998 resultados para multilane highways


Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project was undertaken to study the relationships between the performance of locally available asphalts and their physicochemical properties under Iowa conditions with the ultimate objective of development of a locally and performance-based asphalt specification for durable pavements. Physical and physicochemical tests were performed on three sets of asphalt samples including: (a) twelve samples from local asphalt suppliers and their TFOT residues, (b) six core samples of known service records, and (c) a total of 79 asphalts from 10 pavement projects including original, lab aged and recovered asphalts from field mixes, as well as from lab aged mixes. Tests included standard rheological tests, HP-GPC and TMA. Some specific viscoelastic tests (at 5 deg C) were run on b samples and on some a samples. DSC and X-ray diffraction studies were performed on a and b samples. Furthermore, NMR techniques were applied to some a, b and c samples. Efforts were made to identify physicochemical properties which are correlated to physical properties known to affect field performance. The significant physicochemical parameters were used as a basis for an improved performance-based trial specification for Iowa to ensure more durable pavements.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report describes the research completed under the research contract entitled "Development of a Conductometric Test for Frost Resistance of Concrete" undertaken for the Iowa Highway Research Board. The objective of the project was to develop a test method which can be reasonably and rapidly performed in the laboratory and in the field to predict, with a high degree of certainty, the behavior of concrete subjected to the action of alternate freezing and thawing. The significance of the results obtained, and recommendations for use and the continued development of conductometric testing are presented in this final report. In this project the conductometric evaluation of concrete durability was explored with three different test methods. The test methods and procedures for each type of test as well as presentation of the results obtained and their significance are included in the body of the report. The three test methods were: (1) Conductometric evaluation of the resistance of concrete to rapid freezing and thawing, (2) Conductometric evaluation of the resistance of concrete to natural freezing and thawing, and (3) Conductometric evaluation of the pore size distribution of concrete and its correlation to concrete durability. The report also includes recommendations for the continued development of these test methods.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Concretes with service lives of less than 15 years and those with lives greater than 40 years were studied with petrographic microscope, scanning electron microscope, and electron microprobe to determine why these two groups of concrete exhibit such different degrees of durability under highway conditions. Coarse aggregate used in both types of concrete were from dolomite rock, but investigation revealed that dolomite aggregate in the two groups of concretes were much different in several respects. The poorly-performing aggregate is fine-grained, has numerous euhedral and subhedral dolomite rhombohedra, and has relatively high porosity. Aggregate from durable concrete is coarse-grained, with tightly interlocked crystal fabric, anhedral dolomite boundaries, and low porosity. Aggregate in short service life concrete was found to have undergone pervasive chemical reactions with the cement which produced reaction rims on the boundaries of coarse aggregate particles and in the cement region adjacent to aggregate boundaries. Textural and porosity differences are believed to be chiefly responsible for different service lives of the two groups of concrete. The basic reaction that has occurred in the short service life concretes between coarse aggregate and cement is an alkali-dolomite reaction. In the reaction dolomite from the aggregate reacts with hydroxide ions from the cement to free magnesium ions and carbonate ions, and the magnesium ions precipitate as brucite, Mg(OH)2. Simultaneously with this reaction, a second reaction occurs in which product carbonate ions react with portlandite from the cement to form calcite and hydroxide ions. Crystal growth pressures of newly formed brucite and calcite together with other processes, e.g. hydration state changes of magnesium chloride hydrates, lead to expansion of the concretes with resultant rapid deterioration. According to this model, magnesium from any source, either from reacting dolomite or from magnesium road deicers, has a major role in highway concrete deterioration. Consequently, magnesium deicers should be used with caution, and long-term testing of the effects of magnesium deicers on highway concrete should be implemented to determine their effects on durability.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. In reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 1) presents the results of Concept 1 - Steel Beam Precast Units. Concept 2 - Modification of the Beam-in-Slab Bridge is presented in Volume 2. Concept 1, involves the fabrication of precast units (two steel beams connected by a concrete slab) by county work forces. Deck thickness is limited so that the units can be fabricated at one site and then transported to the bridge site where they are connected and the remaining portion of the deck placed. Since Concept 1 bridge is primarily intended for use on low-volume roads, the precast units can be constructed with new or used beams. In the experimental part of the investigation, there were three types of static load tests: small scale connector tests, "handling strength" tests, and service and overload tests of a model bridge. Three finite element models for analyzing the bridge in various states of construction were also developed. Small scale connector tests were completed to determine the best method of connecting the precast double-T (PCDT) units. "Handling strength" tests on an individual PCDT unit were performed to determine the strength and behavior of the precast unit in this configuration. The majority of the testing was completed on the model bridge [L=9,750 mm (32 ft), W=6,400 mm (21 ft)] which was fabricated using the precast units developed. Some of the variables investigated in the model bridge tests were number of connectors required to connect adjacent precast units, contribution of diaphragms to load distribution, influence of position of diaphragms on bridge strength and load distribution, and effect of cast-in-place portion of deck on load distribution. In addition to the service load tests, the bridge was also subjected to overload conditions. Using the finite element models developed, one can predict the behavior and strength of bridges similar to the laboratory model as well as design them. Concept 1 has successfully passed all laboratory testing; the next step is to field test it.