830 resultados para Coastal zone management - Victoria
Resumo:
The measures by which major developments are officially approved for construction are - by common agreement - complex, time-consuming, and of questionable merit in terms of maintaining ecological viability.
Resumo:
The growing public concern about the complexity, cost and uncertain efficacy of the statuary environmental impact assessment process applying to large-scale projects in Queensland is reviewed. This is based on field data gathered over the past six years sat large-scale marina developments that access major environmental reserves along the coast. An ecological design proposal to broaden the process consisted with both government aspirations and regional ecological parameters - termed Regional Landscape Strategies - would allow the existing Environmental Impact Asessment to be modified alone potentially more practicable and effective lines.
Resumo:
The Climate Change Adaptation for Natural Resource Management (NRM) in East Coast Australia Project aims to foster and support an effective “community of practice” for climate change adaptation within the East Coast Cluster NRM regions that will increase the capacity for adaptation to climate change through enhancements in knowledge and skills and through the establishment of long‐term collaborations. It is being delivered by six consortium research partners: * The University of Queensland (project lead) * Griffith University * University of the Sunshine Coast * CSIRO * New South Wales Office of Environment and Heritage * Queensland Department of Science, IT, Innovation and the Arts (Queensland Herbarium). The project relates to the East Coast Cluster, comprising the six coastal NRM regions and regional bodies between Rockhampton and Sydney: * Fitzroy Basin Association (FBA) * Burnett‐Mary Regional Group (BMRG) * SEQ Catchments (SEQC) * Northern Rivers Catchment Management Authority (CMA) (NRCMA) * Hunter‐Central Rivers CMA (HCRCMA) * Hawkesbury Nepean CMA (HNCMA). The aims of this report are to summarise the needs of the regional bodies in relation to NRM planning for climate change adaptation, and provide a basis for developing the detailed work plan for the research consortium. Two primary methods were used to identify the needs of the regional bodies: (1) document analysis of the existing NRM/ Catchment Action Plans (CAPs) and applications by the regional bodies for funding under Stream 1 of the Regional NRM Planning for Climate Change Fund, and; (2) a needs analysis workshop, held in May 2013 involving representatives from the research consortium partners and the regional bodies. The East Coast Cluster includes five of the ten largest significant urban areas in Australia, world heritage listed natural environments, significant agriculture, mining and extensive grazing. The three NSW CMAs have recently completed strategic level CAPs, with implementation plans to be finalised in 2014/2015. SEQC and FBA are beginning a review of their existing NRM Plans, to be completed in 2014 and 2015 respectively; while BMRG is aiming to produce a NRM and Climate Variability Action Strategy. The regional bodies will receive funding from the Australian Government through the Regional NRM Planning for Climate Change Fund (NRM Fund) to improve regional planning for climate change and help guide the location of carbon and biodiversity activities, including wildlife corridors. The bulk of the funding will be available for activities in 2013/2014, with smaller amounts available in subsequent years. Most regional bodies aim to have a large proportion of the planning work complete by the end of 2014. In addition, NSW CMAs are undergoing major structural change and will be incorporated into semi‐autonomous statutory Local Land Services bodies from 2014. Boundaries will align with local government boundaries and there will be significant change in staff and structures. The regional bodies in the cluster have a varying degree of climate knowledge. All plans recognise climate change as a key driver of change, but there are few specific actions or targets addressing climate change. Regional bodies also have varying capacity to analyse large volumes of spatial or modelling data. Due to the complex nature of natural resource management, all regional bodies work with key stakeholders (e.g. local government, industry groups, and community groups) to deliver NRM outcomes. Regional bodies therefore require project outputs that can be used directly in stakeholder engagement activities, and are likely to require some form of capacity building associated with each of the outputs to maximise uptake. Some of the immediate needs of the regional bodies are a summary of information or tools that are able to be used immediately; and a summary of the key outputs and milestone dates for the project, to facilitate alignment of planning activities with research outputs. A project framework is useful to show the linkages between research elements and the relevance of the research to the adaptive management cycle for NRM planning in which the regional bodies are engaged. A draft framework is proposed to stimulate and promote discussion on research elements and linkages; this will be refined during and following the development of the detailed project work plan. The regional bodies strongly emphasised the need to incorporate a shift to a systems based resilience approach to NRM planning, and that approach is included in the framework. The regional bodies identified that information on climate projections would be most useful at regional and subregional scale, to