878 resultados para research management
Resumo:
National Housing Relics and Scenic Sites (NHRSSs) in China are the equivalent of National Parks in the West but have contrasting features and broader roles when compared to their Western counterparts. By reviewing and analysing more than 370 academic sources, this paper identifies 6 major issue clusters and future challenges that will influence the management of NHRSSs over time. It also provides a number of cases to illustrate the particular features of NHRSSs. Identifying the hot issues and important challenges in Chinese NHRSSs will provide valuable insights into priorities now being discussed in highly populated areas of the World.
Resumo:
This paper seeks to explore how organisations can effectively use performance management systems (PMS) to monitor collective identities. The monitoring of relationships between identity and an influential PMS—the balanced scorecard (BSC)—are explored. Drawing from identity and management accounting literature, this paper argues that identity products, patternings and processes are commonly positioned, monitored and interpreted through the multiple perspectives and levels of the BSC. Specifically, human, technical and organisational capital under the Learning and Growth perspective of the BSC can incorporate various identity measures that sustain the relative, distinctive and fluid nature of identities. The value of this research is to strengthen the theoretical grounds which position identity as an important dimension of organisational capital in PMS.
Resumo:
In my last Column this year, I want to draw your attention to some current efforts in the space of BPM research and education that try to move BPM thinking forward into new areas of application. I am subsuming these efforts under the notion of x-aware BPM.
Resumo:
This paper brings together the research on temporary organizational forms. Despite a recent surge in publications on this topic, there have been few attempts to integrate knowledge on what we know of such temporary forms of organization. In order to correct this, an integrative framework is proposed around four central themes: time, team, task and context. Within each of these themes, the paper offers an overview of the literature, the gaps in what we know, and what future directions might be taken by scholars hoping to contribute to this important and rapidly growing field.
Supply chain sustainability : a relationship management approach moderated by culture and commitment
Resumo:
This paper explores the nature of relationship management on construction projects in Australia and examines the effects of culture, by means of Schwarz’s value survey, on relationships under different contract strategies. The research was based on the view that the development of a sustainable supply chain depends on the transfer of knowledge and capabilities from the larger players in the supply chain through collaboration brought about by relationship management. The research adopted a triangulated approach in which quantitative data were collected by questionnaire, interviews were conducted to explore and enrich the quantitative data and case studies were undertaken in order to illustrate and validate the fi ndings. The aim was to investigate how values and attitudes enhance or reduce the incorporation of the supply chain into the project. From the research it was found that the degree of match and mismatch between values and contract strategy impacts commitment and the engagement and empowerment of the supply chain.
Resumo:
Safety culture is a concept that has long been accepted in high risk industries such as aviation, nuclear industries and mining, however, considerable research is now being undertaken within the construction sector, with varying levels of success. The current paper discusses three recent interlocked projects that have had some success in the Australian construction industry. The first project examined the development and implementation of a safety competency framework targeted at safety critical positions across first tier construction organisations. Combining qualitative and quantitative methods, the project: developed a matrix of safety critical positions (n=11) and safety managements tasks (SMTs; n=39); mapped the process steps for their acquisition and ongoing development; detailed the knowledge, skills and behaviours required for all SMTs; and outlined organisational cultural outcomes that could be anticipated in a successful implementation of the framework. The second project extended research on safety competency and leadership to develop behavioural guidelines for leaders to drive safety culture change down to second tier companies. This was designed to assist smaller construction companies to customise their own competency framework and develop implementation guidelines that match their aspirations and resources. The third interlocked project explored the use of safety effectiveness indicators (SEIs) as an industry-relevant assessment tool for reducing risk on construction sites. With direct linkages to safety competencies and safety management tasks, the SEIs are the next step towards an integrated safety cultural approach to safety and extend the concept of positive performance indicators (PPIs) by providing a valid, reliable, and user friendly measurement platform. Taken together, the results of the interlocked projects suggest that safety culture research has many potential benefits for the construction industry, particularly when research is conducted in partnership with industry stakeholders. Suggestions are made for future research, including further application and testing of the safety competency framework and aligning SEIs across construction projects of varying size, location and design.
