1000 resultados para Project Limulus
Resumo:
The author gives a financial and economic valuation of the operation of vessels in the 38 foot GRP class. He discusses particularly the materials and methods of fishing they use, species composition of their catches, their rate of return, break-even analysis, financial and social analysis.
Resumo:
A study on the status of fisheries and environmental impact assessment (EIA) was conducted on Bashundhara Baridhara Housing Project (BBHP), Dhaka, Bangladesh for prediction and measure the effects of housing project related development activities that have already been implemented and planned for future implementation. The project is still under development phase and so far allotted 10,000 plots of different sizes. The study shows that the original water bodies and natural fish production there from have greatly declined due to earth filling carried out for development of land for the housing. The physico-chemical parameters of the existing water body within the project area were found to be suitable for fish farming in the estate. A number of economically important fish species are found available in the existing lake. However, the natural fisheries resources of the existing lake is under great stress due to the changes made in the ecosystem, siltation, construction of building and dumping of house building and household waste materials. This has caused some important fish species of the lake to become critically endangered and vulnerable which have been documented in this paper. Appropriate regulatory and mitigating measures with respect to water management, disposal of construction garbage and other biomedical toxic substances far away from the water bodies are required to be taken to keep the water safe and suitable for fish production as well as for multipurpose use of the lake water.
Resumo:
Water service providers (WSPs) in the UK have statutory obligations to supply drinking water to all customers that complies with increasingly stringent water quality regulations and minimum flow and pressure criteria. At the same time, the industry is required by regulators and investors to demonstrate increasing operational efficiency and to meet a wide range of performance criteria that are expected to improve year-on-year. Most WSPs have an ideal for improving the operation of their water supply systems based on increased knowledge and understanding of their assets and a shift to proactive management followed by steadily increasing degrees of system monitoring, automation and optimisation. The fundamental mission is, however, to ensure security of supply, with no interruptions and water quality of the highest standard at the tap. Unfortunately, advanced technologies required to fully understand, manage and automate water supply system operation either do not yet exist, are only partially evolved, or have not yet been reliably proven for live water distribution systems. It is this deficiency that the project NEPTUNE seeks to address by carrying out research into 3 main areas; these are: data and knowledge management; pressure management (including energy management); and the associated complex decision support systems on which to base interventions. The 3-year project started in April of 2007 and has already resulted in a number of research findings under the three main research priority areas (RPA). The paper summarises in greater detail the overall project objectives, the RPA activities and the areas of research innovation that are being undertaken in this major, UK collaborative study. Copyright 2009 ASCE.
Resumo:
The paper presented a gender audit of international and regional instruments in the eight BOBLME countries. Uneven progress in tackling gender inequalities was found. Entry points to mainstream gender in the Strategic Action Plan(SAP) were identified and key recommendations to BOBLME partner countries were made.
Resumo:
A host of methods and tools to support designing are being developed in Cambridge EDC. These range from tools for design management to those for the generation and selection of design ideas, layouts, materials and production processes. A project, to develop a device to improve arm mobility of muscular dystrophy sufferers, is undertaken as a test-bed to evaluate and improve these methods and tools as well as to observe and modify its design and management processes. This paper presents the difficulties and advantages of using design methods and tools within this rehabilitation design context, with special focus on the evolution of the designs, tools, and management processes.