875 resultados para Graphic design Project
Resumo:
Volatile organic compounds are a common source of groundwater contamination that can be easily removed by air stripping in columns with random packing and using a counter-current flow between the phases. This work proposes a new methodology for column design for any type of packing and contaminant which avoids the necessity of an arbitrary chosen diameter. It also avoids the employment of the usual graphical Eckert correlations for pressure drop. The hydraulic features are previously chosen as a project criterion. The design procedure was translated into a convenient algorithm in C++ language. A column was built in order to test the design, the theoretical steady-state and dynamic behaviour. The experiments were conducted using a solution of chloroform in distilled water. The results allowed for a correction in the theoretical global mass transfer coefficient previously estimated by the Onda correlations, which depend on several parameters that are not easy to control in experiments. For best describe the column behaviour in stationary and dynamic conditions, an original mathematical model was developed. It consists in a system of two partial non linear differential equations (distributed parameters). Nevertheless, when flows are steady, the system became linear, although there is not an evident solution in analytical terms. In steady state the resulting ODE can be solved by analytical methods, and in dynamic state the discretization of the PDE by finite differences allows for the overcoming of this difficulty. To estimate the contaminant concentrations in both phases in the column, a numerical algorithm was used. The high number of resulting algebraic equations and the impossibility of generating a recursive procedure did not allow the construction of a generalized programme. But an iterative procedure developed in an electronic worksheet allowed for the simulation. The solution is stable only for similar discretizations values. If different values for time/space discretization parameters are used, the solution easily becomes unstable. The system dynamic behaviour was simulated for the common liquid phase perturbations: step, impulse, rectangular pulse and sinusoidal. The final results do not configure strange or non-predictable behaviours.
Resumo:
The European Project Semester at ISEP (EPS@ISEP) is a one semester project-based learning programme addressed to engineering students from diverse scientific backgrounds and nationalities. The students, organized in multicultural teams, are challenged to solve real world multidisciplinary problems, accounting for 30 ECTU. The EPS package, although focused on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). This paper presents the study plan, resources, operation and results of the EPS@ISEP that was created in 2011 to apply the best engineering education practices and promote the internationalization of ISEP. The results show that the EPS@ISEP students acquire during one semester the scientific, technical and soft competences necessary to propose, design and implement a solution for a multidisciplinary problem.
Resumo:
Impact Assessment and Project Appraisal, vol. 22, n.1, March 2004, p. 47–62
Resumo:
Current engineering education challenges require approaches that promote scientific, technical, design and complementary skills while fostering autonomy, innovation and responsibility. The European Project Semester (EPS) at Instituto Superior de Engenharia do Porto (ISEP) (EPS@ISEP) is a one semester project-based learning programme (30 European Credit Transfer Units (ECTU)) for engineering students from diverse scientific backgrounds and nationalities that intends to address these goals. The students, organised in multidisciplinary and multicultural teams, are challenged to solve real multidisciplinary problems during one semester. The EPS package, although on project development (20 ECTU), includes a series of complementary seminars aimed at fostering soft, project-related and engineering transversal skills (10 ECTU). Hence, the students enrolled in this programme improve their transversal skills and learn, together and with the team of supervisors, subjects distinct from their core training. This paper presents the structure, implementation and results of the EPS@ISEP that was created in 2011 to apply the best engineering practices and promote internationalisation and engineering education innovation at ISEP.
Resumo:
This paper reports the design of a new remotely operated underwater vehicle (ROV), which has been developed at the Underwater Systems and Technology Laboratory (USTL) - University of Porto. This design is contextualized on the KOS project (Kits for underwater operations). The main issues addressed here concern directional drag minimization, symmetry, optimized thruster positioning, stability and layout of ROV components. This design is aimed at optimizing ROV performance for a set of different operational scenarios. This is achieved through modular configurations which are optimized for each different scenario.
Resumo:
Dissertação apresentada ao Instituto Politécnico de Castelo Branco para cumprimento dos requisitos necessários à obtenção do grau de Mestre em Design Gráfico pela Escola Superior de Artes Aplicadas do Instituto Politécnico de Castelo Branco em associação com a Faculdade de Arquitetura da Universidade de Lisboa.
Resumo:
The project of this thesis proceeds from the study of the relationship between town, people, and design and translates into a proposal for the renovation of the Museum of the Town of Lisbon. It was performed in cooperation with the Museum and with the Faculty of Fine Arts of the University of Lisbon.
Resumo:
Field Lab in Entrepreneurial Innovative Ventures
Resumo:
The following work project illustrates the strategic issues There App, a mobile application, faces regarding the opportunity to expand from its current state as a product to a multisided platform. Initially, a market analysis is performed to identify the ideal customer groups to be integrated in the platform. Strategic design issues are then discussed on how to best match its value proposition with the identified market opportunity. Suggestions on how the company should organize its resources and operational processes to best deliver on its value proposition complete the work.
