977 resultados para Preliminary program
Resumo:
A-1A SUPPLEMENTAL SECURITY INCOME PROGRAM
Resumo:
During the year 2011, Chile has been scenario of several student's demonstrations claiming for more equity in the access to the higher education. The high support to the protests by the side of the general population (nearly 89% of approval in public opinion polls) seems to suggest the existence of a large consensus about the weaknesses of the Chilean educative model, a model that would challenge the traditional ideals of meritocracy and social mobility that are at the core of the educational systems in modern societies. In this context, a question that remains open is to what extent these claims are mostly based on consensual equality ideals, or whether they are influenced by individual socio-economic determinants vis-à-vis rational motives. Using data of the social inequality module International Social Survey Program (ISSP) of 2009, this research analyzes perceptions and beliefs about education and the distributive system as well as the influence of income and educational variables, through a structural equation modeling framework. Preliminary results indicate the presence of socioeconomic cleavages in relation to the fairness of the educational system, questioning the assumption about a normative consensus.
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
A-1 Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
This research involved two studies: one to determine the local geoid to obtain mean sea level elevation from a global positioning system (GPS) to an accuracy of ±2 cm, and the other to determine the location of roadside features such as mile posts and stop signs for safety studies, geographic information systems (GIS), and maintenance applications, from video imageries collected by a van traveling at traffic speed.
Resumo:
Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.
Resumo:
Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
SUPPLEMENTAL SECURITY INCOME PROGRAM
Resumo:
Future plans for funding for Iowa Department of Transportation Report.
Resumo:
SUPPLEMENTAL SECURITY INCOME PROGRAM
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
A-1 Monthly Public Assistance Statistical Report Family Investment Program, June 2005