824 resultados para Power system planning


Relevância:

80.00% 80.00%

Publicador:

Resumo:

Electrical power systems are changing their traditional structure, which was based on a little number of large generating power plants placed at great distances from loads by new models that tend to split the big production nodes in many smaller ones. The set of small groups which are located close to consumers and provide safe and quality energy is called distributed generation (DG). The proximity of the sources to the loads reduces losses associated with transportation and increases overall system efficiency. DG also favors the inclusion of renewable energy sources in isolated electrical systems or remote microgrids, because they can be installed where the natural resource is located. In both cases, as weak grids unable to get help from other nearby networks, it is essential to ensure appropriate behavior of DG sources to guarantee power system safety and stability. The grid codes sets out the technical requirements to be fulfilled for the sources connected in these electrical networks. In technical literature it is rather easy to find and compare grid codes for interconnected electrical systems. However, the existing literature is incomplete and sparse regarding isolated electrical systems and this happens due to the difficulties inherent in the pursuit of codes. Some countries have developed their own legislation only for their island territory (as Spain or France), others apply the same set of rules as in mainland, another group of island countries have elaborated a complete grid code for all generating sources and some others lack specific regulation. This paper aims to make a complete review of the state of the art in grid codes applicable to isolated systems, setting the comparison between them and defining the guidelines predictably followed by the upcoming regulations in these particular systems.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

