926 resultados para Maximum available power
Resumo:
"Prepared under contract with the United States Atomic Energy Commission, GNEC/AEC contract AT-(40-I)-2674 and PRWRA/AEC contract AT-(40-I)-2672."
Resumo:
"Other issues of this report may bear the number BAW-7."
Resumo:
"July 1978."
Resumo:
"DOE/EV-0095."
Resumo:
"TID-3313."
Resumo:
"February 14, 1952."
Resumo:
"This report was prepared at the request of the United States Atomic energy commission by Messrs. Harry I. Miller ... and F. Douglas Campbell."
Resumo:
"Nuclear Power Group."
Resumo:
Cover-title.
Resumo:
Mode of access: Internet.
Resumo:
Mode of access: Internet.
Resumo:
Reprinted from Congressional record, with exception of illustrations.
Resumo:
Phase I report. Site selection and estimated water costs based on current technology. Phase II report. Investigation of emerging technology, by-product recovery, and very large capacities. Period of performance: June 1965-Oct. 1966.
Resumo:
"Unclassified."
Resumo:
v.2. Unbalances and system disturbances.