945 resultados para Harvard University.--Hollis Professorship of Mathematicks and Natural Philosophy.
Resumo:
Two folio-sized leaves containing a two-page handwritten copy of the June 21, 1723 petition of Sever and Welsteed requesting the question of non-resident Fellows in the Corporation be readdressed by the General Court, and a one-page handwritten copy of the answer to the petition passed by the General Court on August 7, 1723. The text of the petition begins "Sheweth that we have formerly represented to the Overseers of the College the Difficulty we were under in the business of it by reason of our not being vested with the power of its Charter..." The petition is incorrectly dated as "June 24th 1722" instead of 1723.
Resumo:
This is a small, paper-bound "waste book" containing minutes taken by the Secretary pro tempore, Samuel Cooke, at meetings held on the following dates: July 31, 1775; August 8, 1775; August 22, 1775; September 5, 1775; October 3, 1775; October 23, 1775 (fragmentary); November 5, 1775; April 16, 1776; and April 23, 1776. Because these meetings took place during the American Revolutionary War, they were held in the "Council chamber at Watertown."
Resumo:
v.63:no.2(1972)
Resumo:
Contains blueprint from the Boston Elevated Railway's construction of subway lines underneath Harvard Square. Indicates area of Harvard Yard where construction crews discovered stones likely from the foundation of Goffe College.
Resumo:
Second copy of the previous blueprint. Also includes a 1934 letter from Edward Dana of the Boston Elevated Railway Public Trustees to Samuel Eliot Morison, Editor of The Tercentennial History of Harvard University responding to Morison's request for additional information about discovery of early Harvard building foundations during the subway construction excavation in Harvard Square.
Resumo:
The estimate includes projected costs for the materials and labor required for each renovation. The anatomical room needed its circular seats raised and altered. The renovation of the lower room included making new window frames and sashes (including replacing glass), installing new doors, and repairing the floors.
Resumo:
Contains an itemized list of costs for painting and glazing tasks to be completed and supplies needed by Watson for Holden Chapel. Tasks include painting Doctor Warren's room twice, painting window sashes and shutters, transporting glass from Boston, and setting each window pane. Supplies needed include oil, white lead, and putty.
Resumo:
Detailed floor plan of either Hollis Hall or Stoughton Hall, as indicated on drawing. Includes dimensions for student chambers, hallways, and stairs.
Resumo:
no.14(1938)
Resumo:
Floor plan of renovations for the first floor of Hollis Hall, as drawn by William Rotch Ware in 1874. Includes dimensions for student chambers, hallways, and coal furnaces.
Resumo:
Floor plan of renovations for the second floor of Hollis Hall, as drawn by William Rotch Ware in 1874. Includes dimensions for proctor's rooms, student chambers, hallways, and coal furnaces.
Resumo:
Floor plan of renovations for the third and fourth floors of Hollis Hall, as drawn by William Rotch Ware in 1874. Includes dimensions for Pi Eta Society rooms, student chambers, hallways, and coal furnaces.
Resumo:
Partial photostat copy of Sheet 2 of 10.
Resumo:
Floor plans and front and end elevations of Indian College drawn by H.R. Shurtleff in May 1934 based on research conducted by Shurtleff from the Harvard College Records and surveys of local period buildings. Shows likely configuration of Indian College with lodging for 20 students, studies, and the printing room which housed the printing press.