878 resultados para Management by Projects


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The paper describes some relevant results of an on-going research aiming to elaborate a methodology to help the mobility management in natural parks, compatible with their protection missions: it has been developed a procedure to reproduce the mobility-environment relationships in various operational conditions. The final purpose is the identification of: a) the effects of various choices in transport planning, both at long term and strategic level; b) the most effective policies of mobility management. The work is articulated in the following steps: 1) definition of protected area on the basis of ecological and socio-economic criteria and legislative constraints; 2) analysis of mobility needs in the protected areas; 3) reconstruction of the state of the art of mobility management in natural parks at European level; 4) analysis of used traffic flows measurement methods; 5) analysis of environmental impacts due to transport systems modelling (air pollution and noise only); 6) identification of mitigation measures to be potentially applied. The whole methodology has been tested and validated on Italian case studies: i) the concerned area has been zoned according to the land-use peculiarities; ii) the local situations of transport infrastructure (roads and parking), services (public transport systems) and rules (traffic regulations) have been mapped with references to physical and functional attributes; iii) the mobility, both systematic and touristic, has been represented in an origin-destination matrix. By means of an assignment model the flows have been distributed and the corresponding average speeds to quantify gaseous and noise emissions was calculated, the criticalities in the reference scenario have been highlighted, as well as some alternative scenarios, including both operational and infrastructural measures have been identified. The comparison between projects and reference scenario allowed the quantification of effects (variation of emissions) for each scenario and a selection of the most effective management actions to be taken.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

In Chile, during the last three decades there has been a strong decentralization process whose main objective has been to improve the management of schools through the transfer of responsibilities and resources of education and thus improve the outcome of learning, reducing equity gaps between schools and territories. This is how, there has been an evolution of school principals¿ professional profile from an administrative to a management approach, in which principals have become project managers of educational projects. From a competence model for school leaders, based on IPMA guidelines, the present article presents an analysis of best practices for school management, allowing to generate a link between competencies and school management, from the perspective of project management. Results showed that the different competence elements, have relative weights according to the different practice fields, and that this analysis can be considered as a strategic element in educational project planning and development.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The final purpose is the identification of: a) the effects of various choices in transport planning, both at long term and strategic level; b) the most effective policies of mobility management. The preliminary work was articulated in the following steps: 1) definition of protected area on the basis of ecological and socio-economic criteria and legislative constraints; 2) analysis of mobility needs in the protected areas; 3) reconstruction of the state of the art of mobility management in natural parks at European level; 4) analysis of used traffic flows measurement methods; 5) analysis of environmental impacts due to transport systems modelling (limited to air pollution and noise); 6) identification of mitigation measures to the potentially applied. The whole methodology has been firstly tested on the case study of the National Park of ?Gran Sasso and Monti della Laga? and further validated on the National Park of ?Gargano?, both located Italy: i) the concerned area has been zoned according to the land-use peculiarities; ii) the local situations of transport infrastructure (roads and parking), services (public transport systems) and rules (traffic regulations) have been mapped with references to physical and functional attributes; iii) the mobility, both systematic and touristic, has been synthetically represented in an origin-destination matrix. By means of an assignment model it has been determined the distribution of flows and the corresponding average speeds to quantify gaseous and noise emissions. On this basis the environmental criticalities in the reference scenario have been highlighted, as well as some alternative scenarios including both operational and infrastructural measures have been identified. The comparison between the projects and the reference scenario allowed the quantification of the effects (variation of emissions) for each scenario and a selection of the most effective management actions to be taken.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

