875 resultados para disproportionality between interest at stake and costs of litigating


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Satellite observations of convective system properties and lightning flash rate are used to investigate the ability of potential lightning parameterizations to capture both the dominant land-ocean contrast in lightning occurrence and regional differences between Africa, the Amazon and the islands of the maritime continent. As found in previous studies, the radar storm height is tightly correlated with the lightning flash rate. A roughly second order power-law fit to the mean radar echo top height above the 0C isotherm is shown to capture both regional and land-ocean contrasts in lightning occurrence and flash rate using a single set of parameters. Recent developments should soon make it possible to implement a parameterization of this kind in global models. Parameterizations based on cloud top height, convective rain rate and convective rain fraction all require the use of separate fits over land and ocean and fail to capture observed differences between continental regions.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In curved geometries the hydrostatic pressure in a fluid does not equal the weight per unit area of the fluid above it. General weight–pressure and mass–pressure relationships for hydrostatic fluids in any geometry are derived. As an example of the mass–pressure relationship, we find a geometric reduction in surface pressure as large as 5 mbar on Earth and 39 mbar on Titan. We also present a thermodynamic interpretation of the geometric correction which, as a corollary, provides an independent proof of the hydrostatic relationship for general geometries.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Relationships between clear-sky longwave radiation and aspects of the atmospheric hydrological cycle are quantified in models, reanalyses, and observations over the period 1980-2000. The robust sensitivity of clear-sky surface net longwave radiation (SNLc) to column-integrated water vapor (CWV) of 1-1.5 Wm(-2) mm(-1) combined with the positive relationship between CWV and surface temperature (T-s) explains substantial increases in clear-sky longwave radiative cooling of the atmosphere (Q(LWc)) to the surface over the period. Clear-sky outgoing longwave radiation (OLRc) is highly sensitive to changes in aerosol and greenhouse gas concentrations in addition to temperature and humidity. Over tropical ocean regions of mean descent, Q(LWc) increases with T-s at similar to 3.5-5.5 W m(-2) K-1 for reanalyses, estimates derived from satellite data, and models without volcanic forcing included. Increased Q(LWc) with warming across the tropical oceans helps to explain model ensemble mean increases in precipitation of 0.1-0.15 mm day(-1) K-1, which are primarily determined by ascent regions where precipitation increases at the rate expected from the Clausius-Clapeyron equation. The implications for future projections in the atmospheric hydrological cycle are discussed

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The costs of procurement are transaction costs which are separate from the direct costs of a project. In this paper discussion is concentrated on costs of tendering. Types of cost, including money costs and opportunity costs, short-term and long-term costs, private and social costs are defined and examined in relation to various types of product and methods of procurement. The costs of the contractor and of the client are considered and tentative conclusions drawn as to who bears these costs in the short-run and in the long run. They may fall on the parties to the process for the particular project, on other contractors and clients or on society as a whole.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The cost of tendering in the construction industry is widely suspected to be excessive, but there is little robust empirical evidence to demonstrate this. It also seems that innovative working practices may reduce the costs of undertaking construction projects and the consequent improvement in relationships should increase overall value for money. The aim of this proposed research project is to develop mechanisms for measuring the true costs of tendering based upon extensive in-house data collection undertaken in a range of different construction firms. The output from this research will enable all participants in the construction process to make better decisions about how to select members of the team and identify the price and scope of their obligations.