I. GENERALIDADES 1.1. Introducción Entre los diversos tipos de perturbaciones eléctricas, los huecos de tensión son considerados el problema de calidad de suministro más frecuente en los sistemas eléctricos. Este fenómeno es originado por un aumento extremo de la corriente en el sistema, causado principalmente por cortocircuitos o maniobras inadecuadas en la red. Este tipo de perturbación eléctrica está caracterizado básicamente por dos parámetros: tensión residual y duración. Típicamente, se considera que el hueco se produce cuando la tensión residual alcanza en alguna de las fases un valor entre 0.01 a 0.9 pu y tiene una duración de hasta 60 segundos. Para un usuario final, el efecto más relevante de un hueco de tensión es la interrupción o alteración de la operación de sus equipos, siendo los dispositivos de naturaleza electrónica los principalmente afectados (p. ej. ordenador, variador de velocidad, autómata programable, relé, etc.). Debido al auge tecnológico de las últimas décadas y a la búsqueda constante de automatización de los procesos productivos, el uso de componentes electrónicos resulta indispensable en la actualidad. Este hecho, lleva a que los efectos de los huecos de tensión sean más evidentes para el usuario final, provocando que su nivel de exigencia de la calidad de energía suministrada sea cada vez mayor. De forma general, el estudio de los huecos de tensión suele ser abordado bajo dos enfoques: en la carga o en la red. Desde el punto de vista de la carga, se requiere conocer las características de sensibilidad de los equipos para modelar su respuesta ante variaciones súbitas de la tensión del suministro eléctrico. Desde la perspectiva de la red, se busca estimar u obtener información adecuada que permita caracterizar su comportamiento en términos de huecos de tensión. En esta tesis, el trabajo presentado se encuadra en el segundo aspecto, es decir, en el modelado y estimación de la respuesta de un sistema eléctrico de potencia ante los huecos de tensión. 1.2. Planteamiento del problema A pesar de que los huecos de tensión son el problema de calidad de suministro más frecuente en las redes, hasta la actualidad resulta complejo poder analizar de forma adecuada este tipo de perturbación para muchas compañías del sector eléctrico. Entre las razones más comunes se tienen: - El tiempo de monitorización puede llegar a ser de varios años para conseguir una muestra de registros de huecos estadísticamente válida. - La limitación de recursos económicos para la adquisición e instalación de equipos de monitorización de huecos. - El elevado coste operativo que implica el análisis de los datos de los medidores de huecos de tensión instalados. - La restricción que tienen los datos de calidad de energía de las compañías eléctricas. Es decir, ante la carencia de datos que permitan analizar con mayor detalle los huecos de tensión, es de interés de las compañías eléctricas y la academia poder crear métodos fiables que permitan profundizar en el estudio, estimación y supervisión de este fenómeno electromagnético. Los huecos de tensión, al ser principalmente originados por eventos fortuitos como los cortocircuitos, son el resultado de diversas variables exógenas como: (i) la ubicación de la falta, (ii) la impedancia del material de contacto, (iii) el tipo de fallo, (iv) la localización del fallo en la red, (v) la duración del evento, etc. Es decir, para plantear de forma adecuada cualquier modelo teórico sobre los huecos de tensión, se requeriría representar esta incertidumbre combinada de las variables para proveer métodos realistas y, por ende, fiables para los usuarios. 1.3. Objetivo La presente tesis ha tenido como objetivo el desarrollo diversos métodos estocásticos para el estudio, estimación y supervisión de los huecos de tensión en los sistemas eléctricos de potencia. De forma específica, se ha profundizado en los siguientes ámbitos: - En el modelado realista de las variables que influyen en la caracterización de los huecos. Esto es, en esta Tesis se ha propuesto un método que permite representar de forma verosímil su cuantificación y aleatoriedad en el tiempo empleando distribuciones de probabilidad paramétricas. A partir de ello, se ha creado una herramienta informática que permite estimar la severidad de los huecos de tensión en un sistema eléctrico genérico. - Se ha analizado la influencia la influencia de las variables de entrada en la estimación de los huecos de tensión. En este caso, el estudio se ha enfocado en las variables de mayor divergencia en su caracterización de las propuestas existentes. - Se ha desarrollado un método que permite estima el número de huecos de tensión de una zona sin monitorización a través de la información de un conjunto limitado de medidas de un sistema eléctrico. Para ello, se aplican los principios de la estadística Bayesiana, estimando el número de huecos de tensión más probable de un emplazamiento basándose en los registros de huecos de otros nudos de la red. - Plantear una estrategia para optimizar la monitorización de los huecos de tensión en un sistema eléctrico. Es decir, garantizar una supervisión del sistema a través de un número de medidores menor que el número de nudos de la red. II. ESTRUCTURA DE LA TESIS Para plantear las propuestas anteriormente indicadas, la presente Tesis se ha estructurado en seis capítulos. A continuación, se describen brevemente los mismos. A manera de capítulo introductorio, en el capítulo 1, se realiza una descripción del planteamiento y estructura de la presente tesis. Esto es, se da una visión amplia de la problemática a tratar, además de describir el alcance de cada capítulo de la misma. En el capítulo 2, se presenta una breve descripción de los fundamentos y conceptos generales de los huecos de tensión. Los mismos, buscan brindar al lector de una mejor comprensión de los términos e indicadores más empleados en el análisis de severidad de los huecos de tensión en las redes eléctricas. Asimismo, a manera de antecedente, se presenta un resumen de las principales características de las técnicas o métodos existentes aplicados en la predicción y monitorización óptima de los huecos de tensión. En el capítulo 3, se busca fundamentalmente conocer la importancia de las variables que determinen la frecuencia o severidad de los huecos de tensión. Para ello, se ha implementado una herramienta de estimación de huecos de tensión que, a través de un conjunto predeterminado de experimentos mediante la técnica denominada Diseño de experimentos, analiza la importancia de la parametrización de las variables de entrada del modelo. Su análisis, es realizado mediante la técnica de análisis de la varianza (ANOVA), la cual permite establecer con rigor matemático si la caracterización de una determinada variable afecta o no la respuesta del sistema en términos de los huecos de tensión. En el capítulo 4, se propone una metodología que permite predecir la severidad de los huecos de tensión de todo el sistema a partir de los registros de huecos de un conjunto reducido de nudos de dicha red. Para ello, se emplea el teorema de probabilidad condicional de Bayes, el cual calcula las medidas más probables de todo el sistema a partir de la información proporcionada por los medidores de huecos instalados. Asimismo, en este capítulo se revela una importante propiedad de los huecos de tensión, como es la correlación del número de eventos de huecos de tensión en diversas zonas de las redes eléctricas. En el capítulo 5, se desarrollan dos métodos de localización óptima de medidores de huecos de tensión. El primero, que es una evolución metodológica del criterio de observabilidad; aportando en el realismo de la pseudo-monitorización de los huecos de tensión con la que se calcula el conjunto óptimo de medidores y, por ende, en la fiabilidad del método. Como una propuesta alternativa, se emplea la propiedad de correlación de los eventos de huecos de tensión de una red para plantear un método que permita establecer la severidad de los huecos de todo el sistema a partir de una monitorización parcial de dicha red. Finalmente, en el capítulo 6, se realiza una breve descripción de las principales aportaciones de los estudios realizados en esta tesis. Adicionalmente, se describen diversos temas a desarrollar en futuros trabajos. III. RESULTADOS En base a las pruebas realizadas en las tres redes planteadas; dos redes de prueba IEEE de 24 y 118 nudos (IEEE-24 e IEEE-118), además del sistema eléctrico de la República del Ecuador de 357 nudos (EC-357), se describen los siguientes puntos como las observaciones más relevantes: A. Estimación de huecos de tensión en ausencia de medidas: Se implementa un método estocástico de estimación de huecos de tensión denominado PEHT, el cual representa con mayor realismo la simulación de los eventos de huecos de un sistema a largo plazo. Esta primera propuesta de la tesis, es considerada como un paso clave para el desarrollo de futuros métodos del presente trabajo, ya que permite emular de forma fiable los registros de huecos de tensión a largo plazo en una red genérica. Entre las novedades más relevantes del mencionado Programa de Estimación de Huecos de Tensión (PEHT) se tienen: - Considerar el efecto combinado de cinco variables aleatorias de entrada para simular los eventos de huecos de tensión en una pseudo-monitorización a largo plazo. Las variables de entrada modeladas en la caracterización de los huecos de tensión en el PEHT son: (i) coeficiente de fallo, (ii) impedancia de fallo, (iii) tipo de fallo, (iv) localización del fallo y (v) duración. - El modelado estocástico de las variables de entrada impedancia de fallo y duración en la caracterización de los eventos de huecos de tensión. Para la parametrización de las variables mencionadas, se realizó un estudio detallado del comportamiento real de las mismas en los sistemas eléctricos. Asimismo, se define la función estadística que mejor representa la naturaleza aleatoria de cada variable. - Considerar como variables de salida del PEHT a indicadores de severidad de huecos de uso común en las normativas, como es el caso de los índices: SARFI-X, SARFI-Curve, etc. B. Análisis de sensibilidad de los huecos de tensión: Se presenta un estudio causa-efecto (análisis de sensibilidad) de las variables de entrada de mayor divergencia en su parametrización entre las referencias relacionadas a la estimación de los huecos de tensión en redes eléctricas. De forma específica, se profundiza en el estudio de la influencia de la parametrización de las variables coeficiente de fallo e impedancia de fallo en la predicción de los huecos de tensión. A continuación un resumen de las conclusiones más destacables: - La precisión de la variable de entrada coeficiente de fallo se muestra como un parámetro no influyente en la estimación del número de huecos de tensión (SARFI-90 y SARFI-70) a largo plazo. Es decir, no se requiere de una alta precisión del dato tasa de fallo de los elementos del sistema para obtener una adecuada estimación de los huecos de tensión. - La parametrización de la variable impedancia de fallo se muestra como un factor muy sensible en la estimación de la severidad de los huecos de tensión. Por ejemplo, al aumentar el valor medio de esta variable aleatoria, se disminuye considerablemente la severidad reportada de los huecos en la red. Por otra parte, al evaluar el parámetro desviación típica de la impedancia de fallo, se observa una relación directamente proporcional de este parámetro con la severidad de los huecos de tensión de la red. Esto es, al aumentar la desviación típica de la impedancia de fallo, se evidencia un aumento de la media y de la variación interanual de los eventos SARFI-90 y SARFI-70. - En base al análisis de sensibilidad desarrollado en la variable impedancia de fallo, se considera muy cuestionable la fiabilidad de los métodos de estimación de huecos de tensión que omiten su efecto en el modelo planteado. C. Estimación de huecos de tensión en base a la información de una monitorización parcial de la red: Se desarrolla un método que emplea los registros de una red parcialmente monitorizada para determinar la severidad de los huecos de todo el sistema eléctrico. A partir de los casos de estudio realizados, se observa que el método implementado (PEHT+MP) posee las siguientes características: - La metodología propuesta en el PEHT+MP combina la teoría clásica de cortocircuitos con diversas técnicas estadísticas para estimar, a partir de los datos de los medidores de huecos instalados, las medidas de huecos de los nudos sin monitorización de una red genérica. - El proceso de estimación de los huecos de tensión de la zona no monitorizada de la red se fundamenta en la aplicación del teorema de probabilidad condicional de Bayes. Es decir, en base a los datos observados (los registros de los nudos monitorizados), el PEHT+MP calcula de forma probabilística la severidad de los huecos de los nudos sin monitorización del sistema. Entre las partes claves del procedimiento propuesto se tienen los siguientes puntos: (i) la creación de una base de datos realista de huecos de tensión a través del Programa de Estimación de Huecos de Tensión (PEHT) propuesto en el capítulo anterior; y, (ii) el criterio de máxima verosimilitud empleado para estimar las medidas de huecos de los nudos sin monitorización de la red evaluada. - Las predicciones de medidas de huecos de tensión del PEHT+MP se ven potenciadas por la propiedad de correlación de los huecos de tensión en diversas zonas de un sistema eléctrico. Esta característica intrínseca de las redes eléctricas limita de forma significativa la respuesta de las zonas fuertemente correlacionadas del sistema ante un eventual hueco de tensión. Como el PEHT+MP está basado en principios probabilísticos, la reducción del rango de las posibles medidas de huecos se ve reflejado en una mejor predicción de las medidas de huecos de la zona no monitorizada. - Con los datos de un conjunto de medidores relativamente pequeño del sistema, es posible obtener estimaciones precisas (error nulo) de la severidad de los huecos de la zona sin monitorizar en las tres redes estudiadas. - El PEHT+MP se puede aplicar a diversos tipos de indicadores de severidad de los huecos de tensión, como es el caso de los índices: SARFI-X, SARFI-Curve, SEI, etc. D. Localización óptima de medidores de huecos de tensión: Se plantean dos métodos para ubicar de forma estratégica al sistema de monitorización de huecos en una red genérica. La primera propuesta, que es una evolución metodológica de la localización óptima de medidores de huecos basada en el criterio de observabilidad (LOM+OBS); y, como segunda propuesta, un método que determina la localización de los medidores de huecos según el criterio del área de correlación (LOM+COR). Cada método de localización óptima de medidores propuesto tiene un objetivo concreto. En el caso del LOM+OBS, la finalidad del método es determinar el conjunto óptimo de medidores que permita registrar todos los fallos que originen huecos de tensión en la red. Por otro lado, en el método LOM+COR se persigue definir un sistema óptimo de medidores que, mediante la aplicación del PEHT+MP (implementado en el capítulo anterior), sea posible estimar de forma precisa las medidas de huecos de tensión de todo el sistema evaluado. A partir del desarrollo de los casos de estudio de los citados métodos de localización óptima de medidores en las tres redes planteadas, se describen a continuación las observaciones más relevantes: - Como la generación de pseudo-medidas de huecos de tensión de los métodos de localización óptima de medidores (LOM+OBS y LOM+COR) se obtienen mediante la aplicación del algoritmo PEHT, la formulación del criterio de optimización se realiza en base a una pseudo-monitorización realista, la cual considera la naturaleza aleatoria de los huecos de tensión a través de las cinco variables estocásticas modeladas en el PEHT. Esta característica de la base de datos de pseudo-medidas de huecos de los métodos LOM+OBS y LOM+COR brinda una mayor fiabilidad del conjunto óptimo de medidores calculado respecto a otros métodos similares en la bibliografía. - El conjunto óptimo de medidores se determina según la necesidad del operador de la red. Esto es, si el objetivo es registrar todos los fallos que originen huecos de tensión en el sistema, se emplea el criterio de observabilidad en la localización óptima de medidores de huecos. Por otra parte, si se plantea definir un sistema de monitorización que permita establecer la severidad de los huecos de tensión de todo el sistema en base a los datos de un conjunto reducido de medidores de huecos, el criterio de correlación resultaría el adecuado. De forma específica, en el caso del método LOM+OBS, basado en el criterio de observabilidad, se evidenciaron las siguientes propiedades en los casos de estudio realizados: - Al aumentar el tamaño de la red, se observa la tendencia de disminuir el porcentaje de nudos monitorizados de dicho sistema. Por ejemplo, para monitorizar los fallos que originan huecos en la red IEEE-24, se requiere monitorizar el 100\% de los nudos del sistema. En el caso de las redes IEEE-118 y EC-357, el método LOM+OBS determina que con la monitorización de un 89.5% y 65.3% del sistema, respectivamente, se cumpliría con el criterio de observabilidad del método. - El método LOM+OBS permite calcular la probabilidad de utilización del conjunto óptimo de medidores a largo plazo, estableciendo así un criterio de la relevancia que tiene cada medidor considerado como óptimo en la red. Con ello, se puede determinar el nivel de precisión u observabilidad (100%, 95%, etc.) con el cual se detectarían los fallos que generan huecos en la red estudiada. Esto es, al aumentar el nivel de precisión de detección de los fallos que originan huecos, se espera que aumente el número de medidores requeridos en el conjunto óptimo de medidores calculado. - El método LOM+OBS se evidencia como una técnica aplicable a todo tipo de sistema eléctrico (radial o mallado), el cual garantiza la detección de los fallos que originan huecos de tensión en un sistema según el nivel de observabilidad planteado. En el caso del método de localización óptima de medidores basado en el criterio del área de correlación (LOM+COR), las diversas pruebas realizadas evidenciaron las siguientes conclusiones: - El procedimiento del método LOM+COR combina los métodos de estimación de huecos de tensión de capítulos anteriores (PEHT y PEHT+MP) con técnicas de optimización lineal para definir la localización óptima de los medidores de huecos de tensión de una red. Esto es, se emplea el PEHT para generar los pseudo-registros de huecos de tensión, y, en base al criterio planteado de optimización (área de correlación), el LOM+COR formula y calcula analíticamente el conjunto óptimo de medidores de la red a largo plazo. A partir de la información registrada por este conjunto óptimo de medidores de huecos, se garantizaría una predicción precisa de la severidad de los huecos de tensión de todos los nudos del sistema con el PEHT+MP. - El método LOM+COR requiere un porcentaje relativamente reducido de nudos del sistema para cumplir con las condiciones de optimización establecidas en el criterio del área de correlación. Por ejemplo, en el caso del número total de huecos (SARFI-90) de las redes IEEE-24, IEEE-118 y EC-357, se calculó un conjunto óptimo de 9, 12 y 17 medidores de huecos, respectivamente. Es decir, solamente se requeriría monitorizar el 38\%, 10\% y 5\% de los sistemas indicados para supervisar los eventos SARFI-90 en toda la red. - El método LOM+COR se muestra como un procedimiento de optimización versátil, el cual permite reducir la dimensión del sistema de monitorización de huecos de redes eléctricas tanto radiales como malladas. Por sus características, este método de localización óptima permite emular una monitorización integral del sistema a través de los registros de un conjunto pequeño de monitores. Por ello, este nuevo método de optimización de medidores sería aplicable a operadores de redes que busquen disminuir los costes de instalación y operación del sistema de monitorización de los huecos de tensión. ABSTRACT I. GENERALITIES 1.1. Introduction Among the various types of electrical disturbances, voltage sags are considered the most common quality problem in power systems. This phenomenon is caused by an extreme increase of the current in the network, primarily caused by short-circuits or inadequate maneuvers in the system. This type of electrical disturbance is basically characterized by two parameters: residual voltage and duration. Typically, voltage sags occur when the residual voltage, in some phases, reaches a value between 0.01 to 0.9 pu and lasts up to 60 seconds. To an end user, the most important effect of a voltage sags is the interruption or alteration of their equipment operation, with electronic devices the most affected (e.g. computer, drive controller, PLC, relay, etc.). Due to the technology boom of recent decades and the constant search for automating production processes, the use of electronic components is essential today. This fact makes the effects of voltage sags more noticeable to the end user, causing the level of demand for a quality energy supply to be increased. In general, the study of voltage sags is usually approached from one of two aspects: the load or the network. From the point of view of the load, it is necessary to know the sensitivity characteristics of the equipment to model their response to sudden changes in power supply voltage. From the perspective of the network, the goal is to estimate or obtain adequate information to characterize the network behavior in terms of voltage sags. In this thesis, the work presented fits into the second aspect; that is, in the modeling and estimation of the response of a power system to voltage sag events. 1.2. Problem Statement Although voltage sags are the most frequent quality supply problem in electrical networks, thistype of disturbance remains complex and challenging to analyze properly. Among the most common reasons for this difficulty are: - The sag monitoring time, because it can take up to several years to get a statistically valid sample. - The limitation of funds for the acquisition and installation of sag monitoring equipment. - The high operating costs involved in the analysis of the voltage sag data from the installed monitors. - The restrictions that electrical companies have with the registered power quality data. That is, given the lack of data to further voltage sag analysis, it is of interest to electrical utilities and researchers to create reliable methods to deepen the study, estimation and monitoring of this electromagnetic phenomenon. Voltage sags, being mainly caused by random events such as short-circuits, are the result of various exogenous variables such as: (i) the number of faults of a system element, (ii) the impedance of the contact material, (iii) the fault type, (iv) the fault location, (v) the duration of the event, etc. That is, to properly raise any theoretical model of voltage sags, it is necessary to represent the combined uncertainty of variables to provide realistic methods that are reliable for users. 1.3. Objective This Thesis has been aimed at developing various stochastic methods for the study, estimation and monitoring of voltage sags in electrical power systems. Specifically, it has deepened the research in the following areas: - This research furthers knowledge in the realistic modeling of the variables that influence sag characterization. This thesis proposes a method to credibly represent the quantification and randomness of the sags in time by using parametric probability distributions. From this, a software tool was created to estimate the severity of voltage sags in a generic power system. - This research also analyzes the influence of the input variables in the estimation of voltage sags. In this case, the study has focused on the variables of greatest divergence in their characterization of the existing proposals. - A method was developed to estimate the number of voltage sags of an area without monitoring through the information of a limited set of sag monitors in an electrical system. To this end, the principles of Bayesian statistics are applied, estimating the number of sags most likely to happen in a system busbar based in records of other sag network busbars. - A strategy was developed to optimize the monitorization of voltage sags on a power system. Its purpose is to ensure the monitoring of the system through a number of monitors lower than the number of busbars of the network assessed. II. THESIS STRUCTURE To describe in detail the aforementioned proposals, this Thesis has been structured into six chapters. Below is are brief descriptions of them: As an introductory chapter, Chapter 1, provides a description of the approach and structure of this thesis. It presents a wide view of the problem to be treated, in addition to the description of the scope of each chapter. In Chapter 2, a brief description of the fundamental and general concepts of voltage sags is presented to provide to the reader a better understanding of the terms and indicators used in the severity analysis of voltage sags in power networks. Also, by way of background, a summary of the main features of existing techniques or methods used in the prediction and optimal monitoring of voltage sags is also presented. Chapter 3 essentially seeks to know the importance of the variables that determine the frequency or severity of voltage sags. To do this, a tool to estimate voltage sags is implemented that, through a predetermined set of experiments using the technique called Design of Experiments, discusses the importance of the parameters of the input variables of the model. Its analysis is interpreted by using the technique of analysis of variance (ANOVA), which provides mathematical rigor to establish whether the characterization of a particular variable affects the system response in terms of voltage sags or not. In Chapter 4, a methodology to predict the severity of voltage sags of an entire system through the sag logs of a reduced set of monitored busbars is proposed. For this, the Bayes conditional probability theorem is used, which calculates the most likely sag severity of the entire system from the information provided by the installed monitors. Also, in this chapter an important property of voltage sags is revealed, as is the correlation of the voltage sags events in several zones of a power system. In Chapter 5, two methods of optimal location of voltage sag monitors are developed. The first one is a methodological development of the observability criteria; it contributes to the realism of the sag pseudo-monitoring with which the optimal set of sag monitors is calculated and, therefore, to the reliability of the proposed method. As an alternative proposal, the correlation property of the sag events of a network is used to raise a method that establishes the sag severity of the entire system from a partial monitoring of the network. Finally, in Chapter 6, a brief description of the main contributions of the studies in this Thesis is detailed. Additionally, various themes to be developed in future works are described. III. RESULTS. Based on tests on the three networks presented, two IEEE test networks of 24 and 118 busbars (IEEE-24 and IEEE-118) and the electrical system of the Republic of Ecuador (EC-357), the following points present the most important observations: A. Estimation of voltage sags in the absence of measures: A stochastic estimation method of voltage sags, called PEHT, is implemented to represent with greater realism the long-term simulation of voltage sags events in a system. This first proposal of this thesis is considered a key step for the development of future methods of this work, as it emulates in a reliable manner the voltage sag long-term records in a generic network. Among the main innovations of this voltage sag estimation method are the following: - Consideration of the combined effect of five random input variables to simulate the events of voltage sags in long-term monitoring is included. The input variables modeled in the characterization of voltage sags on the PEHT are as follows: (i) fault coefficient, (ii) fault impedance, (iii) type of fault, (iv) location of the fault, and (v) fault duration. - Also included is the stochastic modeling of the input variables of fault impedance and duration in the characterization of the events of voltage sags. For the parameterization of these variables, a detailed study of the real behavior in power systems is developed. Also, the statistical function best suited to the random nature of each variable is defined. - Consideration of sag severity indicators used in standards as PEHT output variables, including such as indices as SARFI-X, SARFI-Curve, etc. B. Sensitivity analysis of voltage sags: A cause-effect study (sensitivity analysis) of the input variables of greatest divergence between reference parameterization related to the estimation of voltage sags in electrical networks is presented. Specifically, it delves into the study of the influence of the parameterization of the variables fault coefficient and fault impedance in the voltage sag estimation. Below is a summary of the most notable observations: - The accuracy of the input variable fault coefficient is shown as a non-influential parameter in the long-term estimation of the number of voltage sags (SARFI-90 and SARFI-70). That is, it does not require a high accuracy of the fault rate data of system elements for a proper voltage sag estimation. - The parameterization of the variable fault impedance is shown to be a very sensitive factor in the estimation of the voltage sag severity. For example, by increasing the average value of this random variable, the reported sag severity in the network significantly decreases. Moreover, in assessing the standard deviation of the fault impedance parameter, a direct relationship of this parameter with the voltage sag severity of the network is observed. That is, by increasing the fault impedance standard deviation, an increase of the average and the interannual variation of the SARFI-90 and SARFI-70 events is evidenced. - Based on the sensitivity analysis developed in the variable fault impedance, the omission of this variable in the voltage sag estimation would significantly call into question the reliability of the responses obtained. C. Voltage sag estimation from the information of a network partially monitored: A method that uses the voltage sag records of a partially monitored network for the sag estimation of all the power system is developed. From the case studies performed, it is observed that the method implemented (PEHT+MP) has the following characteristics: - The methodology proposed in the PEHT+MP combines the classical short-circuit theory with several statistical techniques to estimate, from data the of the installed sag meters, the sag measurements of unmonitored busbars of a generic power network. - The estimation process of voltage sags of the unmonitored zone of the network is based on the application of the conditional probability theorem of Bayes. That is, based on the observed data (monitored busbars records), the PEHT+MP calculates probabilistically the sag severity at unmonitored system busbars. Among the key parts of the proposed procedure are the following: (i) the creation of a realistic data base of voltage sags through of the sag estimation program (PEHT); and, (ii) the maximum likelihood criterion used to estimate the sag indices of system busbars without monitoring. - The voltage sag measurement estimations of PEHT+MP are potentiated by the correlation property of the sag events in power systems. This inherent characteristic of networks significantly limits the response of strongly correlated system zones to a possible voltage sag. As the PEHT+MP is based on probabilistic principles, a reduction of the range of possible sag measurements is reflected in a better sag estimation of the unmonitored area of the power system. - From the data of a set of monitors representing a relatively small portion of the system, to obtain accurate estimations (null error) of the sag severity zones without monitoring is feasible in the three networks studied. - The PEHT+MP can be applied to several types of sag indices, such as: SARFI-X, SARFI-Curve, SEI, etc. D. Optimal location of voltage sag monitors in power systems: Two methods for strategically locating the sag monitoring system are implemented for a generic network. The first proposal is a methodological development of the optimal location of sag monitors based on the observability criterion (LOM + OBS); the second proposal is a method that determines the sag monitor location according to the correlation area criterion (LOM+COR). Each proposed method of optimal location of sag monitors has a specific goal. In the case of LOM+OBS, the purpose of the method is to determine the optimal set of sag monitors to record all faults that originate voltage sags in the network. On the other hand, the LOM+COR method attempts to define the optimal location of sag monitors to estimate the sag indices in all the assessed network with the PEHT+MP application. From the development of the case studies of these methods of optimal location of sag monitors in the three networks raised, the most relevant observations are described below: - As the generation of voltage sag pseudo-measurements of the optimal location methods (LOM+OBS and LOM+COR) are obtained by applying the algorithm PEHT, the formulation of the optimization criterion is performed based on a realistic sag pseudo-monitoring, which considers the random nature of voltage sags through the five stochastic variables modeled in PEHT. This feature of the database of sag pseudo-measurements of the LOM+OBS and LOM+COR methods provides a greater reliability of the optimal set of monitors calculated when compared to similar methods in the bibliography. - The optimal set of sag monitors is determined by the network operator need. That is, if the goal is to record all faults that originate from voltage sags in the system, the observability criterion is used to determine the optimal location of sag monitors (LOM+OBS). Moreover, if the objective is to define a monitoring system that allows establishing the sag severity of the system from taken from information based on a limited set of sag monitors, the correlation area criterion would be appropriate (LOM+COR). Specifically, in the case of the LOM+OBS method (based on the observability criterion), the following properties were observed in the case studies: - By increasing the size of the network, there was observed a reduction in the percentage of monitored system busbars required. For example, to monitor all the faults which cause sags in the IEEE-24 network, then 100% of the system busbars are required for monitoring. In the case of the IEEE-118 and EC-357 networks, the method LOM+OBS determines that with monitoring 89.5 % and 65.3 % of the system, respectively, the observability criterion of the method would be fulfilled. - The LOM+OBS method calculates the probability of using the optimal set of sag monitors in the long term, establishing a relevance criterion of each sag monitor considered as optimal in the network. With this, the level of accuracy or observability (100%, 95%, etc.) can be determined, with which the faults that caused sags in the studied network are detected. That is, when the accuracy level for detecting faults that cause sags in the system is increased, a larger number of sag monitors is expected when calculating the optimal set of monitors. - The LOM + OBS method is demonstrated to be a technique applicable to any type of electrical system (radial or mesh), ensuring the detection of faults that cause voltage sags in a system according to the observability level raised. In the case of the optimal localization of sag monitors based on the criterion of correlation area (LOM+COR), several tests showed the following conclusions: - The procedure of LOM+COR method combines the implemented algorithms of voltage sag estimation (PEHT and PEHT+MP) with linear optimization techniques to define the optimal location of the sag monitors in a network. That is, the PEHT is used to generate the voltage sag pseudo-records, and, from the proposed optimization criterion (correlation area), the LOM+COR formulates and analytically calculates the optimal set of sag monitors of the network in the long term. From the information recorded by the optimal set of sag monitors, an accurate prediction of the voltage sag severity at all the busbars of the system is guaranteed with the PEHT+MP. - The LOM + COR method is shown to be a versatile optimization procedure, which reduces the size of the sag monitoring system both at radial as meshed grids. Due to its characteristics, this optimal location method allows emulation of complete system sag monitoring through the records of a small optimal set of sag monitors. Therefore, this new optimization method would be applicable to network operators that looks to reduce the installation and operation costs of the voltage sag monitoring system.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

