840 resultados para research projects
Resumo:
Despite recent medical progresses in patient support, the mortality of sepsis remains high. Recently, new supporting strategies were proposed to improve outcome. Whereas such strategies are currently considered as standard of care, their real impact on mortality, morbidity, length of stay, and hence, health care resources utilization has been only weakly evaluated so far. Obviously, there is a critical need for epidemiologic surveys of sepsis to better address these major issues. The Lausanne Cohort of septic patients aims at building a large clinical, biological and microbiological database that will be used as a multidisciplinary research platform to study the various pathogenic mechanisms of sepsis in collaboration with the various specialists. This could be an opportunity to strengthen the collaboration within the Swiss Latin network of Intensive Care Medicine.
Resumo:
The Iowa Department of Transportation (Iowa DOT) currently performs wetland mitigation on a project-by-project basis. At the same time, other agencies like the Iowa Department of Natural Resources and Natural Resource Conservation Service are performing wetland restoration projects, and counties and cities may be mitigating wetland losses as well. This project examined the feasibility of developing cooperative wetland mitigation projects in order to utilize state and local resources more efficiently to benefit both Iowa and local communities. The project accomplished the following objectives: (1) Identified and characterized cooperative wetland mitigation programs nationwide; (2) Developed a needs assessment through a survey of state, county, and large city agencies in Iowa to describe wetland mitigation programs and determine challenges with mitigation and program improvements, including long-term risks associated with maintenance and monitoring programs; (3) Surveyed state, county, and city agencies and organizations to identify resources available for developing cooperative mitigation projects and procedures; (4) Developed a conceptual framework for cooperative wetland mitigation.
Resumo:
Highway Research Project HR-392 was undertaken to evaluate cold in-place asphalt recycled (CIR) projects in the State of Iowa. The research involved assessment of performance levels, investigation of factors that most influence pavement performance and economy, and development of guidelines for CIR project selection. The performance was evaluated in two ways: Pavement Condition Indices (PCI, U.S. Corps of Engineers) were calculated and overall ratings were given on ride and appearance. A regression analysis was extrapolated to predict the future service life of CIR roads. The results were that CIR roads within the State of Iowa, with less than 2000 annual average daily traffic (AADT), have an average predicted service life of fifteen to twenty-six years. Subgrade stability problems can prevent a CIR project from being successfully constructed. A series of Dynamic Cone Penetrometer (DCP) tests were conducted on a CIR project that experienced varying levels of subgrade failure during construction. Based on this case study, and supporting data, it was determined that the DCP test can be used to evaluate subgrades that have insufficient stability for recycling. Overall, CIR roads in Iowa are performing well. It appears that the development of transverse cracking has been retarded and little rutting has occurred. Contracting agencies must pay special attention to the subgrade conditions during project selection. Because of its performance, CIR is a recommended method to be considered for rehabilitating aged low volume (<2000 AADT) asphalt concrete roads in Iowa.
Resumo:
Discarded tires present major disposal and environmental problems. One method of recycling tires is to use finely ground rubber from tires in asphalt cement concrete (ACC). This process has been researched in Iowa since 1991. There are currently eight projects being researched. This project involved using crumb rubber modifier (CRM) in ACC using a dry process. This project is located on US 63 in Howard County. It involved 17 test sections. There were five test sections using 20 lb of CRM per ton, four test sections using 10 lb of CRM per ton and eight test sections using a conventional mix. Not only were different mixes used, but the overlay was also placed in various thicknesses ranging from 2 in. to 8 in. (5 cm to 20 cm). The project was completed in August 1994. The project construction went well with only minor problems. This report contains information about procedures and tests that were completed and those that will be completed. Evaluation on the project will continue for five years.
Resumo:
The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.
Resumo:
This report, entitled Iowa Highway Research and Development Activities FY2014 is submitted in compliance with Iowa Code sections 310.36 and 312.3A, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in process on June 20, 2014. It is also a report on projects completed during the fiscal year beginning July 1, 2013 and ending June 30, 2014. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at: http://www.iowadot.gov/research/pdf/IHRBAnnualReport.pdf.
