865 resultados para Local Participatory Planning
Resumo:
Asset management in local government is an emerging discipline and over a decade has become a crucial aspect towards a more efficient and effective organisation. One crucial feature in the public asset management is performance measurement toward the public real estates. This measurement critically at the important component of public wealth and seeks to apply a standard of economic efficiency and effective organisational management especially in such global financial crisis condition. This paper aims to identify global economic crisis effect and proposes alternative solution for local governments to softening the impact of the crisis to the local governments organisation. This study found that the most suitable solution for local government to solve the global economic crisis in Indonesia is application of performance measurement in its asset management. Thus, it is important to develop performance measurement system in local government asset management process. This study provides suggestions from published documents and literatures. The paper also discusses the elements of public real estate performance measurement. The measurement of performance has become an essential component of the strategic thinking of assets owners and managers. Without having a formal measurement system for performance, it is difficult to plan, control and improve local government real estate management system. A close look at best practices in public sectors reveals that in most cases these practices were transferred from private sector reals estate management under the direction of real estate experts retained by government. One of the most significant advances in government property performance measurement resulted from recognition that the methodology used by private sector, non real estate corporations for managing their real property offered a valuable prototype for local governments. In general, there are two approaches most frequently used to measure performance of public organisations. Those are subjective and objective measures. Finally, findings from this study provides useful input for the local government policy makers, scholars and asset management practitioners to establish a public real estate performance measurement system toward more efficient and effective local governments in managing their assets as well as increasing public services quality in order to soften the impact of global financial crisis.
Resumo:
In recent years, unmanned aerial vehicles (UAVs) have been widely used in combat, and their potential applications in civil and commercial roles are also receiving considerable attention by industry and the research community. There are numerous published reports of UAVs used in Earth science missions [1], fire-fighting [2], and border security [3] trials, with other speculative deployments, including applications in agriculture, communications, and traffic monitoring. However, none of these UAVs can demonstrate an equivalent level of safety to manned aircraft, particularly in the case of an engine failure, which would require an emergency or forced landing. This may be arguably the main factor that has prevented these UAV trials from becoming full-scale commercial operations, as well as restricted operations of civilian UAVs to only within segregated airspace.
Resumo:
DMAPS (Distributed Multi-Agent Planning System) is a planning system developed for distributed multi-robot teams based on MAPS (Multi-Agent Planning System). MAPS assumes that each agent has the same global view of the environment in order to determine the most suitable actions. This assumption fails when perception is local to the agents: each agent has only a partial and unique view of the environment. DMAPS addresses this problem by creating a probabilistic global view on each agent by fusing the perceptual information from each robot. The experimental results on consuming tasks show that while the probabilistic global view is not identical on each robot, the shared view is still effective in increasing performance of the team.
Resumo:
This paper describes an application of decoupled probabilistic world modeling to achieve team planning. The research is based on the principle that the action selection mechanism of a member in a robot team can select an effective action if a global world model is available to all team members. In the real world, the sensors are imprecise, and are individual to each robot, hence providing each robot a partial and unique view about the environment. We address this problem by creating a probabilistic global view on each agent by combining the perceptual information from each robot. This probabilistic view forms the basis for selecting actions to achieve the team goal in a dynamic environment. Experiments have been carried out to investigate the effectiveness of this principle using custom-built robots for real world performance, in addition, to extensive simulation results. The results show an improvement in team effectiveness when using probabilistic world modeling based on perception sharing for team planning.
Resumo:
Hong Kong has been one of the early jurisdictions to adopt Public Private Partnership (PPP) model for delivering large public infrastructure projects. The development of this procurement approach in Hong Kong has followed an intricate path. As such, it is believed that there are a number of areas which are interesting to unveil. As part of a comprehensive research study looking at implementing PPPs, interviews with experienced local industrial practitioners from the public sector were conducted to realize their perspective on the topic of procuring public works projects. Amongst these interviews, fourteen were launched government officials and advisers. The interview findings show that the majority of the Hong Kong and Australian interviewees had previously conducted some kind of research in the field of PPP. Both groups of interviewees agreed that “PPPs gain private sector’s added efficiency/expertise/management skills” when compared to projects procured traditionally. Also, both groups of interviewees felt that projects best suited to use PPP are those that have an “Economic business case”. The interviewees believed that “Contractor’s performance” could be used as key performance indicators for PPP projects. A large number of critical success factors were identified by the interviewees for PPP projects; two of these were similar for both groups of interviewees. These included “Project objectives well defined” and “Partnership spirit/commitment/trust”. Finally it was found that in-house guidance materials were more common in the organizations of the Australian interviewees compared to the Hong Kong ones. This paper studies the views of the public sector towards the topic of PPPs in Hong Kong and Australia, which helps to answer some of the queries that both academics and the private sector in these jurisdictions are keen to know. As a result the private sector can be more prepared when negotiating with the public sector and realise their needs better, academics on the other hand are provided a wider perspective of this topic benefiting the research industry at large.