La lectura histórica del territorio en relación con el sistema agroalimentario aporta elementos claves para reconstruir el sistema territorial, aprovechando la oportunidad que ofrece un renovado interés por la alimentación local y sostenible. El análisis histórico transdisciplinar incorpora variables espaciales, económicas, energéticas, urbanísticas, agronómicas y nutricionales y se centra en el tramo medio del valle del Duero (Castilla y León, España). Se trata de un territorio tradicionalmente agrícola, donde un producto de la tierra -el vino- es motor de innovación y ha transformado paisajes y estructuras. Aún así, se enfrenta a un desarrollo desigual e ilustra las contradicciones del mundo rural en un contexto alimentario globalizado. El análisis de la región desde 1900 permite constatar la relación entre la organización del territorio, el sistema agroalimentario, y cada una de las etapas nutricionales: a) la superación de la desnutrición está asociada a una agricultura familiar y al territorio de proximidad, que persiste en la zona hasta 1950; b) el modelo de consumo de masas y sobrealimentación, se basa en una agricultura industrializada y un territorio polarizado ligado al desarrollismo, que se extiende hasta 1985; c) finalmente, el modelo de consumo segmentado se apoya en una agricultura terciarizada y un territorio de enclaves en un contexto de globalización, que dura hasta nuestros días. En la última fase aparecen nuevos modelos alternativos de reconstrucción territorial con sistemas emergentes que reconectan campo y ciudad, consumo y producción desde sistemas de alimentación sostenible. Conviven dos tendencias: una hacia la jerarquización y el productivismo tecnificado y otra hacia la multifuncionalidad y la recampesinización que se reapropia de las innovaciones técnicas. La adaptación a las condiciones locales y aprovechar los recursos endógenos son elementos clave de sostenibilidad ambiental y social. Incorporar la alimentación en la planificación urbana y territorial desde una perspectiva agroecológica reduciría la insostenibilidad del sistema alimentario. Las propuestas de ordenación han de tener en cuenta la tipología de municipios, sus interrelaciones, las características agrológicas y productivas, la relación del muncipcon los núcleos de referencia y con las poblaciones que concentran las necesidades de alimentación. Se debe considerar asimismo la disponiblidad de infraestructuras, de equipamientos y de capital humano y relacional para fijar cadena de valor local. La ordenación urbanística cuenta ya con mecanismos como la clasificación del suelo, la regulación de usos y el diseño de redes de equipamientos que inciden sobre la autonomía de los sistema de alimentación locales y permiten fomentar la biodiversidad y las variedades locales. Son mecanismos insuficientemente aprovechados. Una adecuada utilización de los instrumentos de ordenación existentes, junto con el desarrollo de otros nuevos mejorarían de forma significativa la resiliencia de los sistemas agroalimentarios locales. ABSTRACT The historical review of the relationship between territory and agrifood system provides key lessons to help rebuild the territorial fabric, seizing the opportunity offered by a renewed interest in local and sustainable food. The historical transdisciplinary analysis spans spatial, economic, energy, agronomic and nutritional variables, focuses on the middle reaches of the Douro valley (Castilla y Leon, Spain). This a traditionally agricultural region, which has managed to turn a land product – the wine– into an engine of innovation which has transformed landscapes and structures. Even so, it faces the challenges of uneven development and illustrates the contradictions of the rural world in a globalized context. After the analysis of the evolution of the region since 1900, it can be concluded that the territory has been organized over time according to three models of food system that are in turn linked to different nutritional stages: a) the nutritional stage of overcoming malnutrition is related to family agriculture and a territory of proximity, which persists in the studied area until 1950; b) the model of mass consumption and overeating, was built on an industrialized agriculture and a polarized territory with unhindered development, which runs until 1985; c) and, finally, the model of consumer segmentation associated with terciarized agriculture and enclave territories in the context of globalization, which lasts until present time. During this last stage new alternative models of small-scale territorial reconstruction appear, linked to emerging systems that, based on sustainable food systems, reconnect city and countryside, consumption and production. Actually two trends coexist: one towards hierarchisation and tech-based productivism, and another one towards multifunctionality and peasantization that reappropriates technical innovations. The adaptation to local conditions taking advantage of local resources is a key element of environmental and social sustainability. Integrating food into urban and regional planning from an agroecological perspective would help reduce the current unsustainability of the food system. Planning proposals for municipalities need to consider their typology, agrological characteristics, productive capacity, links to other municipalities, proximity to reference nodes and population concentrations with food demands that need to be met. Availability of infrastructure, facilities, as well as human and relational capital to establish and reinforce local value chains is another aspect to consider in planning proposals. Spatial and urban planning are already equipped with mechanisms, such as land classification and the design of facilities’ networks, that affect the autonomy and stability of local food systems and can support biodiversity and adoption of local varieties. We are, however, missing opportunities. An adequate use of existing planning tools and the development of new ones could significantly improve the resilience of local agrifood systems.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Foi desenvolvida uma proposta de sistemática para implementação de Sistema de Gestão da Segurança de Alimentos com base na Norma ISO 22000:2005 (NBR ISO 22000:2006). Esta sistemática está composta por: A) Mapeamento da documentação; B) Formulários para o Planejamento do sistema APPCC/ HACCP com base na norma ISO 22000, bem como Instrução para seu uso, incluindo tanto as etapas preliminares como os 7 Princípios estabelecidos pelo Codex Alimentarius; C) Documentos para a verificação dos sistemas: Checklist para auditoria de verificação, tanto de adequação como de implementação, e Mapeamento da comunicação. Esta sistemática foi aplicada em uma linha de produtos em pó de empresa real, de porte médio, denominada, ficticiamente, empresa EXEMPLO. Foram dados os treinamentos necessários, adequados ao nível de conhecimento da equipe de segurança de alimentos, e realizadas reuniões de consultoria. Após implementação da sistemática proposta pela equipe da empresa EXEMPLO na linha de produtos escolhida para este fim, foi realizada uma auditoria de verificação para a avaliação da adequação do Sistema de Gestão da Segurança de Alimentos com base na Norma ISO 22000. A equipe foi composta por três auditores, sendo dois deles com formação nível auditor líder de ISO 22000. Concluiu-se que a sistemática é eficaz e adequada, atendendo plenamente às exigências da Norma ISO 22000. Foi, também, incluído no trabalho exemplo prático da documentação básica resultante da implementação na empresa EXEMPLO. A sistemática e modelos desenvolvidos, bem como a visualização de um exemplo prático, podem auxiliar as empresas a diminuir significativamente o tempo de implementação, embora ajustes devam ser feitos para adequação à sua realidade. Os ajustes necessários devem considerar os requisitos regulamentares, dependendo do tipo de produto e do órgão regulatório responsável pela sua regulamentação e fiscalização, bem como requisitos estatutários que possam impactar na sistemática desenvolvida.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este trabalho apresenta uma análise de algoritmos computacionais aplicados à estimação de fasores elétricos em SEPs. A medição dos fasores é realizada por meio da alocação de Unidades de Medição Fasorial nestes sistemas e encontra diversas aplicações nas áreas de operação, controle, proteção e planejamento. Para que os fasores possam ser aplicados, são definidos padrões de medição, sincronização e comunicação, por meio da norma IEEE C37.118.1. A norma apresenta os padrões de mensagens, timetag, fasores, sistema de sincronização, e define testes para avaliar a estimação. Apesar de abranger todos esses critérios, a diretriz não define um algoritmo de estimação padrão, abrindo espaço para uso de diversos métodos, desde que a precisão seja atendida. Nesse contexto, o presente trabalho analisa alguns algoritmos de estimação de fasores definidos na literatura, avaliando o comportamento deles em determinados casos. Foram considerados, dessa forma, os métodos: Transformada Discreta de Fourier, Método dos Mínimos Quadrados e Transformada Wavelet Discreta, nas versões recursivas e não-recursivas. Esses métodos foram submetidos a sinais sintéticos, a fim de verificar o comportamento diante dos testes propostos pela norma, avaliando o Total Vector Error, tempo de resposta e atraso e overshoot. Os algoritmos também foram embarcados em um hardware, denominado PC104, e avaliados de acordo com os sinais medidos pelo equipamento na saída analógica de um simulador em tempo real (Real Time Digital Simulator).