feed into scenario planning and impact analysis. Outputs should be ‘engagement ready’ and there is a need for capacity building to enable regional bodies to understand and use the projections in stakeholder engagement. There was interest in understanding the impacts of climate change projections on ecosystems (e.g. ecosystem shift), and the consequent impacts on the production of ecosystem services. It was emphasised that any modelling should be able to be used by the regional bodies with their stakeholders to allow for community input (i.e. no black box models). The online regrowth benefits tool was of great interest to the regional bodies, as spatial mapping of carbon farming opportunities would be relevant to their funding requirements. The NSW CMAs identified an interest in development of the tool for NSW vegetation types. Needs relating to socio‐economic information included understanding the socio‐economic determinants of carbon farming uptake and managing community expectations. A need was also identified to understand the vulnerability of industry groups as well as community to climate change impacts, and in particular understanding how changes in the flow of ecosystem services would interact with the vulnerability of these groups to impact on the linked ecologicalsocio‐economic system. Responses to disasters (particularly flooding and storm surge) and recovery responses were also identified as being of interest. An ecosystem services framework was highlighted as a useful approach to synthesising biophysical and socioeconomic information in the context of a systems based, resilience approach to NRM planning. A need was identified to develop processes to move towards such an approach to NRM planning from the current asset management approach. Examples of best practice in incorporating climate science into planning, using scenarios for stakeholder engagement in planning and processes for institutionalising learning were also identified as cross‐cutting needs. The over‐arching theme identified was the need for capacity building for the NRM bodies to best use the information available at any point in time. To this end a planners working group has been established to support the building of a network of informed and articulate NRM agents with knowledge of current climate science and capacity to use current tools to engage stakeholders in NRM planning for climate change adaptation. The planners working group would form the core group of the community of practice, with the broader group of stakeholders participating when activities aligned with their interests. In this way, it is anticipated that the Project will contribute to building capacity within the wider community to effectively plan for climate change adaptation.
Resumo:
INTRODUCTION Managing spinal deformities in young children is challenging, particularly early onset scoliosis (EOS). Surgical intervention is often required if EOS has been unresponsive to conservative treatment particularly with rapidly progressive curves. An emerging treatment option for EOS is fusionless scoliosis surgery. Similar to bracing, this surgical option potentially harnesses growth, motion and function of the spine along with correcting spinal deformity. Dual growing rods are one such fusionless treatment, which aims to modulate growth of the vertebrae. The aim of this study was to ascertain the extent to which semiconstrained growing rods (Medtronic, Sofamor, Danek, Memphis, TN) with a telescopic sleeve component, reduce rotational constraint on the spine compared with standard "constrained / rigid" rods and hence potentially provide a more physiological mechanical environment for the growing spine. METHODS Six 40-60kg English Large White porcine spines served as a model for the paediatric human spine. Each spine was dissected into a 7 level thoracolumbar multi-segment unit (MSU), removing all non-ligamentous soft tissues and leaving 3cm of ribs either side. Pure nondestructive axial rotation moments of ±4Nm at a constant rotation rate of 8deg.s-1 were applied to the mounted MSU spines using a biaxial Instron testing machine. Displacement of each vertebral level was captured using a 3D motion tracking system (Optotrak 3020, Northern Digital Inc, Waterloo, ON). Each spine was tested in an un-instrumented state first and then with appropriately sized semi-constrained growing rods and rigid rods in alternating sequence. The rods were secured by multi-axial pedicle screws (Medtronic CD Horizon) at levels 2 and 6 of the construct. The range of motion (ROM), neutral zone (NZ) size and stiffness (Nm.deg-1) were calculated from the Instron load-displacement data and intervertebral ROM was calculated through a MATLAB algorithm from Optotrak data. RESULTS Irrespective of the order of testing, rigid rods significantly reduced the total ROM compared with semi-constrained rods (p<0.05) with in a significantly stiffer spine for both left and right axial rotation (p<0.05). Analysing the intervertebral motion within the instrumented levels 2-6, rigid rods showed reduced ROM compared with semi-constrained growing rods and compared with un-instrumented motion segments. CONCLUSION Semi-constrained growing rods maintain similar stiffness in axial rotation to un-instrumented spines, while dual rigid rods significantly reduce axial rotation. Clinically the effect of semi-constrained growing rods as observed in this study is that they would be expected to allow growth via the telescopic rod components while maintaining the axial flexibility of the spine, which may reduce occurrence of the crankshaft phenomenon.