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Phase I was initiated as a result of internal Iowa Department of Transportation (Iowa DOT) studies that raised concerns about the quality of embankments being constructed. Some large embankments have recently developed slope stability problems. In addition, pavement roughness has been noted shortly after roads were opened to traffic. This raised the question as to whether the current Iowa DOT embankment construction specifications are adequate. The primary objective of Phase I was to evaluate the quality of embankments being constructed under the current Iowa DOT specifications. The project was initiated in May 1997 with a tour of several embankment projects being constructed around the state. At each of these projects the resident construction engineer, field inspector, and contractor were interviewed with respect to their opinion of the current specifications. From construction observations and discussion during these visits it became obvious that there were problems with the current embankment construction specifications. Six embankment projects were selected for in-depth analysis and to represent the full range of soil types being used across the state. The results of Phase I field and laboratory construction testing and observations and post construction testing are presented in this report. Overall evaluation of the results of Phase I indicate that Iowa is not consistently obtaining a quality embankment constructed under the current Iowa DOT specifications. Based on these results, recommendations are made for Phase II to evaluate alternative specifications and develop rapid field methods for compaction control and soil identification.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report describes a laboratory evaluation of three asphaltic concrete, plant produced mixtures containing Asphadur. The mixtures represent a type A asphaltic concrete and two type B asphaltic concretes. The type A and one of the type B mixtures were used in pavements and will be evaluated later for durability and serviceability. The second type B mixture was made only for laboratory testing. In each instance, control batches of the same mixtures but without Asphadur were made for comparison. Type A is a high type asphaltic concrete, requires a minimum of 65 percent crushed particles and is generally used for higher traffic volume roads. Type B is used for intermediate or lower traffic volumes and requires a minimum of 30 percent crushed particles.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The objective of the investigation was the development of a test that would readily identify the potential of an aggregate to cause D-cracking because of its susceptivity to critical saturation. A Press-Ur-Meter was modified by replacing the air chamber with a one-inch diameter plastic tube calibrated in milli-. It was concluded that the pore index was sufficiently reliable to determine the D-cracking potential of limestone aggregates in all but a few cases where marginal results were obtained. Consistently poor or good results were always in agreement with established service records or concrete durability testing. In those instances where marginal results are obtained, the results of concrete durability testing should be considered when making the final determination of the D-cracking susceptibility of the aggregate in question. The following applications for the pore index test have been recommended for consideration: concrete durability testing be discontinued in the evaluation process of new aggregate sources with pore index results between 0-20 (Class 2 durability) and over 35 (Class 1) durability; composite aggregates with intermediate pore index results of 20-35 be tested on each stone type to facilitate the possible removal of low durability stone from the production process; and additional investigation should be made to evaluate the possibility of using the test to monitor and upgrade the acceptance of aggregate from sources associated with D-cracking.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this project was to determine the optimal hole pattern needed for undersealing work, and also to determine if it is feasible to underseal a roadway with existing longitudinal subdrains without plugging the subdrain system. At the test site the hole pattern had little effect on the grout distribution. It was found that the hole pattern, to be effective, must locate existing voids and that holes must extend at least 2 in. (5 cm) below the underside of the pavement. It appeared that pavements can be undersealed without significant damage to the existing subdrains, but special care is needed to assure that excess grout is not injected into the drainage system. Recommendations are made concerning the hole pattern, grout efflux time, and procedures for minimizing the risk of plugging the subdrains with grout.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project consisted of slipforming a 4-inch thick econocrete subbase on a 6-mile section of US 63. The project location extends south from one mile south of Denver, Iowa to Black Hawk County Road C-66 and consisted of the reconstruction and new construction of a divided four-lane facility. The econocrete was placed 27.3 feet wide in a single pass. Fly ash was used in this field study to replace 30, 45 and 60 percent of the portland cement in three portland cement econocrete base paving mixes. The three mixes contained 300, 350 and 400 pounds of cementitious material per cubic yard. Two Class "C" ashes from Iowa approved sources were used. The ash was substituted on the basis of one pound of ash for each pound of cement removed. The work was done October 6-29, 1987 and May 25-June 9, 1988. The twelve subbase mixes were placed in sections 2500 to 3000 feet in length on both the north and southbound roadways. Compressive strengths of all mixes were determined at 3 and 28 days of age. Flexural strengths of all mixes were determined at 7 and 14 days. In all cases strengths were adequate. The freeze/thaw durability of the econocrete mixes used was reduced by increased fly ash levels but remained above acceptable limits. The test results demonstrate the feasibility of producing econocrete with satisfactory properties even using fly ash at substitution rates up to 45 percent.