906 resultados para Project management offices
Resumo:
This thesis was carried out as a case study of a company YIT in order to clarify the sev-erest risks for the company and to build a method for project portfolio evaluation. The target organization creates new living environment by constructing residential buildings, business premises, infrastructure and entire areas worth for EUR 1.9 billion in the year 2013. Company has noted project portfolio management needs more information about the structure of project portfolio and possible influences of market shock situation. With interviews have been evaluated risks with biggest influence and most appropriate metrics to examine. The major risks for the company were evaluated by interviewing the executive staff. At the same time, the most appropriate risk metrics were considered. At the moment sales risk was estimated to have biggest impact on company‟s business. Therefore project port-folio evaluation model was created and three different scenarios for company‟s future were created in order to identify the scale of possible market shock situation. The created model is tested with public and descriptive figures of YIT in a one-year-long market shock and the impact on different metrics was evaluated. Study was conducted using con-structive research methodology. Results indicate that company has notable sales risk in certain sections of business portfolio.
Resumo:
This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.
Resumo:
The technique of linear responsibility analysis is used for a retrospective case study of a private industrial development consisting of an engineering factory and offices. A multi-disciplinary professional practice was used to manage and design the project. The organizational structure adopted on the project is analysed using concepts from systems theory which are included in Walker's theoretical model of the structure of building project organizations (Walker, 1981). This model proposes that the process of buildings provision can be viewed as systems and sub-systems which are differentiated form each other at decision points. Further to this, the sub-systematic analysis of the relationship between the contributors gives a quantitative assessment of the efficiency of the organizational structure used. There was a high level of satisfaction with the completed project and this is reflected by the way in which the organization structure corresponded to the model's proposition. However, the project was subject to string environmental forces which the project organization was not capable of entirely overcoming.
Resumo:
The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.