Resumo:
INTRODUCTION Managing spinal deformities in young children is challenging, particularly early-onset scoliosis (EOS). Any progressive spinal deformity particularly in early life presents significant health risks for the child and a challenge for the treating surgeon. Surgical intervention is often required if EOS has been unresponsive to conservative treatment particularly with rapidly progressive curves. An emerging treatment option particularly for EOS is fusionless scoliosis surgery. Similar to bracing this surgical option potentially harnesses growth, motion and function of the spine along with correcting spinal deformity. Dual growing rods is one such fusionless treatment, which aims to modulate growth of the vertebrae. The aim of this study was to ascertain the extent to which semi-constrained growing rods (Medtronic, Memphis, TN) with a telescopic sleeve component, reduce rotational constraint on the spine compared with standard rigid rods and hence potentially provide a more physiological mechanical environment for the growing spine. METHODS Six 40-60kg English Large White porcine spines served as a model for the paediatric human spine. Each spine was dissected into 7 level thoracolumbar multi-segment unit (MSU) spines, removing all non-ligamentous soft tissues. Appropriately sized semi-constrained growing rods and rigid rods were secured by multi-axial screws (Medtronic) prior to testing in alternating sequences for each spine. Pure nondestructive moments of +/4Nm at a constant rotation rate of 8deg/s was applied to the mounted MSU spines. Displacement of each level was captured using an Optotrak (Northern Digital Inc, Waterloo, ON). The range of motion (ROM), neutral zone (NZ) size and stiffness (Nm/deg) were calculated from the Instron load-displacement data and intervertebral ROM was calculated through a MATLAB algorithm from Optotrak data. RESULTS Irrespective of sequence order rigid rods significantly reduced the total ROM (deg) than compared to semi-constrained rods (p<0.05) and resulted in a significantly stiffer (Nm/deg) spine for both left and right axial rotation testing (p<0.05). Analysing the intervertebral motion within the instrumented levels, rigid rods showed reduced ROM (Deg) than compared to semi-constrained growing rods and the un-instrumented (UN-IN) test sequences. CONCLUSION The semi-constrained growing rods maintained rotation similar to UN-IN spines while the rigid rods showed significantly reduced axial rotation across all instrumented levels. Clinically the effect of semi-constrained growing rods evaluated in this study is that they will allow growth via the telescopic rod components while maintaining the axial rotation ability of the spine, which may also reduce the occurrence of the crankshaft phenomenon.