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Interest in the use of ground rubber from used tires as a hot asphalt mix binder has been increasing due to the magnitude of the disposal problem posed by the annual addition of millions of waste tires to the refuse stream. This study evaluates, through laboratory means, the performance of asphalt-rubber as a hot mix binder as compared to conventional asphalt. The results indicate that asphalt-rubber outperforms its base asphalt in mixes of identical gradation and comparable void content on tests that are heavily dependent on binder characteristics (resilient modulus and indirect tension). An appreciable increase in rut resistance due to the use of asphalt-rubber is not indicated.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In this report, sixteen secondary and primary bridge standards for two types of bridges are rated for AASHTO HS20-44 vehicle configuration utilizing Load Factor methodology. The ratings apply only to those bridges which: (1) are built according to the applicable bridge standard plans, (2) have no structural deterioration or damage, and (3) have no added wearing surface in excess of one-half inch integral wearing surface.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This report presents the results of surveys to determine studded tire usage in Iowa. Also reported are the results of measurements of transverse pavement profiles at selected locations where the pavement is subjected to a high volume of traffic. The surveys were made in January of each of the years 1969 through 1978 and in each of 27 areas into which the state was divided. Estimates of studded tire usage were also made at various locations on Interstate highways in Iowa. The lowest percentage of studded tires was observed in the initial count during the winter of 1968-69. Two years later the percentage had increased to the maximum (22.6%) and then began a gradual decline. The latest count in January of 1978 indicated 8.5% of the cars had studded tires. The decline in the use of studded tires is attributed to the efforts of the Iowa DOT and others to obtain a ban on studded tires and a continual increase in the use of radial tires with claims of improved traction. The wear measurements were recorded by camera. It was found that studded tires have worn ruts in Iowa pavements as deep as 5/16 inch. The ruts lead to water on the pavement and this causes hydroplaning, as well as splash and spray. The conclusion of the study was that studded tires should be banned in Iowa.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Researchers should continuously ask how to improve the models we rely on to make financial decisions in terms of the planning, design, construction, and maintenance of roadways. This project presents an alternative tool that will supplement local decision making but maintain a full appreciation of the complexity and sophistication of today’s regional model and local traffic impact study methodologies. This alternative method is tailored to the desires of local agencies, which requested a better, faster, and easier way to evaluate land uses and their impact on future traffic demands at the sub-area or project corridor levels. A particular emphasis was placed on scenario planning for currently undeveloped areas. The scenario planning tool was developed using actual land use and roadway information for the communities of Johnston and West Des Moines, Iowa. Both communities used the output from this process to make regular decisions regarding infrastructure investment, design, and land use planning. The City of Johnston case study included forecasting future traffic for the western portion of the city within a 2,600-acre area, which included 42 intersections. The City of West Des Moines case study included forecasting future traffic for the city’s western growth area covering over 30,000 acres and 331 intersections. Both studies included forecasting a.m. and p.m. peak-hour traffic volumes based upon a variety of different land use scenarios. The tool developed took goegraphic information system (GIS)-based parcel and roadway information, converted the data into a graphical spreadsheet tool, allowed the user to conduct trip generation, distribution, and assignment, and then to automatically convert the data into a Synchro roadway network which allows for capacity analysis and visualization. The operational delay outputs were converted back into a GIS thematic format for contrast and further scenario planning. This project has laid the groundwork for improving both planning and civil transportation decision making at the sub-regional, super-project level.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation (Iowa DOT) currently performs wetland mitigation on a project-by-project basis. At the same time, other agencies like the Iowa Department of Natural Resources and Natural Resource Conservation Service are performing wetland restoration projects, and counties and cities may be mitigating wetland losses as well. This project examined the feasibility of developing cooperative wetland mitigation projects in order to utilize state and local resources more efficiently to benefit both Iowa and local communities. The project accomplished the following objectives: (1) Identified and characterized cooperative wetland mitigation programs nationwide; (2) Developed a needs assessment through a survey of state, county, and large city agencies in Iowa to describe wetland mitigation programs and determine challenges with mitigation and program improvements, including long-term risks associated with maintenance and monitoring programs; (3) Surveyed state, county, and city agencies and organizations to identify resources available for developing cooperative mitigation projects and procedures; (4) Developed a conceptual framework for cooperative wetland mitigation.