896 resultados para Power distribution system


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this study was to evaluate the shape of dental cavities made with the CVDentus® system using different ultrasound power levels. One standard cavity was made on the buccal aspect of 15 bovine incisors with a CVDentus® cylindrical bur (82142). The sample was divided into three groups: G1 - ultrasound with power II; G2 - ultrasound with power III; and G3 - ultrasound with power IV. A standardizing device was used to obtain standardized preparations and ultrasound was applied during one minute in each dental preparation. The cavities were sectioned in the middle, allowing observation of the cavity's profile with a magnifying glass, and width and depth measurement using the Leica Qwin program. The Kruskal-Wallis (p < 0.05) and Dunn statistical analyses demonstrated differences between the dental cavity shapes when powers III and IV were used. However, the cavities that were made with power III presented dimensions similar to those of the bur used for preparation. We concluded that the power recommended by the manufacturer (III) is the most adequate for use with the CVDentus® system.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper describes a method for the decentralized solution of the optimal reactive power flow (ORPF) problem in interconnected power systems. The ORPF model is solved in a decentralized framework, consisting of regions, where the transmission system operator in each area operates its system independently of the other areas, obtaining an optimal coordinated but decentralized solution. The proposed scheme is based on an augmented Lagrangian approach using the auxiliary problem principle (APP). An implementation of an interior point method is described to solve the decoupled problem in each area. The described method is successfully implemented and tested using the IEEE two area RTS 96 test system. Numerical results comparing the solutions obtained by the traditional and the proposed decentralized methods are presented for validation. ©2008 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The aim of this study was to evaluate the microbial distribution in the root canal system after periapical lesion induction in dogs' teeth using different methods. Fifty-two root canals were assigned to 4 groups (n=13). Groups I and II: root canals were exposed to the oral cavity for 180 days; groups III and IV: root canals were exposed for 7 days and then the coronal openings were sealed for 53 days. The root apices of groups I and III were perforated, while those of groups II and IV remained intact. After the experimental periods, the animals were euthanized and the anatomic pieces containing the roots were processed and stained with the Brown & Brenn method to assess the presence and distribution of microorganisms. The incidence of microorganisms at different sites of the roots and periapical lesions was analyzed statistically by the chi-square test at 5% significance level. All groups presented microorganisms in the entire root canal system. A larger number of microorganisms was observed on the root canal walls, apical delta and dentinal tubules (p<0.05), followed by cementum and cemental resorption areas. In spite of the different periods of exposure to the oral environment, the methods used for induction of periapical periodontitis yielded similar distribution of microorganisms in the root canal system.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper, a methodology based on Unconstrained Binary Programming (UBP) model and Genetic Algorithms (GAs) is proposed for estimating fault sections in automated distribution substations. The UBP model, established by using the parsimonious set covering theory, looks for the match between the relays' protective alarms informed by the SCADA system and their expected states. The GA is developed to minimize the UBP model and estimate the fault sections in a swift and reliable manner. The proposed methodology is tested by utilizing a real-life automated distribution substation. Control parameters of the GA are tuned to achieve maximum computational efficiency and reduction of processing time. Results show the potential and efficiency of the methodology for estimating fault section in real-time at Distribution Control Centers. ©2009 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper deals with the subject-matter of teaching immaterial issues like power system dynamics where the phenomena and events are not sense-perceptible. The dynamics of the power system are recognized as analogous to the dynamics of a simple mechanical pendulum taken into account the well-known classical model for the synchronous machine. It is shown that even for more sophisticated models including flux decay and Automatic Voltage Regulator the mechanical device can be taken as an analogous, since provided some considerations about variation and control of the pendulum length using certain control laws. The resulting mathematical model represents a mechanical system that can be built for use in laboratory teaching of power system dynamics. © 2010 Praise Worthy Prize S.r.l. - All rights reserved.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper adjusts decentralized OPF optimization to the AC power flow problem in power systems with interconnected areas operated by diferent transmission system operators (TSO). The proposed methodology allows finding the operation point of a particular area without explicit knowledge of network data of the other interconnected areas, being only necessary to exchange border information related to the tie-lines between areas. The methodology is based on the decomposition of the first-order optimality conditions of the AC power flow, which is formulated as a nonlinear programming problem. To allow better visualization of the concept of independent operation of each TSO, an artificial neural network have been used for computing border information of the interconnected TSOs. A multi-area Power Flow tool can be seen as a basic building block able to address a large number of problems under a multi-TSO competitive market philosophy. The IEEE RTS-96 power system is used in order to show the operation and effectiveness of the decentralized AC Power Flow. ©2010 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