Resumo:
With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC example that utilized connection details that had been utilized elsewhere. The connection details used between the drilled shaft and pier column and between the pier column and the pier cap were details needing evaluation. These connection details utilized grouted couplers that have been tested by others with mixed results—some indicating quality performance and others indicating questionable performance. There was a need to test these couplers to gain an understanding of their performance in likely Iowa details and to understand how their performance might be impacted by different construction processes. The objective of the work was to perform laboratory testing and evaluation of the grouted coupler connection details utilized on precast concrete elements for the Keg Creek Bridge. The Bridge Engineering Center (BEC), with the assistance of the Iowa Department of Transportation (DOT) Office of Bridges and Structures, developed specimens representative of the Keg Creek Bridge connections for testing under static and fatigue loads in the structures laboratory. The specimens were also evaluated for their ability to resist the intrusion of water and chlorides. Evaluation of their performance was made through comparisons with design assumptions and previous research, as well as the physical performance of the coupled connections.
Resumo:
This report, entitled Iowa Highway Research and Development Activities FY 2015, is submitted in compliance with Iowa Code section 310.36 and 312.3A, which direct the submission of a report of the Secondary Road Research Fund and the Street Research Fund, respectively. It is a report of the status of research and development projects in process on June 30, 2015. It is also a report on projects completed during the fiscal year beginning July 1, 2014 and ending June 30, 2015. Detailed information on each of the research and development projects mentioned in this report is available from the office of Research and Analytics, Performance and Technology Division, Iowa Department of Transportation. All approved reports are also online for viewing at http://www.iowadot.gov/research/pdf/IHRBAnnualReport.pdf.
Resumo:
This report proposes, that for certain types of highway construction projects undertaken by the Iowa Department of Transportation, a scheduling technique commonly referred to as linear scheduling may be more effective than the Critical Path Method scheduling technique that is currently being used. The types of projects that appear to be good candidates for the technique are those projects that have a strong linear orientation. Like a bar chart, this technique shows when an activity is scheduled to occur and like a CPM schedule it shows the sequence in which activities are expected to occur. During the 1992 construction season, the authors worked with an inlay project on Interstate 29 to demonstrate the linear scheduling technique to the Construction Office. The as-planned schedule was developed from the CPM schedule that the contractor had developed for the project. Therefore, this schedule represents what a linear representation of a CPM schedule would look like, and not necessarily what a true linear schedule would look like if it had been the only scheduling technique applied to the project. There is a need to expand the current repertoire of scheduling techniques to address those projects for which the bar chart and CPM may not be appropriate either because of the lack of control information or due to overly complex process for the actual project characteristics. The scheduling approaches used today on transportation projects have many shortcomings for properly modeling the real world constraints and conditions which are encountered. Linear project's predilection for activities with variable production rates, a concept very difficult to handle with the CPM, is easily handled and visualized with the linear technique. It is recommended that work proceed with the refinement of the method of linear scheduling described above and the development of a microcomputer based system for use by the Iowa Department of Transportation and contractors for its implementation. The system will be designed to provide the information needed to adjust schedules in a rational understandable method for monitoring progress on the projects and alerting Iowa Department of Transportation personnel when the contractor is deviating from the plan.
Resumo:
This is the fourth edition of the Nanosafety Cluster compendium. It documents the status of important projects on nanomaterial toxicity and exposure monitoring, integrated risk management, research infrastructure and coordination and support activities. The compendium is not intended to be a guidance document for human health and environmental safety management of nanotechnologies, as such guidance documents already exist and are widely available. Neither is the compendium intended to be a medium for the publication of scientific papers and research results, as this task is covered by scientific conferences and the peer reviewed press. The compendium aims to bring researchers closer together and show them the potential for synergy in their work. It is a means to establish links and communication between them during the actual research phase and well before the publication of their results. It thus focuses on the communication of projects' strategic aims, extensively covers specific work objectives and the methods used in research, and documents human capacities and available laboratory infrastructure. As such, the compendium supports collaboration on common goals and the joint elaboration of future plans, whilst compromising neither the potential for scientific publication, nor intellectual property rights.
Resumo:
Peer-reviewed
Resumo:
Quality management has become a strategic issue for organisations and is very valuable to produce quality software. However, quality management systems (QMS) are not easy to implement and maintain. The authors' experience shows the benefits of developing a QMS by first formalising it using semantic web ontologies and then putting them into practice through a semantic wiki. The QMS ontology that has been developed captures the core concepts of a traditional QMS and combines them with concepts coming from the MPIu'a development process model, which is geared towards obtaining usable and accessible software products. Then, the ontology semantics is directly put into play by a semantics-aware tool, the Semantic MediaWiki. The developed QMS tool is being used for 2 years by the GRIHO research group, where it has manages almost 50 software development projects taking into account the quality management issues. It has also been externally audited by a quality certification organisation. Its users are very satisfied with their daily work with the tool, which manages all the documents created during project development and also allows them to collaborate, thanks to the wiki features.