It is impossible to talk about planning as a scientific meta-discipline without mentioning one of the most influential worldwide figures in the second half of the twentieth century: John Friedmann. His contribution to the planning concept on his "Planning as Social Learning" theory is still very relevant. This paper shows the intellectual connection between Friedmann and Angel Ramos and Ignacio Trueba, two of the Spanish intellectual drivers in the engineering project knowledge area, who contributed to founding the Engineering Projects Spanish Association. The three of them share a broad vision of the project and abandon the "blue print" planning model. They also see the project as a transformational tool that requires a different planning style to the one which prevailed in the 70s - both in public and private domains. They were pioneers in structuring Knowledge / Action in a different way, both in academic institutions where disciples helped to bring about change- and with direct action via projects.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La gestión de las tecnologías de la información tiene cada vez más importancia dentro de un mundo totalmente digitalizado y donde la capacidad de respuesta al cambio puede marcar el devenir de una compañía, y resulta cada vez más evidente que los modelos de gestión tradicionales utilizados en la mayoría de las compañías no son capaces de dar respuesta por si solos a estas nuevas necesidades. Aun teniendo identificado este área de mejora, son muchas las empresas reacias a abordar estos cambios, principalmente por el cambio rupturista que significa a nivel interno. De cara a facilitar esta transformación, se propone en este documento un modelo de transición controlada donde las grandes compañías puedan incorporar nuevas alternativas y herramientas ágiles de forma paulatina y asegurando que el proceso de cambio es seguro y efectivo. Mediante una modificación del ciclo de vida de proyecto dentro de la compañía, se incorporan en las áreas, equipos o dominios de la empresa que se identifiquen los nuevos modelos de gestión ágil, permitiendo así una transición gradual y controlada, y pudiendo además analizar los detalles sobre todo en etapas tempranas de la transformación. Una vez seleccionada el área o dominio objeto de la transformación, se realiza un análisis a nivel de Portfolio de proyectos, identificando aquellos que cumplen una serie de condiciones que les permiten ser gestionados utilizando modelos de gestión ágil. Para ello, se plantea una matriz de decisión con las principales variables a tener en cuenta a la hora de tomar una decisión. Una vez seleccionado y consensuado con los interesados el modelo de gestión utilizando la matriz de decisión, se plantean una serie de herramientas y métricas asociadas para que la gestión ágil del proyecto dé una visibilidad completa y detallada del estado en cada momento, asegurando un correcto proceso de gestión de proyectos para proveer visibilidad regular del progreso, riesgos, planes de contingencia y problemas, con las alertas y escalaciones adecuadas. Además de proponerse una serie de herramientas y métricas para la gestión ágil del proyecto, se plantean las modificaciones necesarias sobre las tipologías habituales de contrato y se propone un nuevo modelo de contrato: el Contrato Agile. La principal diferencia entre este nuevo modelo de contrato y los habituales es que, al igual que las metodologías ágiles, es ejecutado en segmentos o iteraciones. En definitiva, el objetivo de este documento es proveer un mecanismo que facilite la inclusión de nuevos modelos ágiles de gestión en grandes organizaciones, llevando a cabo una transición controlada, con herramientas y métricas adaptadas para tener visibilidad completa sobre los proyectos en todo momento.---ABSTRACT---The information technology management is every time more important in a totally digitized world, where the capacity to response the change could mark the future of a company, and results every time more evident that the traditional management models used in the most of the companies are not able to respond by themselves to these new necessities. Even having identified this improvement area, many companies are reluctant to address these changes, mainly due to the disruptive change that it means internally in the companies. In order to facilitate this transformation, this document proposed a controlled transition model to help the big companies to incorporate new alternatives and agile tools gradually and ensuring that the change process is safe and effective. Through a modification the project life cycle inside the company, the new agile management models are incorporated in the selected areas, teams or domains, permitting a gradual and controlled transition, and enabling further analyze the details above all in the early phases of the transformation. Once is selected the area or domain object of the transformation, a portfolio level analysis is performed, identifying those projects that meet a some conditions that allow them to be managed using agile management models. For that, a decision matrix is proposed with the principal variables to have into account at the time of decision making. Once the management model is selected using the decision matrix and it is agreed with the different stakeholders, a group of tools and metrics associated with the agile management projects are proposed to provide a regular visibility of the project progress, risks, contingency plans and problems, with proper alerts and escalations. Besides the group of tools and metrics proposed for agile project management, the necessary modifications over the traditional contract models and a new contract model are proposed: the Agile Contract. The main difference between this new contract model and the traditional ones is that, as the agile methodologies, it is executed in segments or iterations. To sum up, the objective of this document is to provide a mechanism that facilitates the inclusion of new agile management models in big companies, with a controlled transition and proposing adapted tools and metrics to have a full visibility over the project in all the phases of the project life cycle.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