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Os sistemas de proteção dos elementos da rede elétrica desempenham um papel de fundamental importância na segurança e confiabilidade dos sistemas de potência. A não atuação ou a atuação incorreta dos relés de proteção durante uma falta localizada em um componente da rede pode transformar-se em um evento sistêmico de grandes proporções (blecaute). Esses eventos trazem riscos e elevados prejuízos econômicos à sociedade. A proteção dos geradores síncronos, apesar do alto custo e complexidade deste tipo de equipamento, não recebe a mesma atenção na literatura que a dedicada à proteção de outros elementos da rede, como, por exemplo, a das linhas de transmissão. Isso decorre do menor número de geradores existentes na rede e também da ideia que as faltas neste tipo de equipamento são menos frequentes. Este trabalho aborda os principais aspectos envolvidos com o projeto de um sistema de proteção para geradores síncronos de grande porte. Incialmente, discutese os principais conceitos associados com os geradores, de interesse para a tarefa de proteção. Particular atenção é dedicada às formas de aterramento e aos critérios adotados para projeto do resistor de aterramento utilizado nesse equipamento. Em seguida, apresentam-se as principais funções de proteção aplicáveis aos geradores, particularmente aquelas voltadas para a detecção de faltas nos enrolamentos do estator. Discute-se também os critérios de ajustes dos parâmetros dessas funções. Descreve-se o uso de uma plataforma laboratorial, baseada em simulador de tempo real (RTDS), para ensaio e análise do sistema de proteção visando validar seu correto desempenho frente às possíveis condições operativas que podem ser encontradas em campo. Finalmente, utilizando os conceitos desenvolvidos ao longo do trabalho, desenvolve-se um estudo de caso, onde é realizado o projeto e implementação do sistema de proteção dos geradores de uma usina hidrelétrica hipotética. Para avaliar e analisar o desempenho do sistema de proteção dessa rede exemplo, parametrizou-se o IED G60 (GE) e realizou-se inúmeras simulações na plataforma de testes proposta.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