Resumo:
The narrative section of annual reports has considerable value to its user groups, such as financial analysts and investors (Tiexiera, 2004; Barlett and Chandler, 1997, IASB, 2006). This narrative section including chairpersons’/presidents’ statement contains twice the quantity of information than the financial statements section (Smith and Taffler, 2000). However, the abundance of information does not necessarily enhance the quality of such information (IASB, 2006). This issue of qualitative characteristics has been long foregone by researchers. This issue has attracted the attention of IASB (2006). Following the dearth in research in regard to qualitative characteristics of reporting this paper explores whether investors’ required qualitative characteristics as outlined by the IASB (2006) have been satisfied in management commentary section of New Zealand companies’ annual reports. Our result suggests that the principal stakeholders’, that is, investors’ qualitative characteristics requirements have been partially met in this section of annual reports. The qualitative characteristic of ‘relevance’ and ‘supportability’ have been satisfied in more annual reports compared to that of ‘balance’ and ‘comparability.’
Resumo:
This paper is concerned with investigating existing and potential scope of Dublin Core metadata in Knowledge Management contexts. Modelling knowledge is identified as a conceptual prerequisite in this investigation, principally for the purpose of clarifying scope prior to identifying the range of tasks associated with organising knowledge. A variety of models is presented and relationships between data, information, and knowledge discussed. It is argued that the two most common modes of organisation, hierarchies and networks, influence the effectiveness and flow of knowledge. Practical perspective is provided by reference to implementations and projects providing evidence of how DC metadata is applied in such contexts. A sense-making model is introduced that can be used as a shorthand reference for identifying useful facets of knowledge that might be described using metadata. Discussion is aimed at presenting this model in a way that both validates current applications and points to potential novel applications.
Resumo:
There is an intimate interconnectivity between policy guidelines defining reform and the delineation of what research methods would be subsequently applied to determine reform success. Research is guided as much by the metaphors describing it as by the ensuing empirical definition of actions of results obtained from it. In a call for different reform policy metaphors Lumby and English (2010) note, “The primary responsibility for the parlous state of education... lies with the policy makers that have racked our schools with reductive and dehumanizing processes, following the metaphors of market efficiency, and leadership models based on accounting and the characteristics of machine bureaucracy” (p. 127)
Resumo:
The lack of satisfactory consensus for characterizing the system intelligence and structured analytical decision models has inhibited the developers and practitioners to understand and configure optimum intelligent building systems in a fully informed manner. So far, little research has been conducted in this aspect. This research is designed to identify the key intelligent indicators, and develop analytical models for computing the system intelligence score of smart building system in the intelligent building. The integrated building management system (IBMS) was used as an illustrative example to present a framework. The models presented in this study applied the system intelligence theory, and the conceptual analytical framework. A total of 16 key intelligent indicators were first identified from a general survey. Then, two multi-criteria decision making (MCDM) approaches, the analytic hierarchy process (AHP) and analytic network process (ANP), were employed to develop the system intelligence analytical models. Top intelligence indicators of IBMS include: self-diagnostic of operation deviations; adaptive limiting control algorithm; and, year-round time schedule performance. The developed conceptual framework was then transformed to the practical model. The effectiveness of the practical model was evaluated by means of expert validation. The main contribution of this research is to promote understanding of the intelligent indicators, and to set the foundation for a systemic framework that provide developers and building stakeholders a consolidated inclusive tool for the system intelligence evaluation of the proposed components design configurations.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.
