905 resultados para City planning and redevelopment
Resumo:
Proyecto presentado en el concurso de dos fases: 1ª fase: estudio de ideas y propuestas para la ordenación del ámbito central del POTLA.2ª fase: POI y estudio de impacto ambiental del llano central, POT
Resumo:
Introduction: Schizophrenia is associated with multiple neuropsychological dysfunctions, such as disturbances of attention, memory, perceptual functioning, concept formation and executive processes. These cognitive functions are reported to depend on the integrity of the prefrontal and thalamo-prefrontal circuits. Multiple lines of evidence suggest that schizophrenia is related to abnormalities in neural circuitry and impaired structural connectivity. Here, we report a preliminary case-control study that showed a correlation between thalamo-frontal connections and several cognitive functions known to be impaired in schizophrenia. Materials and Methods: We investigated 9 schizophrenic patients (DSM IV criteria, Diagnostic Interview for Genetic Studies) and 9 age and sex matched control subjects. We obtained from each volunteer a DT-MRI dataset (3 T, _ _ 1,000 s/mm2), and a high resolution anatomic T1. The thalamo- frontal tracts are simulated with DTI tractography on these dataset, a method allowing inference of the main neural fiber tracks from Diffusion MRI data. In order to see an eventual correlation with the thalamo-frontal connections, every subject performs a battery of neuropsychological tests including computerized tests of attention (sustained attention, selective attention and reaction time), working memory tests (Plane test and the working memory sub-tests of the Wechsler Adult Intelligence Scale), a executive functioning task (Tower of Hanoï) and a test of visual binding abilities. Results: In a pilot case-control study (patients: n _ 9; controls: n _ 9), we showed that this methodology is appropriate and giving results in the excepted range. Considering the relation of the connectivity density and the neuropsychological data, a correlation between the number of thalamo- frontal fibers and the performance in the Tower of Hanoï was observed in the patients (Pearson correlation, r _ 0.76, p _ 0.05) but not in control subjects. In the most difficult item of the test, the least number of fibers corresponds to the worst performance of the test (fig. 2, number of supplementary movements of the elements necessary to realize the right configuration). It's interesting to note here that in an independent study, we showed that schizophrenia patients (n _ 32) perform in the most difficult item of the Tower of Hanoï (Mann-Whitney, p _ 0.005) significantly worse than control subjects (n _ 29). This has been observed in several others neuropsychological studies. Discussion: This pilot study of schizophrenia patients shows a correlation between the number of thalam-frontal fibers and the performance in the Tower of Hanoï, which is a planning and goal oriented actions task known to be associated with frontal dysfonction. This observation is consistent with the proposed impaired connectivity in schizophrenia. We aim to pursue the study with a larger sample in order to determine if other neuropsychological tests may be associated with the connectivity density.
Resumo:
Interdisciplinary frameworks for studying natural hazards and their temporal trends have an important potential in data generation for risk assessment, land use planning, and therefore the sustainable management of resources. This paper focuses on the adjustments required because of the wide variety of scientific fields involved in the reconstruction and characterisation of flood events for the past 1000 years. The aim of this paper is to describe various methodological aspects of the study of flood events in their historical dimension, including the critical evaluation of old documentary and instrumental sources, flood-event classification and hydraulic modelling, and homogeneity and quality control tests. Standardized criteria for flood classification have been defined and applied to the Isère and Drac floods in France, from 1600 to 1950, and to the Ter, the Llobregat and the Segre floods, in Spain, from 1300 to 1980. The analysis on the Drac and Isère data series from 1600 to the present day showed that extraordinary and catastrophic floods were not distributed uniformly in time. However, the largest floods (general catastrophic floods) were homogeneously distributed in time within the period 1600¿1900. No major flood occurred during the 20th century in these rivers. From 1300 to the present day, no homogeneous behaviour was observed for extraordinary floods in the Spanish rivers. The largest floods were uniformly distributed in time within the period 1300-1900, for the Segre and Ter rivers.