O transformador de potência é um importante equipamento utilizado no sistema elétrico de potência, responsável por transmitir energia elétrica ou potência elétrica de um circuito a outro e transformar tensões e correntes de um circuito elétrico. O transformador de potência tem ampla aplicação, podendo ser utilizado em subestações de usinas de geração, transmissão e distribuição. Neste sentido, mudanças recentes ocorridas no sistema elétrico brasileiro, causadas principalmente pelo aumento considerável de carga e pelo desenvolvimento tecnológico tem proporcionado a fabricação de um transformador com a aplicação de alta tecnologia, aumentando a confiabilidade deste equipamento e, em paralelo, a redução do seu custo global. Tradicionalmente, os transformadores são fabricados com um sistema de isolação que associa isolantes sólidos e celulose, ambos, imersos em óleo mineral isolante, constituição esta que define um limite à temperatura operacional contínua. No entanto, ao se substituir este sistema de isolação formado por papel celulose e óleo mineral isolante por um sistema de isolação semi- híbrida - aplicação de papel NOMEX e óleo vegetal isolante, a capacidade de carga do transformador pode ser aumentada por suportar maiores temperaturas. Desta forma, o envelhecimento do sistema de isolação poderá ser em longo prazo, significativamente reduzido. Esta técnica de aumentar os limites térmicos do transformador pode eliminar, essencialmente, as restrições térmicas associadas à isolação celulósica, provendo uma solução econômica para aperfeiçoar o uso de transformadores de potência, aumentando a sua confiabilidade operacional. Adicionalmente, à aplicação de sensores de fibra óptica, em substituição aos sensores de imagem térmica no monitoramento das temperaturas internas do transformador, se apresentam como importante opção na definição do equacionamento do comportamento do transformador sob o ponto de vista térmico.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Introdução: O tema medicalização emerge como objeto de estudo no campo da sociologia da saúde, a partir da década de 70, nas vozes de Irving Zola, Ivan Illich, Peter Conrad e Michel Foucalt; as quais indicaram a crescente influência da medicina em campos que até então não lhe pertenciam. E, no decorrer dos anos, o termo vem sendo apropriado por vários campos: na saúde, na educação, na psicologia, entre outros. Esta configuração levou alguns estudiosos da primeira década do século XXI, a se preocupar com o uso impreciso e vago do conceito de medicalização na produção científica. Neste sentido, este estudo busca olhar para os processos de medicalização, tomando-o em sua pluralidade a fim de discernir as principais forças motrizes e coteja-las com as mudanças na contemporaneidade. Objetivo: Recuperar as forças motrizes contidas nas principais contribuições dos autores primários sobre os processos de medicalização. Método: Realizou-se um exercício hermenêutico composto pelos seguintes passos: leitura profunda do texto, fichamento dos aspectos centrais que caracterizam as diversas concepções sobre medicalização. Interpretação do conteúdo por meio da abstração dos núcleos de sentido e dos referenciais teóricos que lhe dão suporte. Resultados: A partir deste movimento reflexivo e crítico conseguiu-se desvelar quatro conceitos nucleares que representam as principais forças motrizes: a indústria, as instituições, o Estado e a sociedade. Zola oferece indícios que o Estado e a indústria teriam levado a sociedade à dependência da medicina. Para Illich, a medicina, por si só, detém o poder comparada as outras instituições. Para Michel Foucault, a medicina deixou de ser uma ciência pura e transformou-se numa instituição subordinada a um sistema econômico e de poder, enfim a uma lógica subjacente aos princípios e regras de governo. Em contrapartida, para Conrad a medicalização não constitui um empreendimento exclusivo da medicina, prevalecendo os interesses de outras instituições e organizações sociais. O sentido com que cada um desses conceitos é usado difere entre os autores e a distinção desses aspectos é chave para compreender a contribuição efetiva de cada um. Da mesma forma, ocorre quando os autores discutem as consequências e os efeitos causados pelos processos de medicalização. Alguns autores direcionam seus efeitos para os indivíduos, num processo de exacerbação da individualização; enquanto que outros focam os efeitos da medicalização nas políticas de saúde e na questão econômica associada ao oneroso custo financeiro para a sociedade e o país. Considerações finais: A recuperação e a compreensão dos significados subjacentes às principais forças motrizes presentes nas contribuições de cada autor apresentadas nesta investigação constituem-se em passo importante para subsidiar a reflexão sobre processos concretos de medicalização no início do século XXI, um período marcado por aceleradas transformações, no qual, entre outros aspectos, a medicina e várias instituições têm sido crescentemente, capturadas para satisfazer, de um lado o consumismo, e de outro, a avidez pelo lucro do mercado capitalista; ao mesmo tempo em que forças desagregadoras atravessam os sujeitos impactando sua autonomia e identidade política, social e econômica.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Este trabalho estuda a interação entre os métodos anti-ilhamento aplicados em sistemas fotovoltaicos residenciais, operando simultaneamente em uma rede de distribuição de baixa tensão. Os sistemas fotovoltaicos em geral interagem entre si, com a rede de distribuição da concessionária e com outras fontes de geração distribuída. Uma consequência importante dessa interação é a ocorrência do ilhamento, que acontece quando as fontes de geração distribuída fornecem energia ao sistema elétrico de potência mesmo quando esta se encontra eletricamente isolada do sistema elétrico principal. A função anti-ilhamento é uma proteção extremamente importante, devendo estar presente em todos os sistemas de geração distribuída. Atualmente, são encontradas diversas técnicas na literatura. Muitas delas oferecem proteção adequada quando um inversor está conectado à linha de distribuição, mas podem falhar quando dois ou mais funcionam simultaneamente, conectados juntos ou próximos entre si. Dois destes métodos são analisados detalhadamente nesse estudo, avaliados em uma rede de distribuição residencial de baixa tensão. Os resultados obtidos mostram que a influência de um método sobre o outro é dependente da predominância de cada um deles dentro do sistema elétrico. Contudo, nas condições analisadas o ilhamento foi detectado dentro do limite máximo estabelecido pelas normas pertinentes.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

A busca no aumento da vida útil dos transformadores de distribuição, redução dos custos de manutenção e mitigação de falhas, leva ao desenvolvimento de novos materiais e critérios de exploração diferenciados desses ativos. Esta pesquisa apresenta o desenvolvimento de um novo transformador de distribuição compacto e mais eficiente utilizando óleo vegetal isolante totalmente biodegradável. Além de biodegradável, o óleo vegetal utilizado possui menor agressividade ambiental e maior capacidade térmica aumentando, a capacidade de carregamento do transformador sem comprometer a sua vida útil. A fim de atestar essa menor agressividade em relação ao óleo mineral, ensaios foram efetuados em um equipamento que permaneceu 12 anos em operação. O equipamento foi totalmente desmontado para análise e coleta de amostras de papel e óleo vegetal isolante. As análises visam comprovar a menor agressividade em relação ao óleo mineral, apresentadas na revisão bibliográfica. A menor agressividade torna possível a proposição de uma nova filosofia de planejamento de redes de distribuição utilizando uma quantidade menor dos novos transformadores para uma mesma carga, tornando-a mais compacta e eficiente.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Desde seu lançamento, em 2002, a Norma IEC 61850 vem evoluindo para se tornar o padrão adotado nos Sistemas de Automação de Subestações. Dentre seus vários aspectos, destacam- se os serviços de tempo real, que permitem a implementação de funções de automação e de proteção dentro da subestação através da troca de mensagens específicas entre Dispositivos Eletrônicos Inteligentes através de um barramento digital de rede de dados. O objetivo central deste trabalho é explorar algumas das questões que envolvem a implementação de uma classe de serviços de tempo real: a transmissão de valores amostrados através de Serviços SMV, definidos pela Norma IEC 61850-9. Primeiramente, apresenta-se um breve resumo das principais características da Norma IEC 61850 que possibilitam o atendimento dos três requisitos por ela estabelecidos como base: a interoperabilidade entre dispositivos de diferentes fabricantes, a versatilidade na configuração e reconfiguração do Sistema de Automação da Subestação, e a possibilidade de implementação de novas tecnologias. Em seguida, explora-se com maior profundidade todos os aspectos relevantes à implementação dos Serviços SMV. Devido à complexidade deste assunto, o autor propõe abordá-lo sob a ótica de cinco tópicos interdependentes: variações da Norma IEC 61850-9, confiabilidade do barramento de processo, sincronismo de tempo, análise da qualidade da medição e segurança cibernética. Com base nos resultados apresentados neste estudo, propõem-se duas plataformas, um protótipo de Transformador de Potencial Óptico e um protótipo de Relé de Proteção Diferencial para transformadores de potência, com o objetivo de explorar alguns dos aspectos pertinentes à implementação de um barramento de processo de acordo com a Norma IEC 61850-9. Também foram realizados testes de geração e transmissão de mensagens contendo valores de amostras de tensão/corrente do sistema elétrico (denominadas de SV Messages) com a finalidade de implementá-las de fato e avaliar as ferramentas de mercado disponíveis. Por fim foi proposto um modelo para a simulação do sistema de potência em conjunto com a rede de comunicação utilizando o programa Matlab/Simulink. O autor espera que este trabalho contribua para esclarecer os vários conceitos envolvidos na implementação do barramento de processo definido pela Norma IEC 61850-9, auxiliando na pesquisa e no desenvolvimento de novas ferramentas e dispositivos, e no aprimoramento da Norma IEC 61850.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

