixed-integer linear programming model that is based on a continuous time domain and general-precedence variables. We propose novel types of symmetry-breaking constraints and a preprocessing procedure to improve the model performance. In an experimental analysis, we show that small- and moderate-sized instances can be solved to optimality within short CPU times.
Resumo:
During the second half of the 20th century untreated sewage released from housing and industry into natural waters led to a degradation of many freshwater lakes and reservoirs worldwide. In order to mitigate eutrophication, wastewater treatment plants, including Fe-induced phosphorus precipitation, were implemented throughout the industrialized world, leading to reoligotrophication in many freshwater lakes. To understand and assess the effects of reoligotrophication on primary productivity, we analyzed 28 years of 14C assimilation rates, as well as other biotic and abiotic parameters, such as global radiation, nutrient concentrations and plankton densities in peri-alpine Lake Lucerne, Switzerland. Using a simple productivity-light relationship, we estimated continuous primary production and discussed the relation between productivity and observed limnological parameters. Furthermore, we assessed the uncertainty of our modeling approach based on monthly 14C assimilation measurements using Monte Carlo simulations. Results confirm that monthly sampling of productivity is sufficient for identifying long-term trends in productivity and that conservation management has successfully improved water quality during the past three decades via reducing nutrients and primary production in the lake. However, even though nutrient concentrations have remained constant in recent years, annual primary production varies significantly from year to year. Despite the fact that nutrient concentrations have decreased by more than an order of magnitude, primary production has decreased only slightly. These results suggest that primary production correlates well to nutrients availability but meteorological conditions lead to interannual variability regardless of the trophic status of the lake. Accordingly, in oligotrophic freshwaters meteorological forcing may reduce productivity impacting on the entire food chain of the ecosystem.
Resumo:
Watershed services are the benefits people obtain from the flow of water through a watershed. While demand for such services is increasing in most parts of the world, supply is getting more insecure due to human impacts on ecosystems such as climate or land use change. Population and water management authorities therefore require information on the potential availability of watershed services in the future and the trade-offs involved. In this study, the Soil and Water Assessment Tool (SWAT) is used to model watershed service availability for future management and climate change scenarios in the East African Pangani Basin. In order to quantify actual “benefits”, SWAT2005 was slightly modified, calibrated and configured at the required spatial and temporal resolution so that simulated water resources and processes could be characterized based on their valuation by stakeholders and their accessibility. The calibrated model was then used to evaluate three management and three climate scenarios. The results show that by the year 2025, not primarily the physical availability of water, but access to water resources and efficiency of use represent the greatest challenges. Water to cover basic human needs is available at least 95% of time but must be made accessible to the population through investments in distribution infrastructure. Concerning the trade-off between agricultural use and hydropower production, there is virtually no potential for an increase in hydropower even if it is given priority. Agriculture will necessarily expand spatially as a result of population growth, and can even benefit from higher irrigation water availability per area unit, given improved irrigation efficiency and enforced regulation to ensure equitable distribution of available water. The decline in services from natural terrestrial ecosystems (e.g. charcoal, food), due to the expansion of agriculture, increases the vulnerability of residents who depend on such services mostly in times of drought. The expected impacts of climate change may contribute to an increase or decrease in watershed service availability, but are only marginal and much lower than management impacts up to the year 2025.
Resumo:
Increasing pressure on mountain water resources is making it necessary to address water governance issues in a transdisciplinary way. This entails drawing on different disciplinary perspectives, different types of knowledge, and different interests to answer complex governance questions. This study identifies strategies for addressing specific challenges to transdisciplinary knowledge production aiming at sustainable and reflective water governance. The study draws on the experiences of 5 large transdisciplinary water governance research projects conducted in Austria and Switzerland (Alp-Water-Scarce, MontanAqua, Drought-CH, Sustainable Water Infrastructure Planning, and an integrative river management project in the Kamp Valley). Experiences were discussed and systematically analyzed in a workshop and subsequent interviews. These discussions identified 4 important challenges to interactions between scientists and stakeholders—ensuring stakeholder legitimacy, encouraging participation, managing expectations, and preventing misuse of data and research results—and explored strategies used by the projects to meet them. Strategies ranged from key points to be considered in stakeholder selection to measures that enhance trustful relationships and create commitment.
Resumo:
The Andrew Jackson Demonstration Farm (AJDF) is located in central Jackson County in east central Iowa. A board of directors operates the farm for the purpose of demonstrating different production practices and management strategies. From 1996 to 1998 management intensive grazing practices and the grazing of stockers on a combination of permanent and tillable pasture have been demonstrated. Grazing strategies or practices demonstrated during these years included establishment of Eastern Gamagrass and Big Bluestem, variable density grazing, measuring forage on-offer, estimating dry matter intake, grazing corn, pasture renovation, and fencing and water systems. Production performance data were gathered for the three years stockers that were grazed. During this time the stockers averaged 121 animal days of grazing, a 1.1 head per acre stocking rate, a 1.85 pound average daily gain, and 228 pounds of gain per acre. The financial measures evaluated the value of gain on pasture and the pasture cost of the gain. The value of gain per pound was positive for 1996 and 1997 at $.58 and $.52 whereas in 1998 it was a -$.04. Pasture costs per pound of gain ranged from $.12 to $.16. Production performance is only one part of the profit picture when evaluating a stocker operation. Buysell margins are the other significant part that can greatly impact the profit potential of a summer grazing program.