Resumo:
Purpose The purpose of this paper is to explore and compare the asset management policies and practices of six Australian states – New South Wales, Victoria, Queensland, South Australia, Western Australia and Tasmania – to improve understanding of the policy context to best shape policy focus and guidelines. Australian state-wide asset management policies and guidelines are an emergent policy domain, generating a substantial body of knowledge. However, these documents are spread across the layers of government and are therefore largely fragmented and lack coherency. Design/methodology/approach The comparative study is based on the thematic mapping technique using the Leximancer software. Findings Asset management policies and guidelines of New South Wales and Victoria have more interconnected themes as compared to other states in Australia. Moreover, based on the findings, New South Wales has covered most of the key concepts in relation to asset management; the remaining five states are yet to develop a comprehensive and integrated approach to asset management policies and guidelines. Research limitations/implications This review and its findings have provided a number of directions on which government policies can now be better constructed and assessed. In doing so, the paper contributes to a coherent way forward to satisfy national emergent and ongoing asset management challenges. This paper outlines a rigorous analytical methodology to inform specific policy changes. Originality/value This paper provides a basis for further research focused on analyzing the context and processes of asset management guidelines and policies.
Resumo:
This thesis deals with the issues of quantifying economic values of coastal and marine ecosystem services and assessing their use in decision-making. The first analytical part of the thesis focuses on estimating non-market use and non-use values, with an application in New-Caledonia using Discrete Choice Experiment. The second part examines how and to what extent the economic valuation of ecosystem services is used in coastal management decision-making with an application in Australia. Using a multi-criteria analysis, the relative importance of ecological, social and economic evaluation criteria is also assessed in the context of coastal development.
Resumo:
Roadworks are essential to a safe and efficient road network, yet somewhat paradoxically the necessary work is often associated with increased risk to motorists and workers, as well as with traffic flow disruptions. A major source of increased crash risk at roadwork sites (work zones) is poor speed limit compliance. Speeding in work zones is examined in existing literature to the extent that major issues are known and some effective countermeasures are identified. However, as speeding remains a major problem in work zones, influences on driver behaviour arguably need to be better understood to achieve greater compliance and thus realise further gains in road safety. Current research on safety at Queensland roadwork sites has examined the views of workers, measured work zone speed profiles, and conducted an online survey of drivers (N=410). This paper focuses on survey participants’ ratings of 12 specific work zone items (including traffic control measures) in terms of their influence on speed choice. Repeated measures ANOVA revealed statistically significant differences (p<0.001) in the ratings of these items, with the most influential including visible presence of workers, visible police presence, and speed feedback displays. Those rated least influential included ’roadwork speed limits are enforced’ and ‘reduce speed’ signs and increased fines for speeding in work zones. The paper considers the alignment of these findings with those from other sources, including worker interviews and the literature, to provide a consolidated assessment of the influence of work zone items on driver speeds.
Resumo:
Coastal resources are coming under increasing pressure from competition between recreational, commercial and conservation uses. This is particularly so in coastal areas adjacent to major population centres. Given high recreational and conservation values in such areas, economic activities need to be highly efficient in order to persist. Management of these industries must therefore also encourage efficient production and full utilisation of the areas available. In order to achieve this, managers must first understand the level and drivers of productivity, and how these can be influenced. In this study, by way of illustration, the focus was on the Sydney rock oyster industry within Queensland's Moreton Bay, a multiple use marine park with high recreational and conservation value adjacent to Australia's third largest city. Productivity of the oyster industry in Moreton Bay is currently low compared to historic levels, and management has an objective of reversing this trend. It is unclear whether this difference is due to oyster farmers' business choices and personal characteristics or whether varying environmental conditions in the Moreton Bay limit the capacity of the oyster industry. These require different management responses in order to enhance productivity. The study examined different productivity measures of the oyster industry using data envelopment analysis (DEA) to determine where productivity gains can be made and by how much. The findings suggest that the industry is operating at a high level of capacity utilisation, but a low level of efficiency. The results also suggest that both demographic and environmental conditions affect technical efficiency in the Bay, with water characteristics improvements and appropriate training potentially providing the greatest benefits to the industry. Methods used in this study are transferable to other industries and provide a means by which coastal aquaculture may be managed to ensure it remains competitive with other uses of coastal resources.