Resumo:
Astute control of brain activity states is critical for adaptive behaviours and survival. In mammals and birds, electroencephalographic recordings reveal alternating states of wakefulness, slow wave sleep and paradoxical sleep (or rapid eye movement sleep). This control is profoundly impaired in narcolepsy with cataplexy, a disease resulting from the loss of orexin/hypocretin neurotransmitter signalling in the brain. Narcolepsy with cataplexy is characterized by irresistible bouts of sleep during the day, sleep fragmentation during the night and episodes of cataplexy, a sudden loss of muscle tone while awake and experiencing emotions. The neural mechanisms underlying cataplexy are unknown, but commonly thought to involve those of rapid eye movement-sleep atonia, and cataplexy typically is considered as a rapid eye movement sleep disorder. Here we reassess cataplexy in hypocretin (Hcrt, also known as orexin) gene knockout mice. Using a novel video/electroencephalogram double-blind scoring method, we show that cataplexy is not a state per se, as believed previously, but a dynamic, multi-phased process involving a reproducible progression of states. A knockout-specific state and a stereotypical paroxysmal event were introduced to account for signals and electroencephalogram spectral characteristics not seen in wild-type littermates. Cataplexy almost invariably started with a brief phase of wake-like electroencephalogram, followed by a phase featuring high-amplitude irregular theta oscillations, defining an activity profile distinct from paradoxical sleep, referred to as cataplexy-associated state and in the course of which 1.5-2 s high-amplitude, highly regular, hypersynchronous paroxysmal theta bursts (∼7 Hz) occurred. In contrast to cataplexy onset, exit from cataplexy did not show a predictable sequence of activities. Altogether, these data contradict the hypothesis that cataplexy is a state similar to paradoxical sleep, even if long cataplexies may evolve into paradoxical sleep. Although not exclusive to overt cataplexy, cataplexy-associated state and hypersynchronous paroxysmal theta activities are highly enriched during cataplexy in hypocretin/orexin knockout mice. Their occurrence in an independent narcolepsy mouse model, the orexin/ataxin 3 transgenic mouse, undergoing loss of orexin neurons, was confirmed. Importantly, we document for the first time similar paroxysmal theta hypersynchronies (∼4 Hz) during cataplexy in narcoleptic children. Lastly, we show by deep recordings in mice that the cataplexy-associated state and hypersynchronous paroxysmal theta activities are independent of hippocampal theta and involve the frontal cortex. Cataplexy hypersynchronous paroxysmal theta bursts may represent medial prefrontal activity, associated in humans and rodents with reward-driven motor impulse, planning and conflict monitoring.
Resumo:
Il est important pour les entreprises de compresser les informations détaillées dans des sets d'information plus compréhensibles. Au chapitre 1, je résume et structure la littérature sur le sujet « agrégation d'informations » en contrôle de gestion. Je récapitule l'analyse coûts-bénéfices que les comptables internes doivent considérer quand ils décident des niveaux optimaux d'agrégation d'informations. Au-delà de la perspective fondamentale du contenu d'information, les entreprises doivent aussi prendre en considération des perspectives cogni- tives et comportementales. Je développe ces aspects en faisant la part entre la comptabilité analytique, les budgets et plans, et la mesure de la performance. Au chapitre 2, je focalise sur un biais spécifique qui se crée lorsque les informations incertaines sont agrégées. Pour les budgets et plans, des entreprises doivent estimer les espérances des coûts et des durées des projets, car l'espérance est la seule mesure de tendance centrale qui est linéaire. A la différence de l'espérance, des mesures comme le mode ou la médiane ne peuvent pas être simplement additionnés. En considérant la forme spécifique de distributions des coûts et des durées, l'addition des modes ou des médianes résultera en une sous-estimation. Par le biais de deux expériences, je remarque que les participants tendent à estimer le mode au lieu de l'espérance résultant en une distorsion énorme de l'estimati¬on des coûts et des durées des projets. Je présente également une stratégie afin d'atténuer partiellement ce biais. Au chapitre 3, j'effectue une étude expérimentale pour comparer deux approches d'esti¬mation du temps qui sont utilisées en comptabilité analytique, spécifiquement « coûts basés sur les activités (ABC) traditionnelles » et « time driven ABC » (TD-ABC). Au contraire des affirmations soutenues par les défenseurs de l'approche TD-ABC, je constate que cette dernière n'est pas nécessairement appropriée pour les calculs de capacité. Par contre, je démontre que le TD-ABC est plus approprié pour les allocations de coûts que l'approche ABC traditionnelle. - It is essential for organizations to compress detailed sets of information into more comprehensi¬ve sets, thereby, establishing sharp data compression and good decision-making. In chapter 1, I review and structure the literature on information aggregation in management accounting research. I outline the cost-benefit trade-off that management accountants need to consider when they decide on the optimal levels of information aggregation. Beyond the fundamental information content perspective, organizations also have to account for cognitive and behavi¬oral perspectives. I elaborate on these aspects differentiating between research in cost accounti¬ng, budgeting and planning, and performance measurement. In chapter 2, I focus on a specific bias that arises when probabilistic information is aggregated. In budgeting and planning, for example, organizations need to estimate mean costs and durations of projects, as the mean is the only measure of central tendency that is linear. Different from the mean, measures such as the mode or median cannot simply be added up. Given the specific shape of cost and duration distributions, estimating mode or median values will result in underestimations of total project costs and durations. In two experiments, I find that participants tend to estimate mode values rather than mean values resulting in large distortions of estimates for total project costs and durations. I also provide a strategy that partly mitigates this bias. In the third chapter, I conduct an experimental study to compare two approaches to time estimation for cost accounting, i.e., traditional activity-based costing (ABC) and time-driven ABC (TD-ABC). Contrary to claims made by proponents of TD-ABC, I find that TD-ABC is not necessarily suitable for capacity computations. However, I also provide evidence that TD-ABC seems better suitable for cost allocations than traditional ABC.