Resumo:
Participatory design has the moral and pragmatic tenet of including those who will be most affected by a design into the design process. However, good participation is hard to achieve and results linking project success and degree of participation are inconsistent. Through three case studies examining some of the challenges that different properties of knowledge - novelty, difference, dependence - can impose on the participatory endeavour we examine some of the consequences to the participatory process of failing to bridge across knowledge boundaries - syntactic, semantic, and pragmatic. One pragmatic consequence, disrupting the user's feeling of involvement to the project, has been suggested as a possible explanation for the inconsistent results linking participation and project success. To aid in addressing these issues a new form of participatory research, called embedded research, is proposed and examined within the framework of the case studies and knowledge framework with a call for future research into its possibilities.
Resumo:
Water quality issues are heavily dependent on land development and management decisions within river and lake catchments or watersheds. Economic benefits of urbanisation may be short‐ lived without cleaner environmental outcomes. However, whole‐of‐catchment thinking is not, as yet, as frequent a consideration in urban planning and development in China as it is in many other countries. Water is predominantly seen as a resource to be ‘owned’ by different jurisdictions and allocated to numerous users, both within a catchment and between catchments. An alternative to this approach is to think of water in the same way as other commodities that must be kept moving through a complex transport system. Water must ultimately arrive at particular destinations in the biosphere, although it travels across a broad landscape and may be held up temporarily at certain places along the way. While water extraction can be heavily controlled, water pollution is far more difficult to regulate. Both have significant impacts on water availability and flows both now and in the future. As Chinese cities strive to improve economic conditions for their citizens, new centres are being rebuilt and environmental valued
Resumo:
This paper presents the application of advanced optimization techniques to unmanned aerial system mission path planning system (MPPS) using multi-objective evolutionary algorithms (MOEAs). Two types of multi-objective optimizers are compared; the MOEA nondominated sorting genetic algorithm II and a hybrid-game strategy are implemented to produce a set of optimal collision-free trajectories in a three-dimensional environment. The resulting trajectories on a three-dimensional terrain are collision-free and are represented by using Bézier spline curves from start position to target and then target to start position or different positions with altitude constraints. The efficiency of the two optimization methods is compared in terms of computational cost and design quality. Numerical results show the benefits of adding a hybrid-game strategy to a MOEA and for a MPPS.
Resumo:
This paper presents advanced optimization techniques for Mission Path Planning (MPP) of a UAS fitted with a spore trap to detect and monitor spores and plant pathogens. The UAV MPP aims to optimise the mission path planning search and monitoring of spores and plant pathogens that may allow the agricultural sector to be more competitive and more reliable. The UAV will be fitted with an air sampling or spore trap to detect and monitor spores and plant pathogens in remote areas not accessible to current stationary monitor methods. The optimal paths are computed using a Multi-Objective Evolutionary Algorithms (MOEAs). Two types of multi-objective optimisers are compared; the MOEA Non-dominated Sorting Genetic Algorithms II (NSGA-II) and Hybrid Game are implemented to produce a set of optimal collision-free trajectories in three-dimensional environment. The trajectories on a three-dimension terrain, which are generated off-line, are collision-free and are represented by using Bézier spline curves from start position to target and then target to start position or different position with altitude constraints. The efficiency of the two optimization methods is compared in terms of computational cost and design quality. Numerical results show the benefits of coupling a Hybrid-Game strategy to a MOEA for MPP tasks. The reduction of numerical cost is an important point as the faster the algorithm converges the better the algorithms is for an off-line design and for future on-line decisions of the UAV.
