967 resultados para Operations management


Relevância:

20.00% 20.00%

Publicador:

Resumo:

The results presented in this report form a part of a larger global study on the major issues in BPM. Only one part of the larger study is reported here, viz. interviews with BPM experts. Interviews of BPM tool vendors together with focus groups involving user organizations, are continuing in parallel and will set the groundwork for the identification of BPM issues on a global scale via a survey (including a Delphi study). Through this multi-method approach, we identify four distinct sets of outcomes. First, as is the focus of this report, we identify the BPM issues as perceived by BPM experts. Second, the research design allows us to gain insight into the opinions of organisations deploying BPM solutions. Third, an understanding of organizations’ misconceptions of BPM technologies, as confronted by BPM tool vendors is obtained. Last, we seek to gain an understanding of BPM issues on a global scale, together with knowledge of matters of concern. This final outcome is aimed to produce an industry driven research agenda which will inform practitioners and in particular, the research community world-wide on issues and challenges that are prevalent or emerging in BPM and related areas.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A large number of models have been derived from the two-parameter Weibull distribution and are referred to as Weibull models. They exhibit a wide range of shapes for the density and hazard functions, which makes them suitable for modelling complex failure data sets. The WPP and IWPP plot allows one to determine in a systematic manner if one or more of these models are suitable for modelling a given data set. This paper deals with this topic.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The subject of management is renowned for its addiction to fads and fashions. Project Management is no exception. The issue of interest for this paper is the establishment of the 'College of Complex Project Managers' and their 'competency standard for complex project managers.' Both have generated significant interest in the Project Management community, and like any other human endeavour they should be subject to critical evaluation. The results of this evaluation show significant flaws in the definition of complex in this case, the process by which the College and its standard have emerged, and the content of the standard. However, there is a significant case for a portfolio of research that extends the existing bodies of knowledge into large-scale complicated (or major) projects that would be owned by the relevant practitioner communities, rather than focused on one organization. Research questions are proposed that would commence this stream of activity towards an intelligent synthesis of what is required to manage in both complicated and truly complex environments.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

As reported in Volume 1 of Research on Emotions in Organizations (Ashkanasy, Zerbe, & Härtel, 2005), the chapters in this volume are drawn from the best contributions to the 2004 International Conference on Emotion and Organizational Life held at Birkbeck College, London, complemented by additional, invited chapters. (This biannual conference has come to be known as the “Emonet” conference, after the listserv of members.) Previous edited volumes (Ashkanasy, Härtel, & Zerbe, 2000; Ashkanasy, Zerbe, & Härtel, 2002; Härtel, Zerbe, & Ashkanasy, 2004) were published every two years following the Emonet conference. With the birth of this annual Elsevier series came the opportunity for greater focus in the theme of each volume, and for greater scope for invited contributions. This volume contains eight chapters selected from conference contributions for their quality, interest, and appropriateness to the theme of this volume, as well as four invited chapters. We again acknowledge in particular the assistance of the conference paper reviewers (see the appendix). In the year of publication of this volume the 2006 Emonet conference will be held in Atlanta, USA and will be followed by Volumes 3 and 4 of Research on Emotions in Organizations. Readers interested in learning more about the conferences or the Emonet list should check the Emonet website http://www.uq.edu.au/emonet/.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In a study of merger-evoked cultural change in three organizations, quantitative and qualitative data were collected from individuals at all employment levels in both merger partners within each organization. Results were that most individuals perceived that the merger had impacted significantly on them personally. There was, however, a perceived lack of congruence between the organizational cultures of merging partners, resulting in cultural clashes and significant changes to the organizations' organizational cultures. More specifically, outcomes for both individuals and the subsequent acculturation following the mergers were related to the approach adopted to manage the merger process: incremental, immediate, or indifferent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

We explore of the feasibility of the computationally oriented institutional agency framework proposed by Governatori and Rotolo testing it against an industrial strength scenario. In particular we show how to encode in defeasible logic the dispute resolution policy described in Article 67 of FIDIC.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The reconstruction of power industries has brought fundamental changes to both power system operation and planning. This paper presents a new planning method using multi-objective optimization (MOOP) technique, as well as human knowledge, to expand the transmission network in open access schemes. The method starts with a candidate pool of feasible expansion plans. Consequent selection of the best candidates is carried out through a MOOP approach, of which multiple objectives are tackled simultaneously, aiming at integrating the market operation and planning as one unified process in context of deregulated system. Human knowledge has been applied in both stages to ensure the selection with practical engineering and management concerns. The expansion plan from MOOP is assessed by reliability criteria before it is finalized. The proposed method has been tested with the IEEE 14-bus system and relevant analyses and discussions have been presented.

Relevância:

20.00% 20.00%

Publicador: