802 resultados para education, professional accreditation, project management
Resumo:
In the construction industry, contractors have to improve the efficiency of markup decision-making to survive from fierce business competition. The effect of client type on markup decision has been aware in previous studies and contractors are advocated to take account of decision factors properly when they are confronted with different types of projects. Nevertheless, the rationales behind the inclusion of different factors in markup decision-making for different projects sustain unknown. In this study, fifty-three factors were identified after extensive literature review and interviews with professionals. The identified factors were afterwards grouped under the headings of nine attributes and compiled in a questionnaire for survey in China. Using the Hotelling’s T-square test, it is found that three attributes (i.e., project characteristic, client characteristic, and macro condition) can explain the effect of client type on contractors’ markup decision. The research findings provide useful insights into the cognition of bid pricing as well as the improvement of bidding efficiency. While the research works were situated in China, contractors in other countries could benefit from the research findings in a similar vein.
Resumo:
Current literature warns organisations about a global ageing phenomenon. Workplace ageing is causing a diminishing work pool which has consequences for a sustainable workforce in the future. This phenomenon continues to impact on local government councils in Australia. Australia has one of the world’s most rapidly ageing populations, and there is evidence that Australian local government councils are already resulting in an unsustainable workforce. Consequently, this research program investigated the role of older workers in the Queensland local government workplace in enabling them to extend their working lives towards transitional employment and a sustainable workforce in the future. Transitional Employment is intended as a strategy for enabling individuals to have greater control over their employment options and their employability during the period leading to their final exit from the workforce. There was no evidence of corporate support for older workers in Queensland local government councils other than tokenistic government campaigns encouraging organisations to "better value their older workers". (Queensland Government, 2007d, p.6). TE is investigated as a possible intervention for older workers in the future. The international and national literature review reflected a range of matters impacting on current older workers in the workforce and barriers preventing them from accessing services towards extending their employment beyond the traditional retirement age (60 years) as defined by the Australian Government; an age when individuals can access their superannuation. Learning and development services were identified as one of those barriers. There was little evidence of investment in or consistent approaches to supporting older workers by organisations. Learning and development services appeared at best to be ad hoc, reactive to corporate productivity and outputs with little recognition of the ageing phenomenon (OECD, 2006, p.23) and looming skills and labour shortages (ALGA, 2006, p. 19). Themes from the literature review led to the establishment of three key research questions: 1. What are the current local government workforce issues impacting on skills and labour retention? 2. What are perceptions about the current workplace environment? And, 3. What are the expectations about learning and development towards extending employability of older workers within the local government sector? The research questions were explored by utilising three qualitative empirical studies, using some numerical data for reporting and comparative analysis. Empirical Study One investigated common themes for accessing transitional employment and comprised two phases. A literature review and Study One data analysis enabled the construction of an initial Transitional Employment Model which includes most frequent themes. Empirical Study Two comprised focus groups to further consider those themes. This led to identification of issues impacting the most on access to learning and development by older workers and towards a revised TEM. Findings presented majority support for transitional employment as a strategy for supporting older workers to work beyond their traditional retirement age. Those findings are presented as significant issues impacting on access to transitional employment within the final 3-dimensionsal TEM. The model is intended as a guide for responding to an ageing workforce by local government councils in the future. This study argued for increased and improved corporate support, particularly for learning and development services for older workers. Such support will enable older workers to maintain their employability and extend their working lives; a sustainable workforce in the future.
Resumo:
In much the same terms as Australia, New Zealand state schools are funded on a socio-economic status model. The New Zealand model is known as a ‘decile’ system. A decile system is one that “indicates the extent to which the school draws its students from low socio-economic communities” so that students in a Decile 1 school “are the 10% of schools with the highest proportion of students from low socio-economic communities”1. The effect of decile funding is supposed to be that funding to state and state-integrated schools is structured to enable schools to attract funding that meets the specific needs of students from lower socio-economic communities. The lower the school’s decile, the more funding they receive”2. This leads to two interesting questions for the uninitiated into New Zealand education. Firstly, how are deciles calculated? Secondly, what is a state school and how is it different from a state-integrated school?
Resumo:
Information that is elicited from experts can be treated as `data', so can be analysed using a Bayesian statistical model, to formulate a prior model. Typically methods for encoding a single expert's knowledge have been parametric, constrained by the extent of an expert's knowledge and energy regarding a target parameter. Interestingly these methods have often been deterministic, in that all elicited information is treated at `face value', without error. Here we sought a parametric and statistical approach for encoding assessments from multiple experts. Our recent work proposed and demonstrated the use of a flexible hierarchical model for this purpose. In contrast to previous mathematical approaches like linear or geometric pooling, our new approach accounts for several sources of variation: elicitation error, encoding error and expert diversity. Of interest are the practical, mathematical and philosophical interpretations of this form of hierarchical pooling (which is both statistical and parametric), and how it fits within the subjective Bayesian paradigm. Case studies from a bioassay and project management (on PhDs) are used to illustrate the approach.