One important steps in a successful project-based-learning methodology (PBL) is the process of providing the students with a convenient feedback that allows them to keep on developing their projects or to improve them. However, this task is more difficult in massive courses, especially when the project deadline is close. Besides, the continuous evaluation methodology makes necessary to find ways to objectively and continuously measure students' performance without increasing excessively instructors' work load. In order to alleviate these problems, we have developed a web service that allows students to request personal tutoring assistance during the laboratory sessions by specifying the kind of problem they have and the person who could help them to solve it. This service provides tools for the staff to manage the laboratory, for performing continuous evaluation for all students and for the student collaborators, and to prioritize tutoring according to the progress of the student's project. Additionally, the application provides objective metrics which can be used at the end of the subject during the evaluation process in order to support some students' final scores. Different usability statistics and the results of a subjective evaluation with more than 330 students confirm the success of the proposed application.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

PURPOSE The decision-making process plays a key role in organizations. Every decision-making process produces a final choice that may or may not prompt action. Recurrently, decision makers find themselves in the dichotomous question of following a traditional sequence decision-making process where the output of a decision is used as the input of the next stage of the decision, or following a joint decision-making approach where several decisions are taken simultaneously. The implication of the decision-making process will impact different players of the organization. The choice of the decision- making approach becomes difficult to find, even with the current literature and practitioners’ knowledge. The pursuit of better ways for making decisions has been a common goal for academics and practitioners. Management scientists use different techniques and approaches to improve different types of decisions. The purpose of this decision is to use the available resources as well as possible (data and techniques) to achieve the objectives of the organization. The developing and applying of models and concepts may be helpful to solve managerial problems faced every day in different companies. As a result of this research different decision models are presented to contribute to the body of knowledge of management science. The first models are focused on the manufacturing industry and the second part of the models on the health care industry. Despite these models being case specific, they serve the purpose of exemplifying that different approaches to the problems and could provide interesting results. Unfortunately, there is no universal recipe that could be applied to all the problems. Furthermore, the same model could deliver good results with certain data and bad results for other data. A framework to analyse the data before selecting the model to be used is presented and tested in the models developed to exemplify the ideas. METHODOLOGY As the first step of the research a systematic literature review on the joint decision is presented, as are the different opinions and suggestions of different scholars. For the next stage of the thesis, the decision-making process of more than 50 companies was analysed in companies from different sectors in the production planning area at the Job Shop level. The data was obtained using surveys and face-to-face interviews. The following part of the research into the decision-making process was held in two application fields that are highly relevant for our society; manufacturing and health care. The first step was to study the interactions and develop a mathematical model for the replenishment of the car assembly where the problem of “Vehicle routing problem and Inventory” were combined. The next step was to add the scheduling or car production (car sequencing) decision and use some metaheuristics such as ant colony and genetic algorithms to measure if the behaviour is kept up with different case size problems. A similar approach is presented in a production of semiconductors and aviation parts, where a hoist has to change from one station to another to deal with the work, and a jobs schedule has to be done. However, for this problem simulation was used for experimentation. In parallel, the scheduling of operating rooms was studied. Surgeries were allocated to surgeons and the scheduling of operating rooms was analysed. The first part of the research was done in a Teaching hospital, and for the second part the interaction of uncertainty was added. Once the previous problem had been analysed a general framework to characterize the instance was built. In the final chapter a general conclusion is presented. FINDINGS AND PRACTICAL IMPLICATIONS The first part of the contributions