Resumo:
These guidelines are intended to provide clinicians and palliative care services with guidelines to inform practice, the development of policy and procedures, and associated training and education programs in relation to portable subcutaneous infusion device (syringe driver) management.
Resumo:
The aim of this project was to develop clinical practice guidelines for the use and administration of pharmacological agents for symptom control via syringe drivers within Australia. By developing evidence-based clinical practice guidelines for the use of this common device, this project aimed to improve patient outcomes, reduce practice variation, minimize errors and encourage more efficient use of resources. A literature review identified current literature regarding syringe driver management and an expert panel was assembled to assist in the development of the guidelines. The development of these practice guidelines provides an example of how palliative care practitioners can use a framework of contemporary evidence to enhance clinical practice.
Resumo:
Moreton Island and several other large siliceous sand dune islands and mainland barrier deposits in SE Queensland represent the distal, onshore component of an extensive Quaternary continental shelf sediment system. This sediment has been transported up to 1000 km along the coast and shelf of SE Australia over multiple glacioeustatic sea-level cycles. Stratigraphic relationships and a preliminary Optically Stimulated Luminance (OSL) chronology for Moreton Island indicate a middle Pleistocene age for the large majority of the deposit. Dune units exposed in the centre of the island and on the east coast have OSL ages that indicate deposition occurred between approximately 540 ka and 350 ka BP, and at around 96±10 ka BP. Much of the southern half of the island has a veneer of much younger sediment, with OSL ages of 0.90±0.11 ka, 1.28±0.16 ka, 5.75±0.53 ka and <0.45 ka BP. The younger deposits were partially derived from the reworking of the upper leached zone of the much older dunes. A large parabolic dune at the northern end of the island, OSL age of 9.90±1.0 ka BP, and palaeosol exposures that extend below present sea level suggest the Pleistocene dunes were sourced from shorelines positioned several to tens of metres lower than, and up to few kilometres seaward of the present shoreline. Given the lower gradient of the inner shelf a few km seaward of the island, it seems likely that periods of intermediate sea level (e.g. ~20 m below present) produced strongly positive onshore sediment budgets and the mobilisation of dunes inland to form much of what now comprises Moreton Island. The new OSL ages and comprehensive OSL chronology for the Cooloola deposit, 100 km north of Moreton Island, indicate that the bulk of the coastal dune deposits in SE Queensland were emplaced between approximately 540 ka BP and prior to the Last Interglacial. This chronostratigraphic information improves our fundamental understanding of long-term sediment transport and accumulation on large-scale continental shelf sediment systems.
Resumo:
Runoff and sediment loss from forest roads were monitored for a two-year period in a Pinus plantation in southeast Queensland. Two classes of road were investigated: a gravelled road, which is used as a primary daily haulage route for the logging area, and an ungravelled road, which provides the main access route for individual logging compartments and is intensively used as a haulage route only during the harvest of these areas (approximately every 30 years). Both roads were subjected to routine traffic loads and maintenance during the study. Surface runoff in response to natural rainfall was measured and samples taken for the determination of sediment and nutrient (total nitrogen, total phosphorus, dissolved organic carbon and total iron) loads from each road. Results revealed that the mean runoff coefficient (runoff depth/rainfall depth) was consistently higher from the gravelled road plot with 0.57, as compared to the ungravelled road with 0.38. Total sediment loss over the two-year period was greatest from the gravelled road plot at 5.7 t km−1 compared to the ungravelled road plot with 3.9 t km−1. Suspended solids contributed 86% of the total sediment loss from the gravelled road, and 72% from the ungravelled road over the two years. Nitrogen loads from the two roads were both relatively constant throughout the study, and averaged 5.2 and 2.9 kg km−1 from the gravelled and ungravelled road, respectively. Mean annual phosphorus loads were 0.6 kg km−1 from the gravelled road and 0.2 kg km−1 from the ungravelled road. Organic carbon and total iron loads increased in the second year of the study, which was a much wetter year, and are thought to reflect the breakdown of organic matter in roadside drains and increased sediment generation, respectively. When road and drain maintenance (grading) was performed runoff and sediment loss were increased from both road types. Additionally, the breakdown of the gravel road base due to high traffic intensity during wet conditions resulted in the formation of deep (10 cm) ruts which increased erosion. The Water Erosion Prediction Project (WEPP):Road model was used to compare predicted to observed runoff and sediment loss from the two road classes investigated. For individual rainfall events, WEPP:Road predicted output showed strong agreement with observed values of runoff and sediment loss. WEPP:Road predictions for annual sediment loss from the entire forestry road network in the study area also showed reasonable agreement with the extrapolated observed values.
