1000 resultados para Kenilworth-Parkside Project.
Resumo:
A host of methods and tools to support designing are being developed in Cambridge EDC. These range from tools for design management to those for the generation and selection of design ideas, layouts, materials and production processes. A project, to develop a device to improve arm mobility of muscular dystrophy sufferers, is undertaken as a test-bed to evaluate and improve these methods and tools as well as to observe and modify its design and management processes. This paper presents the difficulties and advantages of using design methods and tools within this rehabilitation design context, with special focus on the evolution of the designs, tools, and management processes.
Resumo:
Human use of water resow-ces in Uganda has grown and intensified along with population growth and increasing demand to meet the diverse human needs. In the case of Uganda's rivers, the main uses include fisheries, hydropower generation, abstraction for potable water supply, discharge of sewage and navigation. All these uses can disrupt the integrity of the aquatic ecosystem and may affect the survival of the diversity of organisms. In consideration of the need to increase electricity to meet demand, the Bujagali Hydro-power Project (BHPP) and the National Environment Management Authority (NEMA) recognised the importance of safeguards to mitigate impacts of the project. The National Fisheries Resources Research Institute (NaFIRRI) was assigned the role of providing baseline information on the aquatic ecosystem of the Upper Victoria Nile and to follow up the findings with a monitoring framework during construction and post-commissioning phases.
Resumo:
A baseline survey for the project which had been conducted in 2009 had gaps that could not allow assessment of project performance in the outcome and impact indicators to be made. This study was, therefore, commissioned to reconstruct the baseline data, aligned to the impact and outcome indicators on the project logframe and results framework, against which project achievements could be assessed. The purpose and scope of the study was to reconstruct the baseline data and analysis describing the situation prior to QAFM Project inception, taking 2008 as the baseline year, which was aligned to the project logframe outcome and impact indicators; to collect data on current status to compare project outcome (and where possible impact) in improved fish handling sites in comparison with the baseline as well as with comparable non-improved fish landing sites as control group. The study was conducted through secondary data search from sources at NaFIRRI, DFR and ICEIDA. Field data collection was carried out using a sample survey covering 312 respondents including boat and gear owners, crew members, processors and traders at eight project and two control landing sites. Key Informant Interviews were conducted with DFOs and BMU leaders in the study districts and landing sites respectively.
Resumo:
The aquatic ecosystem of the Upper Victoria Nile is part of a wider complex of water bodies (lakes and rivers) in Uganda that is of immense socioeconomic importance, especially the fisheries. A source of food, income, energy, irrigation and drinking water, the protection, sustainable use and management of the Upper Victoria Nile water resources are vital to Uganda's economy. The Upper Victoria Nile,due to its abundance of socio-economic benefits,provides a significant contribution to Uganda's economy. The fisheries contribute to the sector as a major source of the export earnings, second to coffee (NEMA,1996), sustain small fishing villages,provide income and generally improve nutrition. Apart from the socio-economic significance of the fisheries,the riverine features of the Upper Victoria Nile, especially its hydropower potential,distinguish this river from the rest of the aquatic ecosystems in the country.
Resumo:
A case study of an aircraft engine manufacturer is used to analyze the effects of management levers on the lead time and design errors generated in an iteration-intensive concurrent engineering process. The levers considered are amount of design-space exploration iteration, degree of process concurrency, and timing of design reviews. Simulation is used to show how the ideal combination of these levers can vary with changes in design problem complexity, which can increase, for instance, when novel technology is incorporated in a design. Results confirm that it is important to consider multiple iteration-influencing factors and their interdependencies to understand concurrent processes, because the factors can interact with confounding effects. The article also demonstrates a new approach to derive a system dynamics model from a process task network. The new approach could be applied to analyze other concurrent engineering scenarios. © The Author(s) 2012.