is an update of the decision-making literature review. Also an analysis of the possible savings resulting from a change in the decision process is made. Then, the results of the survey, which present a lack of consistency between what the managers believe and the reality of the integration of their decisions. In the next stage of the thesis, a contribution to the body of knowledge of the operation research, with the joint solution of the replenishment, sequencing and inventory problem in the assembly line is made, together with a parallel work with the operating rooms scheduling where different solutions approaches are presented. In addition to the contribution of the solving methods, with the use of different techniques, the main contribution is the framework that is proposed to pre-evaluate the problem before thinking of the techniques to solve it. However, there is no straightforward answer as to whether it is better to have joint or sequential solutions. Following the proposed framework with the evaluation of factors such as the flexibility of the answer, the number of actors, and the tightness of the data, give us important hints as to the most suitable direction to take to tackle the problem. RESEARCH LIMITATIONS AND AVENUES FOR FUTURE RESEARCH In the first part of the work it was really complicated to calculate the possible savings of different projects, since in many papers these quantities are not reported or the impact is based on non-quantifiable benefits. The other issue is the confidentiality of many projects where the data cannot be presented. For the car assembly line problem more computational power would allow us to solve bigger instances. For the operation research problem there was a lack of historical data to perform a parallel analysis in the teaching hospital. In order to keep testing the decision framework it is necessary to keep applying more case studies in order to generalize the results and make them more evident and less ambiguous. The health care field offers great opportunities since despite the recent awareness of the need to improve the decision-making process there are many opportunities to improve. Another big difference with the automotive industry is that the last improvements are not spread among all the actors. Therefore, in the future this research will focus more on the collaboration between academia and the health care sector.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

La tesis doctoral se centra en la posibilidad de entender que la práctica de arquitectura puede encontrar en las prácticas comunicativas un apoyo instrumental, que sobrepasa cualquier simplificación clásica del uso de los medios como una mera aplicación superficial, post-producida o sencillamente promocional. A partir de esta premisa se exponen casos del último cuarto del siglo XX y se detecta que amenazas como el riesgo de la banalización, la posible saturación de la imagen pública o la previsible asociación incorrecta con otros individuos en presentaciones grupales o por temáticas, han podido influir en un crecimiento notable de la adquisición de control, por parte de los arquitectos, en sus oportunidades mediáticas. Esto es, como si la arquitectura hubiera empezado a superar y optimizar algo inevitable, que las fórmulas expositivas y las publicaciones, o más bien del exponer(se) y publicar(se), son herramientas disponibles para activar algún tipo de gestión intelectual de la comunicación e información circulante sobre si misma. Esta práctica de “autoedición” se analiza en un periodo concreto de la trayectoria de OMA -Office for Metropolitan Architecture-, estudio considerado pionero en el uso eficiente, oportunista y personalizado de los medios. Así, la segunda parte de la tesis se ocupa del análisis de su conocida monografía S,M,L,XL (1995), un volumen que contó con gran participación por parte de sus protagonistas durante la edición, y de cuyo proceso de producción apenas se había investigado. Esta publicación señaló un punto de inflexión en su género alterando todo formato y restricciones anteriores, y se ha convertido en un volumen emblemático para la disciplina que ninguna réplica posterior ha podido superar. Aquí se presenta a su vez como el desencadenante de la construcción de un “gran evento” que concluye en la transformación de la identidad de OMA en 10 años, paradójicamente entre el nacimiento de la Fundación Groszstadt y el arranque de la actividad de AMO, dos entidades paralelas clave anexas a OMA. Este planteamiento deviene de cómo la investigación desvela que S,M,L,XL es una pieza más, central pero no independiente, dentro de una suma de acciones e individuos, así como otras publicaciones, exposiciones, eventos y también artículos ensayados y proyectos, en particular Bigness, Generic City, Euralille y los concursos de 1989. Son significativos aspectos como la apertura a una autoría múltiple, encabezada por Rem Koolhaas y el diseñador gráfico Bruce Mau, acompañados en los agradecimientos de la editora Jennifer Sigler y cerca de una centena de nombres, cuyas aportaciones no necesariamente se basan en la construcción de fragmentos del libro. La supresión de ciertos límites permite superar también las tareas inicialmente relevantes en la edición de una publicación. Un objetivo general de la tesis es también la reflexión sobre relaciones anteriormente cuestionadas, como la establecida entre la arquitectura y los mercados o la economía. Tomando como punto de partida la idea de “design intelligence” sugerida por Michael Speaks (2001), se extrae de sus argumentos