Resumo:
Project Management (PM) as an academic field is relatively new in Australian universities. Moreover, the field is distributed across four main areas: business (management), built environment and construction, engineering and more recently ICT (information systems). At an institutional level, with notable exceptions, there is little engagement between researchers working in those individual areas. Consequently, an initiative was launched in 2009 to create a network of PM researchers to build a disciplinary base for PM in Australia. The initiative took the form of a bi-annual forum. The first forum established the constituency and spread of PM research in Australia (Sense et al., 2011). This special issue of IJPM arose out of the second forum, held in 2012, that explored the notion of an Australian perspective on PM. At the forum, researchers were invited to collaborate to explore issues, methodological approaches, and theoretical positions underpinning their research and to answer the question: is there a distinctly Australian research agenda which responds to the current challenges of large and complex projects in our region? From a research point of view, it was abundantly clear at the forum that many of the issues facing Australian researchers are shared around the world. However, what emerged from the forum as the Australian perspective was a set of themes and research issues that dominate the Australia research agenda.
Resumo:
The Australian economy is currently supported by a resources boom and work opportunities in traditionally male dominated fields of construction and engineering and information technology are at a premium. Yet despite more than 25 years of anti discrimination and equal employment opportunity legislation these industries still employ few women in operational or management roles. This paper investigates the issue of the low representation of women in project management and their different work and career experiences through interviews with male and female project managers.
Resumo:
While entrepreneurship research has taken firm formation to be the predominant mode of opportunity exploitation, entrepreneurship can take place through many other types of organizational arrangements. In the present article, we consider one such alternative arrangement, namely the formation of inter-organizational projects (IOPs). We propose a multi-level contingency model that suggests that uncertainty both at the level of the firm and at the level of the environment makes the exploitation of opportunities through IOPs more likely. The model is tested by telephone survey data collected amongst a panel of 1725 SMEs and longitudinal industry data. Our findings provide strong support for the industry-level part of the model, but interestingly, only partial support for the firm level part of the model. This indicates that the effects of uncertainty need to be dissected into different levels of analysis to understand the conditions under which alternative modes of opportunity exploitation can be a prominent entrepreneurial alternative to new firm formation.
Resumo:
The construction industry has an obligation to respond to sustainability expectations of our society. Solutions that integrate innovative, intelligent and sustainability deliverables are vital for us to meet new and emerging challenges. Industrialised Building Systems (IBS), or known otherwise as prefabrication, employs a combination of ready-made components in the construction of buildings. They promote quality of production, enhance simplification of construction processes and minimise waste. The unique characteristics of this construction method respond well to sustainability. Despite the promises however, IBS has yet to be effectively implemented in Malaysia. There are often misconceptions among key stakeholders about IBS applications. The existing rating schemes fail to assess IBS against sustainability measures. To ensure the capture of full sustainability potential in buildings developed, the critical factors and action plans agreeable to all participants in the development processes need to be identified. Through questionnaire survey, eighteen critical factors relevant to IBS sustainability were identified and encapsulated into a conceptual framework to coordinate a systematic IBS decision making approach. Five categories were used to separate the critical factors into: ecological performance; economic value; social equity and culture; technical quality; and implementation and enforcement. This categorisation extends the "Triple Bottom Lines" to include social, economic, environmental and institutional dimensions. Semi-structured interviews help identify strategies of actions and solutions of potential problems through a SWOT analysis framework. These tools help the decision-makers maximise the opportunities by using available strengths, avoid weaknesses, and diagnose possible threats in the examined issues. The recommendations formed an integrated action plan to present information on what and how to improve sustainability through tackling each critical factor during IBS development. It can be used as part of the project briefing documents for IBS designers. For validation and finalisation the research deliverables, three case studies were conducted. The research fills a current gap by responding to IBS project scenarios in developing countries. It also provides a balanced view for designers to better understand sustainability potential and prioritize attentions to manage sustainability issues in IBS applications.
Resumo:
The Review of Australian Higher Education (Bradley Review: 2008) identified the need for tertiary institutions to incorporate Indigenous knowledges into curriculum to improve educational outcomes for Indigenous Australians and to increase the cultural competency of all students. It recommended that higher education providers ensure that the institutional culture, the cultural competence of staff and the nature of the curriculum supports the participation of Indigenous students, and that Indigenous knowledge be embedded into curriculum so that all students have an understanding of Indigenous culture. While cultural competency has been recognised as an essential element of professional practice in health services internationally, and legal practice in the United States, very little work has been done to promote the cultural competency of legal professionals in the Australian context. This paper will discuss a pilot cultural competency professional development program for legal academics at Queensland University of Technology (Brisbane) developed with the assistance of a Faculty of Law Teaching and Learning Grant in 2011-2012, and tell one Murri’s journey to foster Indigenous cultural competency in an Australian law school.