Resumo:
Ecological networks are often represented as utopian webs of green meandering through cities, across states, through regions and even across a country (Erickson, 2006, p.28; Fabos, 2004, p.326; Walmsley, 2006). While this may be an inspiring goal for some in developed countries, the reality may be somewhat different in developing countries. China, in its shift to urbanisation and suburbanisation, is also being persuaded to adjust its planning schemes according to these aspirational representations of green spaces (Yu et al, 2006, p.237; Zhang and Wang, 2006, p.455). The failure of other countries to achieve regional goals of natural and cultural heritage protection on the ground in this way (Peterson et al, 2007; Ryan et al, 2006; von Haaren and Reich, 2006) suggests that there may be flaws in the underpinning concepts that are widely circulated in North American and Western European literature (Jongman et al, 2004; Walmsley, 2006). In China, regional open space networks, regional green infrastructure or regional ecological corridors as we know them in the West, are also likely to be problematic, at least in the foreseeable future. Reasons supporting this view can be drawn from lessons learned from project experience in landscape planning and related fields of study in China and overseas. Implementation of valuable regional green space networks is problematic because: • the concept of region as a spatial unit for planning green space networks is ambiguous and undefinable for practical purposes; • regional green space networks traditionally require top down inter-governmental cooperation and coordination which are generally hampered by inequalities of influence between and within government agencies; • no coordinating body with funding powers exists for regional green space development and infrastructure authorities are still in transition from engineering authorities; • like other infrastructure projects, green space is likely to become a competitive rather than a complementary resource for city governments; • stable long-term management, maintenance and uses of green space networks must fit into a ‘family’ social structure rather than a ‘public good’ social structure, particularly as rural and urban property rights are being re-negotiated with city governments; and • green space provision is a performance indicator of urban improvement in cities within the city hierarchy and remains quantitatively-based (land area, tree number and per capita share) rather than qualitatively-based with local people as the focus.
Resumo:
This article reframes comprehension as a social and intellectual practice. It reviews literature on current approaches to reading instruction for linguistically and culturally diverse and low socioeconomic students, noting the current policy emphasis on the teaching of comprehension as autonomous skills and ‘strategies’. The Four Resources model (Freebody & Luke, 1990) is used to situate comprehension instruction with an emphasis on student cultural and community knowledge, and substantive intellectual and sociocultural content in elementary and middle school curricula. Illustrations are drawn from research underway on the teaching of literacy in low socioeconomic schools.
Resumo:
Governments undertake extensive planning of many services and functions, but tend to neglect planning of public service workforces. Disruptions to public service delivery, such as shortages of nurses and doctors, have rejuvenated interest in workforce planning, but many organisations struggle to do it effectively. This historical study examines the capacity of central personnel agencies to predict workforce risks and support workforce planning, using a study of the Queensland public service. It identifies lack of workforce data as a barrier to effective workforce planning, as a result of factors such as changes in the direction of the central personnel agency, lack of appreciation for the value of comprehensive central workforce data, and limited agency human resource (HR) skills or capacity.
Resumo:
While some existing carrying capacity methodologies offer significant insights into the assessment of population carrying capacities, a comprehensive model is yet to be developed. This research identifies, examines and compares a range of methodological approaches to carrying capacity assessment and considers their relevance to future spatial planning. A range of key criteria are employed to compare various existing carrying capacity assessment models. These criteria include integrated systems analysis, dynamic responses, levels of risk, systemic constraints, applicability to future planning and the consideration of regional boundary delineation. It is suggested that by combining successful components from various authors, and collecting a range of interconnected data, a practical and workable system-based model may be achievable in the future.
Resumo:
One way to build more sustainable cities through network technologies is to start with monitoring the level and usage of resources as well as encourage citizens to participate in sustainable everyday practices. This workshop focuses on three fundamental areas of sustainable cities through urban informatics and ubiquitous computing: Environment: climate change adaptation Health: Food practices and cultures Civic engagement: citizen participation and interaction In particular, the workshop seeks to come up with locally (Oulu) specific ‘mash-up’ solutions that enhance the interactions of citizens with the physical city using data from various sources such as sensor networks. Students will work in groups to research, analyze, design, and develop local mash-ups. The workshop is designed to help students gain understanding of sustainability in a techno-social context, such as how the existing data can be effectively utilized, how to gather new data, and how to design efficient and engaging computer-human interactions. Further issues of consideration include access to and privacy of information and spaces, cultural specificities, and transdisciplinary research.
Resumo:
Generative music algorithms frequently operate by making musical decisions in a sequence, with each step of the sequence incorporating the local musical context in the decision process. The context is generally a short window of past musical actions. What is not generally included in the context is future actions. For real-time systems this is because the future is unknown. Offline systems also frequently utilise causal algorithms either for reasons of efficiency [1] or to simulate perceptual constraints [2]. However, even real-time agents can incorporate knowledge of their own future actions by utilising some form of planning. We argue that for rhythmic generation the incorporation of a limited form of planning - anticipatory timing - offers a worthwhile trade-off between musical salience and efficiency. We give an example of a real-time generative agent - the Jambot - that utilises anticipatory timing for rhythmic generation. We describe its operation, and compare its output with and without anticipatory timing.