Resumo:
Rainfall simulation experiments were carried out to measure runoff and soil water fluxes of suspended solids, total nitrogen, total phosphorus, dissolved organic carbon and total iron from sites in Pinus plantations on the coastal lowlands of south-eastern Queensland subjected to various operations (treatments). The operations investigated were cultivated and nil-cultivated site preparation, fertilised site preparation, clearfall harvesting and prescribed burning; these treatments were compared with an 8-y-old established plantation. Flow-weighted mean concentrations of total nitrogen and total phosphorus in surface runoff from the cultivated and nil-cultivated site-preparation, clearfall harvest, prescribed burning and 8-y-old established plantation treatments were very similar. However, both the soil water and the runoff from the fertilised site preparation treatment contained more nitrogen (N) and phosphorus (P) than the other treatments - with 3.10 mg N L-1 and 4.32 mg P L-1 (4 and 20 times more) in the runoff. Dissolved organic carbon concentrations in runoff from the nil-cultivated site-preparation and prescribed burn treatments were elevated. Iron concentrations were highest in runoff from the nil-cultivated site-preparation and 8-y-old established plantation treatments. Concentrations of suspended solids in runoff were higher from cultivated site preparation and prescribed burn treatments, and reflect the great disturbance of surface soil at these sites. The concentrations of all analytes were highest in initial runoff from plots, and generally decreased with time. Total nitrogen (mean 7.28, range 0.11-13.27 mg L-1) and total phosphorus (mean 11.60, range 0.06-83.99 mg L-1) concentrations in soil water were between 2 and 10 times greater than in surface runoff, which highlights the potential for nutrient fluxes in interflow (i.e. in the soil above the water table) through the general plantation area. Implications in regard to forest management are discussed, along with results of larger catchment-scale studies.
Resumo:
Data on seasonal population abundance of Bemisia tabaci biotype B (silverleaf whitefly (SLW)) in Australian cotton fields collected over four consecutive growing seasons (2002/2003-2005/2006) were used to develop and validate a multiple-threshold-based management and sampling plan. Non-linear growth trajectories estimated from the field sampling data were used as benchmarks to classify adult SLW field populations into six density-based management zones with associated control recommendations in the context of peak flowering and open boll crop growth stages. Control options based on application of insect growth regulators (IGRs) are recommended for high-density populations (>2 adults/leaf) whereas conventional (non-IGR) products are recommended for the control of low to moderate population densities. A computerised re-sampling program was used to develop and test a binomial sampling plan. Binomial models with thresholds of T=1, 2 and 3 adults/leaf were tested using the field abundance data. A binomial plan based on a tally threshold of T=2 adults/leaf and a minimum sample of 20 leaves at nodes 3, 4 or 5 below the terminal is recommended as the most parsimonious and practical sampling protocol for Australian cotton fields. A decision support guide with management zone boundaries expressed as binomial counts and control options appropriate for various SLW density situations is presented. Appropriate use of chemical insecticides and tactics for successful field control of whiteflies are discussed.