Resumo:
Social networking sites (SNSs), with their large numbers of users and large information base, seem to be perfect breeding grounds for exploiting the vulnerabilities of people, the weakest link in security. Deceiving, persuading, or influencing people to provide information or to perform an action that will benefit the attacker is known as “social engineering.” While technology-based security has been addressed by research and may be well understood, social engineering is more challenging to understand and manage, especially in new environments such as SNSs, owing to some factors of SNSs that reduce the ability of users to detect the attack and increase the ability of attackers to launch it. This work will contribute to the knowledge of social engineering by presenting the first two conceptual models of social engineering attacks in SNSs. Phase-based and source-based models are presented, along with an intensive and comprehensive overview of different aspects of social engineering threats in SNSs.
Resumo:
Lesson studies are a powerful form of professional development (Doig and Groves, 2011). The processes of creating, enacting, analyzing, and refining lessons to improve teaching practices are key components of lesson studies. Lesson studies have been the primary form of professional development in Japanese classrooms for many years (Lewis, Perry and Hurd, 2009). This model is now used to improve instruction in many South-East Asian countries (White and Lim, 2008), as well as increasingly in North America (Lesson Study Research Group, 2004), and South Africa (Ono and Ferreira, 2010). In China, this form of professional development aimed at improving teaching, has also been adopted, originating from Soviet models of teacher professional development arising from influences post 1949 (China Education Yearbook, 1986). Thus, China too has a long history of improving teaching and learning through this form of school-based professional learning.
Resumo:
Agile Project Management (APM) is a human-centred method for increasing customer-perceived value in a reliable manner. It has been proven to be particularly suited to creative projects such as Information Systems (IS) development and new product development in the automotive industry (this is in contrast to ‘lean production’ which has proved so useful to automotive production waste elimination). Construction is similarly largely a creative industry and might usefully adopt APM to improve its own reliable value delivery, rather than solely following the industrial trend of lean production. This paper describes APM, comparing it with two prominent lean construction initiatives, and then assesses by phase the potential for any impact of APM in construction. In conclusion: APM would have benefits for all phases of construction, particularly in planning and design, but its adoption for actual construction would generally be disrupted because of the lack of a coherent, well trained and trusted workforce.
Resumo:
Recent information systems development using agile project management has yielded a 50% reduction in effort, together with significant improvements in organisational skills, productivity, quality and business satisfaction.
Resumo:
ROBERT EVAPORATORS in Australian sugar factories are traditionally constructed with 44.45 mm outside diameter stainless steel tubes of ~2 m length for all stages of evaporation. There are a few vessels with longer tubes (up to 2.8 m) and smaller and larger diameters (38.1 and 50.8 mm). Queensland University of Technology is undertaking a study to investigate the heat transfer performance of tubes of different lengths and diameters for the whole range of process conditions typically encountered in the evaporator set. Incorporation of these results into practical evaporator designs requires an understanding of the cost implications for constructing evaporator vessels with calandrias having tubes of different dimensions. Cost savings are expected for tubes of smaller diameter and longer length in terms of material, labour and installation costs in the factory. However these savings must be considered in terms of the heat transfer area requirements for the evaporation duty, which will likely be a function of the tube dimensions. In this paper a capital cost model is described which provides a relative cost of constructing and installing Robert evaporators of the same heating surface area but with different tube dimensions. Evaporators of 2000, 3000, 4000 and 5000 m2 are investigated. This model will be used in conjunction with the heat transfer efficiency data (when available) to determine the optimum tube dimensions for a new evaporator at a specified evaporation duty. Consideration is also given to other factors such as juice residence time (and implications for sucrose degradation and control) and droplet de-entrainment in evaporators of different tube dimensions.
Resumo:
FOR SUGAR factories with cogeneration plants major changes to the process stations have been undertaken to reduce the consumption of exhaust steam from the turbines and maximise the generated power. In many cases the process steam consumption has been reduced from greater than 52% on cane to ~40% on cane. The main changes have been to install additional evaporation area at the front of the set, operate the pan stages on vapour from No 1 or No 2 effects and undertake juice heating using vapour bleed from evaporators as far down the set as the penultimate stage. Operationally, one of the main challenges has been to develop a control system for the evaporators that addresses the objectives of juice processing rate (throughput) and steam economy, while producing syrup consistently at the required brix and providing an adequate and consistent vapour pressure for the pan stage operations. The cyclic demand for vapour by batch pans causes process disturbances through the evaporator set and these must be regulated in an effective manner to satisfy the above list of objectives for the evaporator station. The impact of the cyclic pan stage vapour demand has been modelled to define the impact on juice rate, steam economy, syrup brix and head space pressures in the evaporators. Experiences with the control schemes used at Pioneer and Rocky Point Mills are discussed. For each factory the paper provides information on (a) the control system used, the philosophy behind the control system and experiences in reaching the current system for control (b) the performance of the control system to handle the disturbances imposed by the pan stage and operate within other constraints of the factory (c) deficiencies in the current system and plans for further improvements. Other processing changes to boost the performance of the evaporators are also discussed.