952 resultados para Priority queues


Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have undertaken a highly effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in targeted sub-watersheds as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs for 4,000 acres that will reduce the annual delivery of sediment by 6,000 tons and phosphorus by 20,000 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Miller Creek, a 19,926 acre watershed, is listed on the 2008 Section 303d Impaired Waters List. All indicators, as reported in the Miller Creek assessment, show that the impairment is due to nutrient and sediment delivery from upland runoff which contributes to elevated water temperatures, excessive algae, and low dissolved oxygen levels within the stream. The WIRB board provided implementation grant funds in 2010 for a three year project to treat targeted areas of 5 tons per acre or greater soil loss with an estimated reduction of 2,547 tons. As of December 1, 2012, with 95% of the funds allocated, the final results are estimated to provide a sediment delivery reduction of 4,500 tons and an estimated phosphorus reduction of 5,700 lbs per year. These accomplishments and the completion of the three year Miller Creek WIRB project represent "Phase I" of the SWCD's goals to treat the Miller Creek watershed. This application represents "Phase II" or the final phase of the Miller Creek water quality project. The Monroe SWCD plans to reduce sediment delivery by 70% on an additional 245 acres of priority land. This goal will be accomplished through installation of strategically placed structural practices, BMPs, and grazing systems. These practices will reduce soil loss, nutrient runoff, and sediment delivery as well as improve water quality and wildlife habitat in the watershed. Utilization of partnerships with NRCS and IDALS-DSC will continue to be an important part to the success of the project. Project goals will be achieved by utilizing matching funds from EQIP, and the Monroe SWCD has approved the use of District IFIP cost share funds specifically for use in the Miller Creek Watershed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Iowa Department of Transportation (DOT) has made improving work zone (WZ) safety a high priority. Managing vehicle speeds through work zones is perceived to be an important factor in achieving this goal. A number of speed reduction techniques are currently used by transportation agencies throughout the country to control speeds and reduce speed variation at work zones. The purpose of this project is to study these and other applicable work zone speed reduction strategies. Furthermore, this research explores transportation agencies' policies regarding managing speeds in long-term, short-term, and moving work zones. This report consists of three chapters. The first chapter, a literature review, examines the current speed reduction practices at work zones and provides a review of the relevant literature. The speed control strategies reviewed in this chapter range from posting regulatory and advisory speed limit signs to using the latest radar technologies to reduce speeds at work zones. The second chapter includes a short write-up for each identified speed control technique. The write-up includes a description, the results of any field tests, the benefits and the costs of the technology or technique. To learn more about other state policies regarding work zone speed reduction and management, the Center for Transportation Research and Education conducted a survey. The survey consists of six multipart questions. The third chapter provides summaries of the response to each question.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Competine Creek watershed is a 24,956 acre sub-watershed of Cedar Creek. The creek traverses portions of three counties, slicing through rich and highly productive Southern lowa Drift Plain soils. The watershed is suffering from excessive sediment delivery and frequent flash floods that have been exacerbated by recent high rainfall events. Assessment data reveals soil erosion estimated to be 38,435 tons/year and sediment delivery to the creek at 15,847 tons/year. The Competine Creek Partnership Project is seeking WIRB funds to merge with IDALS-DSC funds and local funds, all targeted for structural Best Management Practices (BMPs) within the 2,760 acres of High Priority Areas (HPAs) identified by the assessment process. The BMPs will include grade stabilization structures, water and sediment basins, tile-outlet terraces, CRP, and urban storm water conservation practices. In addition, Iowa State University Extension-Iowa Learning Farm is investing in the project by facilitating a crop sampling program utilizing fall stalk nitrate, phosphorous index, and soil conditioning index testing. These tests will be used by producers as measures of performance to refine nutrient and soil loss management and to determine effective alternatives to reduce sediment and nutrient delivery to Competine Creek.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This letter has been prepared as a consultation to evaluate human health impacts from residual contamination left from the former operation of a salvage yard on this property that is planned to be utilized by the North Iowa Humane Society located in Fort Dodge, Iowa. The Iowa Department of Public Health’s priority is to ensure the Fort Dodge community has the best information possible to safeguard its health. That information is included in following paragraphs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This letter has been prepared as a consultation to evaluate human health impacts from residue contamination left from the operation of a bulk plant located in Olin, Iowa. The Iowa Department of Public Health’s priority is to ensure the Olin community has the best information possible to safeguard its health. That information is included in following paragraphs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This letter has been prepared as a consultation to evaluate human health impacts from runoff from a farm field adjacent to your property in the Prairie Vista Development of Altoona, Iowa. We understand your concern, and want you to know that the Iowa Department of Public Health’s priority is to ensure that you have the best information possible to safeguard your health and the health of your family. That information is included in following paragraphs.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Competine Creek is an 8,653 acre subwatershed of Whitebreast Creek which drains directly to Lake Red Rock. The Marion Soil and Water Conservation District has prioritized water quality protection efforts within Competine Creek subwatershed because 1) this watershed has been identified as a significant contributor of sediment, nutrients, and bacteria to Competine Creek and Lake Red Rock, 2) the watershed provides unique outreach opportunities due to its unique rural and urban interface, and 3) by using a targeted approach to address water quality, the likelihood of successfully demonstrating water quality improvements is high due to its manageable size. The specific goals of this proposal to WIRB (Phase I) are to: 1) reduce sediment and nutrient delivery by 1787 tons and 2144 lbs by installing conservation practices on high priority agricultural land; and 2) install urban conservation practices that reduce the volume of peak flow, improve streambank stability, and promote infiltration of stormwater runoff before it enters Competine Creek. The Marion SWCD has assembled a unique group of partners and secured funding from multiple sources to implement this project.