que lo esencial es el hallazgo de la singularidad o inteligencia propia de cada estudio de arquitectura o diseño. Asimismo se explora si en la construcción de ese tipo de fórmulas magistrales se alojaban también combinaciones de interés y productivas entre asuntos como la eficiencia y la creatividad, o la organización y las ideas. En esta dinámica de relaciones bidireccionales, y en ese presente de exceso de información, se fundamenta la propuesta de una equivalencia más evidenciada entre la “socialización” del trabajo del arquitecto, al compartirlo públicamente e introducir nuevas conversaciones, y la relación inversa a partir del trabajo sobre la “socialización” misma. Como si la consciencia sobre el uso de los medios pudiera ser efectivamente instrumental, y contribuir al desarrollo de la práctica de arquitectura, desde una perspectiva idealmente comprometida e intelectual. ABSTRACT The dissertation argues the possibility to understand that the practice of architecture can find an instrumental support in the practices of communication, overcoming any classical simplification of the use of media, generally reduced to superficial treatments or promotional efforts. Thus some cases of the last decades of the 20th century are presented. Some threats detected, such as the risk of triviality, the saturation of the public image or the foreseeable wrong association among individuals when they are introduced as part of thematic groups, might have encouraged a noticeable increase of command taken by architects when there is chance to intervene in a media environment. In other words, it can be argued that architecture has started to overcome and optimize the inevitable, the fact that exhibition formulas and publications, or simply the practice of (self)exhibition or (self)publication, are tools at our disposal for the activation of any kind of intellectual management of communication and circulating information about itself. This practice of “self-edition” is analyzed in a specific timeframe of OMA’s trajectory, an office that is considered as a ground-breaking actor in the efficient and opportunistic use of media. Then the second part of the thesis dissects their monograph S,M,L,XL (1995), a volume in which its main characters were deeply involved in terms of edition and design, a process barely analyzed up to now. This publication marked a turning point in its own genre, disrupting old formats and traditional restrictions. It became such an emblematic volume for the discipline that none of the following attempts of replica has ever been able to improve this precedent. Here, the book is also presented as the element that triggers the construction of a “big event” that concludes in the transformation of OMA identity in 10 years. Paradoxically, between the birth of the Groszstadt Foundation and the early steps of AMO, both two entities parallel and connected to OMA. This positions emerge from how the research unveils that S,M,L,XL is one more piece, a key one but not an unrelated element, within a sum of actions and individuals, as well as other publications, exhibitions, articles and projects, in particular Bigness, Generic City, Euralille and the competitions of 1989. Among the remarkable innovations of the monograph, there is an outstanding openness to a regime of multiple authorship, headed by Rem Koolhaas and the graphic designer Bruce Mau, who share the acknowledgements page with the editor, Jennifer Sigler, and almost 100 people, not necessarily responsible for specific fragments of the book. In this respect, the dissolution of certain limits made possible that the expected tasks in the edition of a publication could be trespassed. A general goal of the thesis is also to open a debate on typically questioned relations, particularly between architecture and markets or economy. Using the idea of “design intelligence”, outlined by Michael Speaks in 2001, the thesis pulls out its essence, basically the interest in detecting the singularity, or particular intelligence of every office of architecture and design. Then it explores if in the construction of this kind of ingenious formulas one could find interesting and useful combinations among issues like efficiency and creativity, or organization and ideas. This dynamic of bidirectional relations, rescued urgently at this present moment of excess of information, is based on the proposal for a more evident equivalence between the “socialization” of the work in architecture, anytime it is shared in public, and the opposite concept, the work on the proper act of “socialization” itself. As if a new awareness of the capacities of the use of media could turn it into an instrumental force, capable of contributing to the development of the practice of architecture, from an ideally committed and intelectual perspective.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Un figlio con un Disturbo dello Spettro Autistico, caratterizzato da gravi difficoltà nelle relazioni, nei comportamenti e nella comunicazione, costringe tutto il sistema familiare a gestire un notevole stress dovuto alla gestione quotidiana di una patologia così complessa. Per questi motivi, i genitori necessitano di un sostegno il più possibile personalizzato rispetto alle caratteristiche del loro contesto familiare. Per fare questo sarebbe importante individuare quali siano i parametri correlati ai livelli di stress nei familiari di pazienti con autismo e che potrebbero avere un’influenza sul benessere familiare. Lo scopo di questo studio è quello di valutare quali caratteristiche di personalità, stili di coping e capacità di gestire le emozioni possano essere in relazione con la reattività individuale alle situazioni di stress, valutata attraverso alcuni correlati biologici, quali il livello di cortisolo (l’ormone dello stress) e la variabilità della frequenza cardiaca. L’ottica di ricerca applicata fa sì che gli obiettivi ultimi di questo lavoro siano anche quelli di diminuire l’accesso ai servizi per questi soggetti, considerando il fatto che progetti individualizzati di sostegno genitoriale costituiscono un fattore protettivo rispetto a conseguenze fisiche e psicologiche di disagio se implementati tenendo conto della variabilità individuale rispetto alle caratteristiche sopra citate.