999 resultados para Mine production timetabling


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This study analyses the area of construction and demolition waste (C & D W) auditing. The production of C&DW has grown year after year since the Environmental Protection Agency (EPA) first published a report in 1996 which provided data for C&D W quantities for 1995 (EPA, 1996a). The most recent report produced by the EPA is based on data for 2005 (EPA, 2006). This report estimated that the quantity of C&DW produced for that period to be 14 931 486 tonnes. However, this is a ‘data update’ report containing an update on certain waste statistics so any total provided would not be a true reflection of the waste produced for that period. This illustrates that a more construction site-specific form of data is required. The Department of Building and Civil Engineering in the Galway-Mayo Institute of Technology have carried out two recent research projects (Grimes, 2005; Kelly, 2006) in this area, which have produced waste production indicators based on site-specific data. This involved the design and testing of an original auditing tool based on visual characterisation and the application of conversion factors. One of the main recommendations of these studies was to compare this visual characterisation approach with a photogrammetric sorting methodology. This study investigates the application of photogrammetric sorting on a residential construction site in the Galway region. A visual characterisation study is also carried out on the same project to compare the two methodologies and assess the practical application in a construction site environment. Data collected from the waste management contractor on site was also used to provide further evaluation. From this, a set of waste production indicators for new residential construction was produced: □ 50.8 kg/m2 for new residential construction using data provided by the visual characterisation method and the Landfill Levy conversion factors. □ 43 kg/m2 for new residential construction using data provided by the photogrammetric sorting method and the Landfill Levy conversion factors. □ 23.8 kg/m2 for new residential construction using data provided by Waste Management Contractor (WMC). The acquisition of the data from the waste management contractor was a key element for testing of the information produced by the visual characterisation and photogrammetric sorting methods. The actual weight provided by the waste management contractor shows a significant difference between the quantities provided.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research was conducted to investigate the potential for ecologically engineering a sustainable wetland ecosystem over pyritic mine tailings to prevent the generation of acid mine drainage. Ecological engineering is technology with the primary goal being the creation of self-sustainable ecological systems. Work involved the design and construction of a pilot-scale wetland system comprising three wetland cells, each covering 100 m2. Approximately forty tonnes of pyritic mine tailings were deposited on the base of the first cell above a synthetic liner, covered with peat, flooded and planted with emergent wetland macrophytes Typha latifolia, Phragmites australis, and Juncus effusus. The second cell was constructed as a conventional free water surface wetland, planted identically, and used as a reference wetland/experimental control. Wetland monitoring to determine long-term sustainability focused on indicators of ecosystem health including ecological, hydrological, physico-chemical, geochemical, and biotic metrics. An integrated assessment was conducted that involved field ecology in addition to ecological risk assessment. The objective of the field ecology study was to use vegetative parameters as ecological indicators for documenting wetlands success or degradation. The goal of the risk assessment was to determine if heavy-metal contamination of the wetland sediments occurred through metal mobilisation from the underlying tailings, and to evaluate if subsequent water column chemistry and biotic metal concentrations were significantly correlated with adverse wetland ecosystem impacts. Data were used to assess heavy metal bioavailability within the system as a function of metal speciation in the wetland sediments. Results indicate hydrology is the most important variable in the design and establishment of the tailings wetland and suggest a wetland cover is an ecologically viable alternative for pyritic tailings which are feasible to flood. Ecological data indicate that in terms of species richness and diversity, the tailings-wetland was exhibiting the ecological characteristics of natural wetlands within two years. Ata indicate that pH and conductivity in the tailings-wetland were not adversely impacted by the acid-generating potential or sulphate concentration of the tailings substrate and its porewater. Similarly, no enhanced seasonal impacts from sulphate or metals in the water column, nor adverse impacts on the final water quality of the outflows, were detected. Mean total metal concentrations in the sediments of the tailings-wetland indicate no significant adverse mobilisation of metals into the peat substrate from the tailings. Correlation analyses indicate a general increase in sediment metal concentration in this wetland with increasing water depth and pH, and a corresponding decrease in the metal concentrations of the water column. Sediment extractions also showed enrichment of Cd, Fe, Pb and Zn in the oxidisable fraction (including sulphides and organic matter) of the tailings-wetland sediments. These data suggest that adsorption and coprecipitation of metals is occurring from the water column of the tailings wetland with organic material at increasing depths under reducing conditions. The long-term control of metal bioavailability in the tailings wetland will likely be related to the presence and continual build-up of organic carbon binding sites in the developing wetland above the tailings. Metal speciation including free-metal ion concentration and the impact of physico-chemical parameters particularly pH and organic matter, were investigated to assess ecotoxicological risk. Results indicate that potentially bioavailable metals (the sum of the exchangeable and reducible fractions) within the tailings wetland are similar to values cited for natural wetlands. Estimated free-metal ion concentrations calculated from geochemical regression models indicate lower free-metal ion concentrations of Cd in the tailings wetland than natural wetlands and slightly higher free-metal ion concentrations of Pb and Zn. Increased concentrations of metals in roots, rhizomes and stems of emergent macrophytes did not occur in the tailings wetland. Even though a substantial number of Typha latifolia plants were found rooting directly into tailings, elevated metals were not found in these plant tissues. Phragmites also did not exhibit elevated metal concentrations in any plant tissues. Typha and Phragmites populations appear to be exhibiting metal-tolerant behaviour. The chemistry of the water column and sediments in Silvermines wetland were also investigated and were much more indicative of a wetland system impacted by heavy metal contamination than the tailings-wetland. Mean Dc, Fe, Mn, Pb and Zn concentrations in the water column and sediments of Silvermines wetlands were substantially higher than in the pilot wetlands and closely approximate concentrations in these matrices contaminated with metals from mining. In addition, mean sulphate concentration in Silvermines wetland was substantially higher and is closer to sulphate concentrations in waters associated with mining. Potentially bioavailable metals were substantially elevated in Silvermines wetland in comparison to the pilot wetlands and higher than those calculated for natural rive sediments. However, Fe oxy-hydroxide concentrations in Silvermines sediments are also much higher than in the pilot wetlands and this significantly impacts the concentration of free-metal ions in the sediment porewater. The free-metal ion concentrations for Pb and Zn indicate that Silvermines wetland is retaining metals and acting as a treatment wetland for drainage emanating from Silvermines tailings dam.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dairy sludge generated at Glanbia Ingredients Ltd., Kilkenny has up until now been landspread. This study investigated the feasibility of using earthworms to vermicompost the sludge as an alternative method of treatment. It was found that high levels of ammonia in the sludge led to earthworm fatality but that by manually aerating the sludge the ammonia could be volatilised or by adding zeolite the ammonia could be absorbed, thus solving the problem. In a medium scale trial, the earthworm species Dendrobaena veneta and Eisenia fetida dominated the polyculture. Earthworms grew and generated cocoons during vermicomposting. During vermicomposting no leachate was generated. Nutrient changes took place during vermicomposting. There were high levels of nitrate, increased calcium and sulphate in the vermicomposted dairy sludge. The amount of magnesium, potassium and chloride did not change, while phosphate was undetectable after vermicomposting. The levels of nitrate and phosphate were good indicators of the extent of vermicomposting. The vermicomposted dairy sludge provided improved growth and yields of radishes and barley compared to the dairy sludge and control. Compared to the vermicompost, the dairy sludge provided heavier ryegrass yields and more marigolds with larger flower diameters. Generally, it is the amount of phosphate in dairy sludge that dictates how much can be applied as a fertiliser on land. Vermicomposting reduced the amount of phosphate to an undetectable level but on the other hand created a problem of high nitrate levels. In a pot trial with grass grown in vermicompost the nitrate leached from the vermicompost. In field conditions the leaching of nitrate might occur and could cause an increased risk of contamination of groundwater and watercourses.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Magdeburg, Univ., Fak. für Elektrotechnik und Informationstechnik, Diss., 2011