We consider the two-level network design problem with intermediate facilities. This problem consists of designing a minimum cost network respecting some requirements, usually described in terms of the network topology or in terms of a desired flow of commodities between source and destination vertices. Each selected link must receive one of two types of edge facilities and the connection of different edge facilities requires a costly and capacitated vertex facility. We propose a hybrid decomposition approach which heuristically obtains tentative solutions for the vertex facilities number and location and use these solutions to limit the computational burden of a branch-and-cut algorithm. We test our method on instances of the power system secondary distribution network design problem. The results show that the method is efficient both in terms of solution quality and computational times. © 2010 Elsevier Ltd.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In this paper a framework based on the decomposition of the first-order optimality conditions is described and applied to solve the Probabilistic Power Flow (PPF) problem in a coordinated but decentralized way in the context of multi-area power systems. The purpose of the decomposition framework is to solve the problem through a process of solving smaller subproblems, associated with each area of the power system, iteratively. This strategy allows the probabilistic analysis of the variables of interest, in a particular area, without explicit knowledge of network data of the other interconnected areas, being only necessary to exchange border information related to the tie-lines between areas. An efficient method for probabilistic analysis, considering uncertainty in n system loads, is applied. The proposal is to use a particular case of the point estimate method, known as Two-Point Estimate Method (TPM), rather than the traditional approach based on Monte Carlo simulation. The main feature of the TPM is that it only requires resolve 2n power flows for to obtain the behavior of any random variable. An iterative coordination algorithm between areas is also presented. This algorithm solves the Multi-Area PPF problem in a decentralized way, ensures the independent operation of each area and integrates the decomposition framework and the TPM appropriately. The IEEE RTS-96 system is used in order to show the operation and effectiveness of the proposed approach and the Monte Carlo simulations are used to validation of the results. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Distributed Generators (DG) are generally modeled as PQ or PV buses in power flow studies. But in order to integrate DG units into the distribution systems and control the reactive power injection it is necessary to know the operation mode and the type of connection to the system. This paper presents a single-phase and a three-phase mathematical model to integrate DG in power flow calculations in distribution systems, especially suited for Smart Grid calculations. If the DG is in PV mode, each step of the power flow algorithm calculates the reactive power injection from the DG to the system to keep the voltage in the bus in a predefined level, if the DG is in PQ mode, the power injection is considered as a negative load. The method is tested on two well known test system, presenting single-phase results on 85 bus system, and three-phase results in the IEEE 34 bus test system. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This article aims to present proposals for improvement of key standards and resolutions concerned about the methodology for calculating the indicator of total harmonic voltage distortion, and should contribute to the process of examining the compatibility of potentially disturbing loads in electric power quality in distribution systems. These proposals were drawn from the analysis of results from measurement campaigns conducted in a case study including analysis of the connection of a new induction furnace in a foundry served by a distributor of São Paulo state. A general historical situating the quality of electric energy in the electricity sector is presented, and methodological guidelines and procedures used in experimental trials are shown. The analysis and discussion of results are prepared to answer the main questions that arise during the implementation of standards, resolutions and procedures. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

A metaheuristic technique for solving the short-term transmission network expansion and reactive power planning problems, at the same time, in regulated power systems using the AC model is presented. The problem is solved using a real genetic algorithm (RGA). For each topology proposed by RGA an indicator is employed to identify the weak buses for new reactive power sources allocation. The fitness function is calculated using the cost of each configuration as well as constraints deviation of an AC optimal power flow (OPF) in which the minimum reactive generation of new reactive sources and the active power losses are objectives. With allocation of reactive power sources at load buses, the circuit capacity increases and the cost of installation could be decreased. The method is tested in a well known test system, presenting good results when compared with other approaches. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Problems as voltage increase at the end of a feeder, demand supply unbalance in a fault condition, power quality decline, increase of power losses, and reduction of reliability levels may occur if Distributed Generators (DGs) are not properly allocated. For this reason, researchers have been employed several solution techniques to solve the problem of optimal allocation of DGs. This work is focused on the ancillary service of reactive power support provided by DGs. The main objective is to price this service by determining the costs in which a DG incurs when it loses sales opportunity of active power, i.e, by determining the Loss of Opportunity Costs (LOC). The LOC will be determined for different allocation alternatives of DGs as a result of a multi-objective optimization process, aiming the minimization of losses in the lines of the system and costs of active power generation from DGs, and the maximization of the static voltage stability margin of the system. The effectiveness of the proposed methodology in improving the goals outlined was demonstrated using the IEEE 34 bus distribution test feeder with two DGs cosidered to be allocated. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Multinodal load forecasting deals with the loads of several interest nodes in an electrical network system, which is also known as bus load forecasting. To perform this demand, it is necessary a technique that is precise, trustable and has a short-time processing. This paper proposes two methodologies based on general regression neural networks for short-term multinodal load forecasting. The first individually forecast the local loads and the second forecast the global load and individually forecast the load participation factors to estimate the local loads. To design the forecasters it wasn't necessary the previous study of the local loads. Tests were made using a New Zealand distribution subsystem and the results obtained are compatible with the ones founded in the specialized literature. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents a historical perspective of the Power Electronics education that has lead to the present situation in which such technology is indispensable for the exploitation of almost all type of clean energy primary sources. Some academic initiatives in Brazil are here discussed focusing the institutions grouped in a CAPES-Pró-Engenharia program. The curricula aspects and innovations are presented, emphasizing the multidisciplinary character of this field of Power Electronics application. © 2011 IEEE.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

This paper presents a power system capacity expansion planning modelconsidering carbon emissions constraints. In addition to the traditionaltechnical and economical issues usually considered in the planning process, two environmental policies that consist on the taxation and the annual limitsof carbon dioxide (CO 2) emissions are considered. Furthermore, the gradualretirement of old inefficient generation plants has been included. The approachguarantees a cleaner electricity production in the expanded power system ata relatively low cost. The proposed model considers the transmission systemand is applied to a 4-region and 11-region power systems over a 20-yearplanning horizon. Results show practical investment decisions in terms of sustainability and costs.