Resumo:
This work project aims to demonstrate how to design and develop an innovative concept of video streaming app. The project combines technology push and market pull theories into developing a product that is more suitable for the customer needs, with the particularity that there is no other way of seeing any place in the world, live and ondemand. An analysis on the bigger influencers in terms of design-thinking and new product development, as Tim Brown or Paul Trott, lead to a better understanding on how There App should evolve, keeping in mind the customer desires and technical features.
Resumo:
The present Working Project aims at studying the topic of assurance mapping in a specific organizational context of a Portuguese retail company. For this purpose, an assurance map framework was designed to support the decision making process of stakeholders, through the delivery of comfort concerning risks, operations and control. In the end, the framework was successfully implemented for the process sourcing of goods in two business units of the company. Although, further implementation of the framework proved not to be feasible during the project’s timespan, it is expected to occur in the near future.
Resumo:
The present work project investigates the implications of design thinking on an interbusiness collaborative project, unveiling both the benefits and fragilities that derive from the use of such methodology within the mentioned context. The study is organized in two parts. The first one starts with a literature review on the two relevant frames of reference – design thinking and business collaboration. It proceeds to the creation of a conceptual framework to assess the potential value of the design-based approach. The second part focuses on the practical application of to the newly developed instrument to the inTRAIN project – R&D for railway interiors.
Resumo:
Pictured here from left to right are Chairman of the Board, Whiting Lathrop, President James Gibson, and Architect Raymond Moriyama during the formal presentation of the $7.7 million MacKenzie Chown Complex project, which at the time was known as the Academic Staging Building or simply East Block.
Resumo:
The "Java Intelligent Tutoring System" (JITS) research project focused on designing, constructing, and determining the effectiveness of an Intelligent Tutoring System for beginner Java programming students at the postsecondary level. The participants in this research were students in the School of Applied Computing and Engineering Sciences at Sheridan College. This research involved consistently gathering input from students and instructors using JITS as it developed. The cyclic process involving designing, developing, testing, and refinement was used for the construction of JITS to ensure that it adequately meets the needs of students and instructors. The second objective in this dissertation determined the effectiveness of learning within this environment. The main findings indicate that JITS is a richly interactive ITS that engages students on Java programming problems. JITS is equipped with a sophisticated personalized feedback mechanism that models and supports each student in his/her learning style. The assessment component involved 2 main quantitative experiments to determine the effectiveness of JITS in terms of student performance. In both experiments it was determined that a statistically significant difference was achieved between the control group and the experimental group (i.e., JITS group). The main effect for Test (i.e., pre- and postiest), F( l , 35) == 119.43,p < .001, was qualified by a Test by Group interaction, F( l , 35) == 4.98,p < .05, and a Test by Time interaction, F( l , 35) == 43.82, p < .001. Similar findings were found for the second experiment; Test by Group interaction revealed F( 1 , 92) == 5.36, p < .025. In both experiments the JITS groups outperformed the corresponding control groups at posttest.
Resumo:
Two classes of building blocks have been prepared and characterized and their coordination chemistry explored working towards the preparation of new molecule-based magnetic materials. In the first project, the amine functionality of 3,3'-diamino-2,2'- bipyridine was exploited for the preparation of a new family of ligands (H2L 1)-(H2L 4). The molecular structures of three ligands have been fully characterized by X-ray crystallography. [molecular structure diagram will not copy here, but is available in full pdf.] The coordination chemistry of these ligands with divalent first row transition metal ions was investigated. For ligand (H2L1), the molecular structures of four coordination complexes with stoichiometries [Zn2(Ll)(OAc)(MeO)]2 (I), [Cu2(L1)(OAc)2 (II), [Li(L1)]3 (III), and [Ni(L1)]3 (IV) were determined by X-ray crystallography. For ligand (H2L2), a Cu(II) complex of stoichiometry [Cu3(L2)(OAc)3MeO] (V) was determined by X-ray crystallography. The magnetic properties of complexes (II), (III), and (V) have been fully elucidated. In project two, synthetic strategies for the preparation of porphyrin molecules bearing triol substituents is presented. Following this approach, three new porphyrin derivatives have been prepared and characterized [Zn(HPTPP-CH2C(CH20H)3)] (VI), [P(TPP)(OCH2C(CH2)H)3)2]+CL- (VII), and [P(OEP)(C6H5)(OCH2C(CH2OH)3)]+Cl- (VIII). Attempts to exchange the labile methoxide bridges of a tetraironIIl single molecule magnet of stoichiometry [Fe4(OMe)6(dpm)6] (Hdpm = dipivaloylmethane) with the triol appended porphyrins will be discussed. [molecular structure diagram will not copy here, but is available in full pdf.]