Resumo:
The question of Pilot Project creation, due to support pre-development stage of software product elaboration, nowadays might be used as an approach, which allows improving the whole scheme of information technology project running. This subject is not new, but till now no model has been presented, which gives deep description of this important stage on the early phase of project. This Master's Thesis represents the research's results and findings concerning the pre-development study from the Software Engineering point of view. The aspects of feasibility study, pilot prototype developments are analyzed in this paper. As the result, the technique of Pilot Project is formulated and scheme has been presented. The experimental part is focused on particular area Pilot Project scheme's implementation- Internationally Distributed Software projects. The specific characteristic, aspects, obstacles, advantages and disadvantages are considered on the example of cross border region of Russia and Finland. The real case of Pilot Project technique implementation is given.
Resumo:
The size and complexity of projects in the software development are growing very fast. At the same time, the proportion of successful projects is still quite low according to the previous research. Although almost every project's team knows main areas of responsibility which would help to finish project on time and on budget, this knowledge is rarely used in practice. So it is important to evaluate the success of existing software development projects and to suggest a method for evaluating success chances which can be used in the software development projects. The main aim of this study is to evaluate the success of projects in the selected geographical region (Russia-Ukraine-Belarus). The second aim is to compare existing models of success prediction and to determine their strengths and weaknesses. Research was done as an empirical study. A survey with structured forms and theme-based interviews were used as the data collection methods. The information gathering was done in two stages. At the first stage, project manager or someone with similar responsibilities answered the questions over Internet. At the second stage, the participant was interviewed; his or her answers were discussed and refined. It made possible to get accurate information about each project and to avoid errors. It was found out that there are many problems in the software development projects. These problems are widely known and were discussed in literature many times. The research showed that most of the projects have problems with schedule, requirements, architecture, quality, and budget. Comparison of two models of success prediction presented that The Standish Group overestimates problems in project. At the same time, McConnell's model can help to identify problems in time and avoid troubles in future. A framework for evaluating success chances in distributed projects was suggested. The framework is similar to The Standish Group model but it was customized for distributed projects.
Resumo:
This thesis focuses on integration in project business, i.e. how projectbased companies organize their product and process structures when they deliver industrial solutions to their customers. The customers that invest in these solutions run their businesses in different geographical, political and economical environments, which should be acknowledged by the supplier when providing solutions comprising of larger and more complex scopes than previously supplied to these customers. This means that the suppliers are increasing their supply range by taking over some of the activities in the value chain that have traditionally been handled by the customer. In order to be able to provide the functioning solutions, including more engineering hours, technical equipment and a wider project network, a change is needed in the mindset in order to be able to carry out and take the required responsibility that these new approaches bring. For the supplier it is important to be able to integrate technical products, systems and services, but the supplier also needs to have the capabilities to integrate the cross-functional organizations and departments in the project network, the knowledge and information between and within these organizations and departments, along with inputs from the customer into the product and process structures during the lifecycle of the project under development. Hence, the main objective of this thesis is to explore the challenges of integration that industrial projects meet, and based on that, to suggest a concept of how to manage integration in project business by making use of integration mechanisms. Integration is considered the essential process for accomplishing an industrial project, whereas the accomplishment of the industrial project is considered to be the result of the integration. The thesis consists of an extended summary and four papers, that are based on three studies in which integration mechanisms for value creation in industrial project networks and the management of integration in project business have been explored. The research is based on an inductive approach where in particular the design, commissioning and operations functions of industrial projects have been studied, addressing entire project life-cycles. The studies have been conducted in the shipbuilding and power generation industries where the scopes of supply consist of stand-alone equipment, equipment and engineering, and turnkey solutions. These industrial solutions include demanding efforts in engineering and organization. Addressing the calls for more studies on the evolving value chains of integrated solutions, mechanisms for inter- and intra-organizational integration and subsequent value creation in project networks have been explored. The research results in thirteen integration mechanisms and a typology for integration is proposed. Managing integration consists of integrating the project network (the supplier and the sub-suppliers) and the customer (the customer’s business purpose, operations environment and the end-user) into the project by making use of integration mechanisms. The findings bring new insight into research on industrial project business by proposing integration of technology and engineering related elements with elements related to customer oriented business performance in contemporary project environments. Thirteen mechanisms for combining products and the processes needed to deliver projects are described and categorized according to the impact that they have on the management of knowledge and information. These mechanisms directly relate to the performance of the supplier, and consequently to the functioning of the solution that the project provides. This thesis offers ways to promote integration of knowledge and information during the lifecycle of industrial projects, enhancing the development towards innovative solutions in project business.