Resumo:
This paper presents a strategy for delayed research method selection in a qualitative interpretivist research. An exemplary case details how explorative interviews were designed and conducted in accordance with a paradigm prior to deciding whether to adopt grounded theory or phenomenology for data analysis. The focus here is to determine the most appropriate research strategy in this case the methodological framing to conduct research and represent findings, both of which are detailed. Research addressing current management issues requires both a flexible framework and the capability to consider the research problem from various angles, to derive tangible results for academia with immediate application to business demands. Researchers, and in particular novices, often struggle to decide on an appropriate research method suitable to address their research problem. This often applies to interpretative qualitative research where it is not always immediately clear which is the most appropriate method to use, as the research objectives shift and crystallize over time. This paper uses an exemplary case to reveal how the strategy for delayed research method selection contributes to deciding whether to adopt grounded theory or phenomenology in the initial phase of a PhD research project. In this case, semi-structured interviews were used for data generation framed in an interpretivist approach, situated in a business context. Research questions for this study were thoroughly defined and carefully framed in accordance with the research paradigm‟s principles, while at the same time ensuring that the requirements of both potential research methods were met. The grounded theory and phenomenology methods were compared and contrasted to determine their suitability and whether they meet the research objectives based on a pilot study. The strategy proposed in this paper is an alternative to the more „traditional‟ approach, which initially selects the methodological formulation, followed by data generation. In conclusion, the suggested strategy for delayed research method selection intends to help researchers identify and apply the most appropriate method to their research. This strategy is based on explorations of data generation and analysis in order to derive faithful results from the data generated.
Resumo:
In this paper, we describe the main processes and operations in mining industries and present a comprehensive survey of operations research methodologies that have been applied over the last several decades. The literature review is classified into four main categories: mine design; mine production; mine transportation; and mine evaluation. Mining design models are further separated according to two main mining methods: open-pit and underground. Moreover, mine production models are subcategorised into two groups: ore mining and coal mining. Mine transportation models are further partitioned in accordance with fleet management, truck haulage and train scheduling. Mine evaluation models are further subdivided into four clusters in terms of mining method selection, quality control, financial risks and environmental protection. The main characteristics of four Australian commercial mining software are addressed and compared. This paper bridges the gaps in the literature and motivates researchers to develop more applicable, realistic and comprehensive operations research models and solution techniques that are directly linked with mining industries.
Resumo:
A hospital consists of a number of wards, units and departments that provide a variety of medical services and interact on a day-to-day basis. Nearly every department within a hospital schedules patients for the operating theatre (OT) and most wards receive patients from the OT following post-operative recovery. Because of the interrelationships between units, disruptions and cancellations within the OT can have a flow-on effect to the rest of the hospital. This often results in dissatisfied patients, nurses and doctors, escalating waiting lists, inefficient resource usage and undesirable waiting times. The objective of this study is to use Operational Research methodologies to enhance the performance of the operating theatre by improving elective patient planning using robust scheduling and improving the overall responsiveness to emergency patients by solving the disruption management and rescheduling problem. OT scheduling considers two types of patients: elective and emergency. Elective patients are selected from a waiting list and scheduled in advance based on resource availability and a set of objectives. This type of scheduling is referred to as ‘offline scheduling’. Disruptions to this schedule can occur for various reasons including variations in length of treatment, equipment restrictions or breakdown, unforeseen delays and the arrival of emergency patients, which may compete for resources. Emergency patients consist of acute patients requiring surgical intervention or in-patients whose conditions have deteriorated. These may or may not be urgent and are triaged accordingly. Most hospitals reserve theatres for emergency cases, but when these or other resources are unavailable, disruptions to the elective schedule result, such as delays in surgery start time, elective surgery cancellations or transfers to another institution. Scheduling of emergency patients and the handling of schedule disruptions is an ‘online’ process typically handled by OT staff. This means that decisions are made ‘on the spot’ in a ‘real-time’ environment. There are three key stages to this study: (1) Analyse the performance of the operating theatre department using simulation. Simulation is used as a decision support tool and involves changing system parameters and elective scheduling policies and observing the effect on the system’s performance measures; (2) Improve viability of elective schedules making offline schedules more robust to differences between expected treatment times and actual treatment times, using robust scheduling techniques. This will improve the access to care and the responsiveness to emergency patients; (3) Address the disruption management and rescheduling problem (which incorporates emergency arrivals) using innovative robust reactive scheduling techniques. The robust schedule will form the baseline schedule for the online robust reactive scheduling model.