É importante que as redes elétricas tenham altos índices de confiabilidade, de forma a se manter a agilidade e a manutenção ideais para um melhor funcionamento. Por outro lado, o crescimento inesperado da carga, falhas em equipamentos e uma parametrização inadequada das funções de proteção tornam a análise de eventos de proteção mais complexas e demoradas. Além disso, a quantidade de informações que pode ser obtida de relés digitais modernos tem crescido constantemente. Para que seja possível uma rápida tomada de decisão e manutenção, esse projeto de pesquisa teve como objetivo a implementação de um sistema completo de diagnóstico que é ativado automaticamente quando um evento de proteção ocorrer. As informações a serem analisadas são obtidas de uma base de dados e de relés de proteção, via protocolo de comunicação IEC 61850 e arquivos de oscilografia. O trabalho aborda o sistema Smart Grid completo incluindo: a aquisição de dados nos relés, detalhando o sistema de comunicação desenvolvido através de um software com um cliente IEC61850 e um servidor OPC e um software com um cliente OPC, que é ativado por eventos configurados para dispará-lo (por exemplo, atuação da proteção); o sistema de pré-tratamento de dados, onde os dados provenientes dos relés e equipamentos de proteção são filtrados, pré-processados e formatados; e o sistema de diagnóstico. Um banco de dados central mantém atualizados os dados de todas essas etapas. O sistema de diagnóstico utiliza algoritmos convencionais e técnicas de inteligência artificial, em particular, um sistema especialista. O sistema especialista foi desenvolvido para lidar com diferentes conjuntos de dados de entrada e com uma possível falta de dados, sempre garantindo a entrega de diagnósticos. Foram realizados testes e simulações para curtos-circuitos (trifásico, dupla-fase, dupla-fase-terra e fase-terra) em alimentadores, transformadores e barras de uma subestação. Esses testes incluíram diferentes estados do sistema de proteção (funcionamento correto e impróprio). O sistema se mostrou totalmente eficaz tanto no caso de disponibilidade completa quanto parcial de informações, sempre fornecendo um diagnóstico do curto-circuito e analisando o funcionamento das funções de proteção da subestação. Dessa forma, possibilita-se uma manutenção muito mais eficiente pelas concessionárias de energia, principalmente no que diz respeito à prevenção de defeitos em equipamentos, rápida resposta a problemas, e necessidade de reparametrização das funções de proteção. O sistema foi instalado com sucesso em uma subestação de distribuição da Companhia Paulista de Força e Luz.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Short-term load forecasting of power system has been a classic problem for a long time. Not merely it has been researched extensively and intensively, but also a variety of forecasting methods has been raised. This thesis outlines some aspects and functions of smart meter. It also presents different policies and current statuses as well as future projects and objectives of SG development in several countries. Then the thesis compares main aspects about latest products of smart meter from different companies. Lastly, three types of prediction models are established in MATLAB to emulate the functions of smart grid in the short-term load forecasting, and then their results are compared and analyzed in terms of accuracy. For this thesis, more variables such as dew point temperature are used in the Neural Network model to achieve more accuracy for better short-term load forecasting results.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