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document serves as the Iowa DOT's annual report as required by Iowa Code section 7A.9. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future funding levels of this federal funding is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended five times because a new authorization has not yet been enacted. The current extension expires December 31, 2010. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts and to be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. In developing the highway section of the program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. In fact, over $1.2 billion is programmed in FY2011 through FY2015 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant investments for interstate modernization on I-29 inSioux City, on I-29/80/480 in Council Bluffs, and on I-74 in Bettendorf/ Davenport. Another highway programming objective reflected in this Program is maintaining the scheduled completion of capacity and economic development projects that were identified in the previous Program. Finally, with the limited remaining funds the Commission has furthered the investment in capacity and economic development by adding a few projects to the Program. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system.
Resumo:
The Iowa Transportation Improvement Program (Program) is published to inform Iowans of planned investments in our state’s transportation system. The Iowa Transportation Commission (Commission) and Iowa Department of Transportation (Iowa DOT) are committed to programming those investments in a fiscally responsible manner. This document reflects Iowa’s multimodal transportation system by the inclusion of investments in aviation, transit, railroads, trails, and highways. A major component of this program is the highway section that documents programmed investments on the primary highway system for the next five years. A large part of funding available for highway programming comes from the federal government. Accurately estimating future federal funding levels is dependent on having a current enacted multi-year federal transportation authorization. The most recent authorization, Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU), expired September 30, 2009, and to date it has been extended seven times because a new authorization has not yet been enacted. The current extension will expire September 30, 2011. This leads to significant uncertainty in federal funding; however, it is becoming evident that, in Federal Fiscal Year 2012 and beyond, federal funding revenue will likely be reduced by 25 percent from current levels in order to match revenue that flows into the Highway Trust Fund. This Program reflects this anticipated reduction in federal funding. While Iowa law does not require the adoption of a Program when federal transportation funding is being reauthorized, the Commission believes it is important to adopt a Program in order to continue on-going planning and project development efforts so that Iowa will be well positioned when a new authorization is adopted. However, it is important to recognize that, absent a federal authorization bill, there is significant uncertainty in the forecast of federal revenues. The Commission and the Iowa DOT will continue to monitor federal revenues and will adjust future investments as needed to maintain a fiscally responsible Program. For 2012-2016, approximately $2.3 billion is forecast to be available for highway right of way and construction. In developing the highway section of the Program, the Commission’s primary investment objective remains stewardship (i.e. safety, maintenance and preservation) of Iowa’s existing highway system. Over $1.3 billion is programmed in FY2012 through FY2016 for preservation of Iowa’s existing highway system and for enhanced highway safety features. The highway section also includes significant interstate investments on I-29 in Sioux City, I-29/80/480 in Council Bluffs, and I-74 in Bettendorf/Davenport. The FY2016 programming for construction on I-74 in Bettendorf/Davenport is the first of several years of significant investments that will be monitored for available funding. Approximately $200 million of the investments on these three major urban interstate projects address preservation needs. In total, approximately $1.5 billion is programmed for highway preservation activities for 2012- 2016. Another highway programming objective is maintaining the scheduled completion of capacity and economic development projects. Projects that were previously scheduled to be completed within the previous Program continue on their current schedule. However, due to the reduction of projected federal revenues, the Commission has delayed by one year the initiation of construction of all multi-year non-Interstate capacity and economic development projects that cannot be completed within this Program. These projects are U.S. 20 in Woodbury County, U.S. 30 in Benton County, U.S. 61 in Louisa County, and Iowa 100 in Linn County. The Iowa DOT and Commission appreciate the public’s involvement in the state’s transportation planning process. Comments received personally, by letter or through participation in the Commission’s regular meetings or public input meetings held around the state each year, are invaluable in providing guidance for the future of Iowa’s transportation system. It should be noted that this document is a planning guide. It does not represent a binding commitment or obligation of the Commission or Iowa DOT, and is subject to change.
