1000 resultados para Troca gasosa pulmonar


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Fisiopatologia em Clínica Médica - FMB

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq)

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The current competitive market requires companies to adapt so that they can meet the needs of customers in an agile manner and aimed at the lowest possible cost in their manufacture, be it a product or service. The Toyota Production System is aimed at higher profits through lean manufacturing practices with reduced spending, smaller lots and inventories, generated by market demand. The variety of products makes the setup of the equipment a critical point and it should be reduced as much as possible so it does not affect productivity. The rapid exchange of tools allows with few actions and a modification that time does not exceed one digit on your total time. In this study, a case study showed that only with standardization and use of cheap improvements made it possible to reduce setup time in bottle labeling machine by 98 minutes for a final time of approximately 10 minutes with little investment, demonstrating the feasibility the displayed and a monthly gain tool in bottles at approximately 120,000, generating a performance gain and budget of approximately R$ 94,000.00 per month

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Fisiopatologia em Clínica Médica - FMB

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The current competitive market requires companies to adapt so that they can meet the needs of customers in an agile manner and aimed at the lowest possible cost in their manufacture, be it a product or service. The Toyota Production System is aimed at higher profits through lean manufacturing practices with reduced spending, smaller lots and inventories, generated by market demand. The variety of products makes the setup of the equipment a critical point and it should be reduced as much as possible so it does not affect productivity. The rapid exchange of tools allows with few actions and a modification that time does not exceed one digit on your total time. In this study, a case study showed that only with standardization and use of cheap improvements made it possible to reduce setup time in bottle labeling machine by 98 minutes for a final time of approximately 10 minutes with little investment, demonstrating the feasibility the displayed and a monthly gain tool in bottles at approximately 120,000, generating a performance gain and budget of approximately R$ 94,000.00 per month

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Pós-graduação em Fisiopatologia em Clínica Médica - FMB

Relevância:

20.00% 20.00%

Publicador:

Resumo:

DEVELOPMENT AND EVALUATION OF GAS DIFFUSION ELECTRODES (GDE) FOR GENERATION OF H2O2 IN SITU AND THEIR APPLICATION IN THE DEGRADATION OF REACTIVE BLUE 19 DYE. This work reports the development of GDE for electrogeneration of H2O2 and their application in the degradation process of Reactive Blue 19 dye. GDE produced by carbon black with 20% polytetrafluoroethylene generated up to 500 mg L-1 of H2O2 through the electrolysis of acidic medium at -0.8 V vs Ag/AgCl. Reactive Blue 19 dye was degraded most efficiently with H2O2 electrogenerated in the presence of Fe(II) ions, leading to removal of 95% of the original color and 39% of TOC at -0.8 V vs Ag/AgCl.