Hosni Mubarak’s regime and its power system enjoyed remarkable stability for over 30 years. On 11 February 2011, after 18 days of mass protests, the Egyptian president was forced to step down, revealing the unsustainability of the political and economic system that had ensured his continuity for so long. While the revolution of January 25th led to a major success – the fall of Hosni Mubarak – Egypt’s political future is still opaque and exposed to a number of risks. This paper first highlights the factors underpinning the former stability of Mubarak’s regime; it then assesses the causes of its underlying unsustainability, leading to the anti-government popular mobilisation in January-February 2011 and the removal of Mubarak; finally the paper evaluates the prospects for a genuine democratic transition in Egypt, by looking at the main political and socio-economic challenges facing the country.

Relevância:

80.00% 80.00%

Publicador:

Resumo:

European Union energy policy calls for nothing less than a profound transformation of the EU's energy system: by 2050 decarbonised electricity generation with 80-95% fewer greenhouse gas emissions, increased use of renewables, more energy efficiency, a functioning energy market and increased security of supply are to be achieved. Different EU policies (e.g., EU climate and energy package for 2020) are intended to create the political and regulatory framework for this transformation. The sectorial dynamics resulting from these EU policies already affect the systems of electricity generation, transportation and storage in Europe, and the more effective the implementation of new measures the more the structure of Europe's power system will change in the years to come. Recent initiatives such as the 2030 climate/energy package and the Energy Union are supposed to keep this dynamic up. Setting new EU targets, however, is not necessarily the same as meeting them. The impact of EU energy policy is likely to have considerable geo-economic implications for individual member states: with increasing market integration come new competitors; coal and gas power plants face new renewable challengers domestically and abroad; and diversification towards new suppliers will result in new trade routes, entry points and infrastructure. Where these implications are at odds with powerful national interests, any member state may point to Article 194, 2 of the Lisbon Treaty and argue that the EU's energy policy agenda interferes with its given right to determine the conditions for exploiting its energy resources, the choice between different energy sources and the general structure of its energy supply. The implementation of new policy initiatives therefore involves intense negotiations to conciliate contradicting interests, something that traditionally has been far from easy to achieve. In areas where this process runs into difficulties, the transfer of sovereignty to the European level is usually to be found amongst the suggested solutions. Pooling sovereignty on a new level, however, does not automatically result in a consensus, i.e., conciliate contradicting interests. Rather than focussing on the right level of decision making, European policy makers need to face the (inconvenient truth of) geo-economical frictions within the Union that make it difficult to come to an arrangement. The reminder of this text explains these latter, more structural and sector-related challenges for European energy policy in more detail, and develops some concrete steps towards a political and regulatory framework necessary to overcome them.