Resumo:
Partant de deux études de cas, le projet de Frente Ribeirinha à Porto (Portugal) et celui d'Euroméditerranée à Marseille, ce projet de thèse a pour objectif l'étude des modalités de valorisation du tissu bâti (patrimonialisation) par les acteurs institutionnels dans les projets de régénération urbaine. Suivant l'hypothèse de l'entrée dans un nouveau régime de patrimonialité, l'analyse doit expliciter les stratégies à l'oeuvre ainsi que la manière dont les autorités publiques influent sur les représentations de l'espace construit. Abordant la question des échelles d'intervention des projets de régénération urbaine à partir des deux études de cas, mais également de littératures sur des projets anglo-saxons, la thèse cherche à voir, au prisme de la construction patrimoniale, comment ces projets sont directement connectés à l'économie internationale et au phénomène de globalisation et s'ils prennent en compte l'échelle du quotidien et de la domesticité. Il s'agit de montrer les limites d'une valorisation du tissu bâti dans un objectif de retombées économiques (ville consommable) au détriment des valeurs d'usage et de signifiants du quotidien. D'où l'hypothèse de l'importance d'une prise en compte des représentations de valeurs aux différentes échelles (dimensions socio-culturelles du projet de régénération) pour un équilibre qualitatif dans la fabrication du territoire et des projets sur le long terme. La volonté est sensiblement la compréhension des nouvelles constructions patrimoniales ainsi que des pratiques de conception et de mise en oeuvre du projet urbain. - Based on two case studies, the Frente Ribeirinha project in Porto (Portugal) and Euroméditerranée in Marseille, this research project aims at studying the modes of enhancement of the built fabric by institutional actors in urban regeneration projects. Posing the idea of a new heritage regime, this analysis attempts to explain the different strategies at work and how public authorities influence the built space's representations. Looking at the different scales of intervention of regeneration projects in our two case studies, as well as Anglo-Saxon literature on projects, it seeks at seeing, through heritage processes, how these projects are directly connected to the international economy and the phenomenon of globalization. Also, it aims at investigating whether policies take into account the scale of everyday life and domesticity. It attempts to show the limit of a built fabric's valuation with economic benefits objectives (consumable city) rather than taking into account values and meanings of everyday life. Hence, the thesis suggests taking into account representations and values at different scales (socio-cultural dimensions of the regeneration project) for a qualitative balance in urban planning and urban projects' manufacturing. The aim is to broaden the understanding on heritage construction, on urban design practices and on implementation of urban projects.
Resumo:
1. Identifying the boundary of a species' niche from observational and environmental data is a common problem in ecology and conservation biology and a variety of techniques have been developed or applied to model niches and predict distributions. Here, we examine the performance of some pattern-recognition methods as ecological niche models (ENMs). Particularly, one-class pattern recognition is a flexible and seldom used methodology for modelling ecological niches and distributions from presence-only data. The development of one-class methods that perform comparably to two-class methods (for presence/absence data) would remove modelling decisions about sampling pseudo-absences or background data points when absence points are unavailable. 2. We studied nine methods for one-class classification and seven methods for two-class classification (five common to both), all primarily used in pattern recognition and therefore not common in species distribution and ecological niche modelling, across a set of 106 mountain plant species for which presence-absence data was available. We assessed accuracy using standard metrics and compared trade-offs in omission and commission errors between classification groups as well as effects of prevalence and spatial autocorrelation on accuracy. 3. One-class models fit to presence-only data were comparable to two-class models fit to presence-absence data when performance was evaluated with a measure weighting omission and commission errors equally. One-class models were superior for reducing omission errors (i.e. yielding higher sensitivity), and two-classes models were superior for reducing commission errors (i.e. yielding higher specificity). For these methods, spatial autocorrelation was only influential when prevalence was low. 4. These results differ from previous efforts to evaluate alternative modelling approaches to build ENM and are particularly noteworthy because data are from exhaustively sampled populations minimizing false absence records. Accurate, transferable models of species' ecological niches and distributions are needed to advance ecological research and are crucial for effective environmental planning and conservation; the pattern-recognition approaches studied here show good potential for future modelling studies. This study also provides an introduction to promising methods for ecological modelling inherited from the pattern-recognition discipline.