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dynamic model, tubular reactor, polyethylene, LDPE, discretization, simulation, sensitivity analysis, nonlinear analysis

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conceptualization, speech production, ERPs, fMRI

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Magdeburg, Univ., Fak. für Verfahrens- und Systemtechnik, Diss., 2009

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Magdeburg, Univ., Fak. für Verfahrens- und Systemtechnik, Diss., 2010

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Magdeburg, Univ., Fak. für Elektrotechnik und Informationstechnik, Diss., 2013

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Magdeburg, Univ., Fak. für Maschinenbau, Diss., 2014

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Magdeburg, Univ., Fak. für Elektrotechnik und Informationstechnik, Diss., 2015

Relevância:

20.00% 20.00%

Publicador:

Resumo:

At the moment there is a lack of methodological approaches to formalization of management of innovative projects relating to production systems, as well as to adaptation and practical use of the existing approaches. This article is about one potential approach to the management of innovative projects, which makes the building of innovative process models possible based on objective approach. It outlines the frameworks for the building of innovative project models, and describes the method of transition from conceptual modelling to innovative project management. In this case, the model alone and together with parameters used for evaluation of the project may be unique and depends on the special features of the project, preferences of decision-making person, and production and economic system in which it is to be implemented. Unlike existing approaches, this concept does not place any restrictions on types of models and makes it possible to take into account the specificities of economic and production systems. Principles embodied in the model allow its usage as a basis for simulation model to be used in one of specialized simulation systems, as well as for information system providing information support of decision-making process in production and economic systems both newly developed by the company (enterprise) and designed on the basis of available information systems that interact through the exchange of data. In addition, this article shows that the development of conceptual foundations of innovative project management in the economic and production systems is inseparable from the development of the theory of industrial control systems, and their comprehensive study may be reduced to a set of elements represented as certain algorithms, models and evaluations. Thus, the study of innovative process may be conducted in both directions: from general to particular, and vice versa.