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Early project termination is one of the most difficult decisions to be made by Research and Development managers. While there is the risk of terminating good projects, there is also the opposite risk of not terminating bad projects and overspend resources in unproductive research. Criteria used for identifying these projects are common subject of research in Business Administration. In addition, companies might take important lessons from its interrupted projects that could improve their overall portfolio technical and commercial success. Finally, the set and weight of criteria, as well as the procedures companies use for achieve learning from cancelled projects may vary depending on the project type. This research intends to contribute to the understanding of policies applied to projects that were once considered attractive, but by some reason is not appreciated anymore. The research addressed the question: How companies deal with projects that become unattractive? More specifically, this research tried to answer the following questions: (1) Are projects killed or (otherwise) they die naturally by lack of resources? (2) What criteria are used to terminate projects during development? (3) How companies learn from the terminated projects to improve the overall portfolio performance? (4) Are the criteria and learning procedures different for different types of projects? In order to answer these questions, we performed a multiple case study with four companies that are reference in business administration and innovation: (1) Oxiteno, considered the base case, (2) Natura, the literal replication, (3) Mahle and (4) AES, the theoretical replications. The case studies were performed using a semi-structured protocol for interviews, which were recorded and analyzed for comparison. We found that the criteria companies use for selecting projects for termination are very similar to those anticipated by the literature, except for a criteria related to compliance. We have evidences to confirm that the set of criteria is not altered when dealing with different project types, however the weight they are applied indeed varies. We also found that learning with cancelled projects is yet very incipient, with very few structured formal procedures being described for capturing learning with early-terminated projects. However, we could observe that these procedures are more common when dealing with projects labeled as innovative, risky, big and costly, while those smaller and cheaper derivative projects aren\'t subject of a complete investigation on the learning they brought to the company. For these, the most common learning route is the informal, where the project team learns and passes the knowledge though interpersonal information exchange. We explain that as a matter of cost versus benefit of spending time to deeply investigate projects with little potential to bring new knowledge to the project team and the organization

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Renewable energy such as biomass has given markets, including dairy farms, an effective approach to reducing the costs of sustaining a profitable business. Anaerobic digestion systems offer dairy farms a very effective way to reduce manure odor, comply with soil and water pollution regulations, manufacture compost for general market sales, produce irrigation capacity and generate on-site electricity as well as the ability to sell excess electricity back to the local utilities. This project defines anaerobic digestion technologies and practices, analyzes case studies and presents a step-by-step anaerobic digestion project startup checklist. The result is an anaerobic digestion project working guide that acts as a tool to aid dairy farmers in their own potential anaerobic digestion project.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The literature states that project duration is affected by various scope factors. Using 168 building projects carried out in Spain, this paper uses the multiple regression analysis to develop a forecast model that allows estimating project duration of new builds. The proposed model uses project type, gross floor area (GFA), the cost/GFA relationship and number of floors as predictor variables. The research identified the logarithmic form of construction speed as the most appropriate response variable. GFA has greater influence than cost on project duration but both factors are necessary to achieve a forecast model with the highest accuracy. We developed an analysis to verify the stability of forecasted values and showed how a model with high values of fit and accuracy may display an anomalous behavior in the forecasted values. The sensitivity of the proposed forecast model was also analyzed versus the variability of construction costs.