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have implemented a uniquely effective approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in four targeted sub-watersheds as part of the Rathbun Lake Special Project. Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on 5,100 acres that will reduce the annual delivery of sediment by 8,130 tons and phosphorus by 35,980 pounds; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Mills County proposes to reduce the identified impairment of the watershed, Keg Creek, by eliminating one of the main reasons for the impairment - non-conforming, on-site septic tanks that allow effluent to drain into the creek from the unincorporated community of Mineola. This has been identified by the county as a major priority. Therefore, the county proposes to construct a collection system and lagoon treatment facility, which would eliminate effluent from draining into Keg Creek. Regional Water will own, operate, and manage the collection and treatment systems in Mineola for Mills County.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Two sections of the Yellow River have been named to the State of Iowa’s 303d list of impaired waters. The listing reflects streams with pollution problems linked to habitat alterations, in addition to those with potential disease causing bacteria, viruses and parasites. This fact, combined with local knowledge of water quality problems, shows the need for land treatment practices and habitat improvement measures. This project would target the Yellow River watershed, which totals approximately 49,800 acres. Areas that drain directly into the Yellow River mainstream will be targeted. Individually, these areas are too small to be considered sub-watersheds. This project will assess the drainage areas for active gullies and prioritize grade stabilization structures based upon severity and impact on the fishery. Funding would be utilized to target high priority grade stabilization structure sites and provide cost-share for those projects. A prerequisite for cost-share allocation is 75% of the land contributing to the drainage area must have some form of treatment in place. The Allamakee SWCD has received an EPA Region 7 Grant toward grade stabilization structures in the same area. Landowners have indicated that 75% cost-share is necessary to implement practices. To meet this request, the EPA funding would be used at a 15% cost-share rate if matched with 60% cost-share from WIRB funding. If matched with Federal EQIP funds, 25% of funds obtained from WIRB would be used. If other funds were depleted, WIRB funds would be utilized for the entire 75% cost-share.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Rathbun Land and Water Alliance and partners have implemented a unique approach to water quality protection through the Rathbun Lake Special Project. This approach is achieving a significant reduction in the sediment and phosphorus that impair water quality in Rathbun Lake and its tributaries as a result of the targeted application of best management practices (BMPs) for priority land in the watershed. This project application proposes to assist landowners to apply BMPs that will reduce sediment and phosphorus delivery from priority land in two targeted sub-watersheds as part of the Rathbun Lake Special Project Features of this project are: (1) use of geographic information system (GIS) analysis to identify priority land that requires BMPs; (2) assistance for landowners to apply BMPs on more than 2,200 acres that will reduce sediment and phosphorus delivery by 3,300 tons and 13,300 pounds per year respectively; (3) evaluation of the benefits from BMP application using GIS analysis and water quality monitoring; and (4) watershed outreach activities that encourage landowners to apply BMPs for priority land to protect water quality.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This work analyses the political news of eight Spanish television channels in order to see what image is built of politics, and particularly how the news of corruption affects the image of politics in Spanish news broadcasts. Different cases of corruption such as Gürtel, Palma Arena and those associated with judge Baltasar Garzón in his final stage in office, occupy part of the study. A new methodology is therefore proposed that enables the quality of the political information emitted from inside and outside the political content of the news programmes to be observed. Particular attention is paid to the news broadcasts of Televisión Española and Cuatro as those which offer a more balanced view of politics, and channels such as La Sexta, which give priority to a narrative construction of politics in the news programmes around causes of corruption.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The Watershed Improvement Review Board (WIRB) Grant will be used to enhance an on-going water quality project in Elk River Watershed. A targeted, locally controlled project has been active in the watershed since 2001. Current funding is being received primarily from the EPA-319 program, administrated by IDNR and the Watershed Protection Fund (WSPF) administrated by IDALS-DSC. Substantial funding is also obtained from the yearly county allocation of the Environmental Quality Incentive Program (EQIP) administrated by the USDA-NRCS. The overall objective of the Elk River Water Quality Project is to improve and restore the water quality in this water body by keying in on the potential sources of the identified impairments, and forging a working partnership between the local residents and the conservation agencies and organizations involved in the project. The major potential sources of the known surface water quality problems were identified during the assessment process and pointed to feedlot runoff and sediment delivery from within priority sub-watersheds. WIRB Funds will be used to cost share the application of Best Management Practices, thus reducing the projects dependency on federal funds. Funds will also be used to overcome a project’s limiting factor associated with insufficient technical assistance.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project proposes a unique approach to addressing one of the more challenging issues facing efforts to protect water quality in Rathbun Lake; reducing sediment and phosphorus delivery from land on which best management practices (BMPs) will not be applied. This project will construct ten impoundments at key locations in the watershed to reduce the annual delivery of 2,970 tons of sediment and 12,100 pounds of phosphorus to Rathbun Lake. Features of this approach are: (a) impoundments will be constructed at sites below areas with high concentrations of priority land that has the greatest potential to deliver sediment and phosphorus to Rathbun Lake and on which landowners are unable or unwilling to apply BMPs and (b) strategically placed, large impoundments can be a cost effective means of reducing the sediment and phosphorus delivered to Rathbun Lake from priority land on which BMPs will not be applied. This project will significantly enhance the success of efforts underway in the Rathbun Lake Special Project as it addresses a critical water quality protection need that is not being met by current Special Project activities.