906 resultados para Project Management - Informatica


Relevância:

40.00% 40.00%

Publicador:

Resumo:

This research was undertaken with an objective of studying software development project risk, risk management, project outcomes and their inter-relationship in the Indian context. Validated instruments were used to measure risk, risk management and project outcome in software development projects undertaken in India. A second order factor model was developed for risk with five first order factors. Risk management was also identified as a second order construct with four first order factors. These structures were validated using confirmatory factor analysis. Variation in risk across categories of select organization / project characteristics was studied through a series of one way ANOVA tests. Regression model was developed for each of the risk factors by linking it to risk management factors and project /organization characteristics. Similarly regression models were developed for the project outcome measures linking them to risk factors. Integrated models linking risk factors, risk management factors and project outcome measures were tested through structural equation modeling. Quality of the software developed was seen to have a positive relationship with risk management and negative relationship with risk. The other outcome variables, namely time overrun and cost over run, had strong positive relationship with risk. Risk management did not have direct effect on overrun variables. Risk was seen to be acting as an intervening variable between risk management and overrun variables.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Actualmente, el estudio de la cultura organizacional se ha convertido en un tema de gran importancia para las empresas ya que, de acuerdo a que tan satisfecho este el empleado, esta tiene un impacto en el desempeño de la compañía, además se vuelve en un factor clave para el fracaso o el éxito de cada uno de los proyectos o tecnologías de gestión que implemente la organización. La cultura organizacional según el autor Carlos Eduardo Méndez Álvarez (2006) es: La conciencia colectiva que se expresa en el sistema de significados compartidos por los miembros de la organización que los identifica y diferencia de otros institucionalizando y estandarizando sus conductas sociales. Tales significados y comportamientos son determinados por el concepto que tiene el líder de la organización tiene sobre el hombre, la estructura, el sistema cultural y el clima organizacional así como por la interrelación y mutua influencia que existe entre estos. Basados en el concepto de este autor, se va a realizar el estudio de cultura organizacional en la empresa Informática Documental SAS, dedicada al manejo y control de documentación a nivel nacional, en el cual, se va a conocer una descripción detallada del comportamiento de los miembros de la organización.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The management of a public sector project is analysed using a model developed from systems theory. Linear responsibility analysis is used to identify the primary and key decision structure of the project and to generate quantitative data regarding differentiation and integration of the operating system, the managing system and the client/project team. The environmental context of the project is identified. Conclusions are drawn regarding the project organization structure's ability to cope with the prevailing environmental conditions. It is found that the complexity of the managing system imposed on the project was unable to achieve this and created serious deficiencies in the outcome of the project.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Changes to client requirements are inevitable during construction. Industry discourse is concerned with minimizing and controlling changes. However, accounts of practices involved in making changes are rare. In response to calls for more research into working practices, an ethnographic study of a live hospital project was undertaken to explore how changes are made. A vignette of a meeting exploring the investigation of changes illustrates the issues. This represents an example from the ethnographic fieldwork, which produced many observations. There was a strong emphasis on using change management procedures contained within the contract to investigate changes, even when it was known that the change was not required. For the practitioners, this was a way of demonstrating best practice, transparent and accountable decision-making regarding changes. Hence, concerns for following procedures sometimes overshadowed considerations about whether or not a change was required to improve the functionality of the building. However, the procedures acted as boundary objects between the communities of practice involved on the project by coordinating the work of managing changes. Insights suggest how contract procedures facilitate and impede the making of changes, which can inform policy guidance and contract drafting.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The work concerns development of a prototype molecular tests to identify vitality status of conifer seedlings. The work is done by NSure, Holland, Dalarna University and SUAS. In case for spruce, a successful validation experiment has been performed to validate the identified frost tolerance and vitality genes. Multiple indicators were identified that can be used to either reinforce the existing ColdnSure test, but also for development of a vitality test. The identified frost tolerance and vitality genes for pine still need to be validated. NSure together with Dalarna University aim to perform a validation next season. Multiple LN indicators were identified in spruce that can be used to determine the effectiveness of a LN treatment, but they are not yet validated. In spruce and pine hardly any scientific research is performed to study the effect of a LN treatment, particularly not at molecular level. Therefore NSure together with Dalarna Research Station want to apply for a project. Within this project, we would be able to develop the tests further.