Resumo:
Iowa’s investment in the Chicago to Iowa City passenger rail service will produce more ongoing benefits than costs for Iowa residents and taxpayers over the next 30 years. An Iowa investment of $20.6 million will match a federal investment of $86.8 million for the capital costs of the Iowa segment of the Chicago to Iowa City service. Iowa’s share of the expected gap between revenues and operating and maintenance expense is estimated at $3 million annually. The economic analysis included in this document demonstrates the cost-effectiveness of the Iowa investments in the Chicago to Iowa City service and details the benefits that Iowa can expect from Iowa’s expenditures.
Resumo:
Long-Term Community Recovery Targeted Technical Assistance Strategy is an outcome of the coordinated effort of the city, Rebuild Iowa Office and Federal Emergency Management Agency Emergency Support Function. In partnership with City officials and RIO and informed by community outreach efforts, provided Targeted Technical Assistance to the community. This support helped the community identify and provide visibility to recovery issues, needs and opportunities that when addressed can result in a more effective long-term recovery for the community.
Resumo:
PURPOSE: We investigated the influence of beam modulation on treatment planning by comparing four available stereotactic radiosurgery (SRS) modalities: Gamma-Knife-Perfexion, Novalis-Tx Dynamic-Conformal-Arc (DCA) and Dynamic-Multileaf-Collimation-Intensity-Modulated-radiotherapy (DMLC-IMRT), and Cyberknife. MATERIAL AND METHODS: Patients with arteriovenous malformation (n = 10) or acoustic neuromas (n = 5) were planned with different treatment modalities. Paddick conformity index (CI), dose heterogeneity (DH), gradient index (GI) and beam-on time were used as dosimetric indices. RESULTS: Gamma-Knife-Perfexion can achieve high degree of conformity (CI = 0.77 ± 0.04) with limited low-doses (GI = 2.59 ± 0.10) surrounding the inhomogeneous dose distribution (D(H) = 0.84 ± 0.05) at the cost of treatment time (68.1 min ± 27.5). Novalis-Tx-DCA improved this inhomogeneity (D(H) = 0.30 ± 0.03) and treatment time (16.8 min ± 2.2) at the cost of conformity (CI = 0.66 ± 0.04) and Novalis-TX-DMLC-IMRT improved the DCA CI (CI = 0.68 ± 0.04) and inhomogeneity (D(H) = 0.18 ± 0.05) at the cost of low-doses (GI = 3.94 ± 0.92) and treatment time (21.7 min ± 3.4) (p<0.01). Cyberknife achieved comparable conformity (CI = 0.77 ± 0.06) at the cost of low-doses (GI = 3.48 ± 0.47) surrounding the homogeneous (D(H) = 0.22 ± 0.02) dose distribution and treatment time (28.4min±8.1) (p<0.01). CONCLUSIONS: Gamma-Knife-Perfexion will comply with all SRS constraints (high conformity while minimizing low-dose spread). Multiple focal entries (Gamma-Knife-Perfexion and Cyberknife) will achieve better conformity than High-Definition-MLC of Novalis-Tx at the cost of treatment time. Non-isocentric beams (Cyberknife) or IMRT-beams (Novalis-Tx-DMLC-IMRT) will spread more low-dose than multiple isocenters (Gamma-Knife-Perfexion) or dynamic arcs (Novalis-Tx-DCA). Inverse planning and modulated fluences (Novalis-Tx-DMLC-IMRT and CyberKnife) will deliver the most homogeneous treatment. Furthermore, Linac-based systems (Novalis and Cyberknife) can perform image verification at the time of treatment delivery.
Resumo:
The Chicago to Iowa City Intercity Passenger Rail Program (Program) is a joint undertaking of the Iowa Department of Transportation (Iowa DOT) and the Illinois Department of Transportation (Illinois DOT). The purpose of the Program is to reestablish passenger rail services from Chicago to Iowa City, independently and in concert with the MWRRI (Midwest Regional Rail Initiative). The Chicago to Iowa City Corridor is one part of the vision established by the MWRRI to expand existing and develop new regional passenger rail service to meet existing and future travel demands in the Midwest. This project will expand and create a rail transportation alternative to supplant private automobile, bus, and air travel between Chicago and Iowa City, and intermediate points, and to create new transportation opportunity and capability for people who cannot meet their transportation needs with private automobile, bus and air modes.
Resumo:
This research project combined various datasets, existing and created for this project, into an Interactive Mapping Service (IMS) for use by Iowa DOT personnel, county planning and zoning departments and the public in order to make more informed decisions regarding aggregate sources and future access to them. Iowa DOT Technical Advisory Committee meetings were held, along with public forum presentations, in order to understand better the social, ecological and economic limitations to extracting aggregate. The information needed by potential users was conveyed and integrated into a single informational source, the Aggregate Planning IMS.