992 resultados para Gain planning
Resumo:
Replacing a conventional combustor in a gas turbine with one that produces a pressure gain could significantly raise cycle efficiency. For this efficiency gain to be achieved the exit flow from the combustor must be coupled to the downstream turbine such that the pressure gain produced by the combustor is retained and such that the turbine efficiency is maintained. The exit flow from a pressure gain combustor will often contain a high velocity unsteady jet. It has previously been proposed that ejectors should be used to harness the energy in the unsteady jet, this paper proposes combining an ejector with the first stage vane, producing a single compact component that preserves the combustion driven pressure gain and delivers a suitable flow to the turbine so that its efficiency is not compromised. This novel component has been experimentally tested for the first time. The performance of this first prototype design is found to be low due to high levels of loss generated by secondary flows. However possible mitigation strategies are discussed. It is shown that the unsteadiness at exit form the ejector-vane is reduced compared to the inlet flow. If a pulse combustor were incorporated into a gas turbine, it is unlikely that the level of unsteadiness experienced in a downstream rotor will be significantly larger that that due to the periodic passing of upstream wakes. Copyright © 2010 by Jonathan Heffer.
Resumo:
Describes a study that set out to evaluate the performance impact of a SAP R3 implementation. The SAP system was implemented by a major multinational business in four of its European plants. Qualitative and quantitative data were collected over a two-year period, through surveys and interviews with systems users and by accessing company records. While users were able to identify the operational benefits of SAP, they were still doubtful at the end of the evaluation process whether the system had resulted in any significant positive financial benefits for the business. Two themes related to this observation are explored. First the time lag between operational improvements and subsequent financial impact. Second the importance of learning as a means of reducing the time lag. Learning in this context is a multi-dimensional concept and covers learning how to use the system, learning how to improve the system and learning how to improve the implementation process.
Resumo:
Loss of solids from and gain in weight of meat of whole prawn and prawn meat stored in ice has been studied to explain the mechanism of solid loss. Two stages are identified in this phenomenon. In the first stage water is absorbed without loss of solids resulting in a maximum increase in weight. In the second stage both solids and water are lost resulting in gradual decrease in weight from the maximum reached but not reaching the original weight. It is inferred that whole prawns stored in ice up to two days give the maximum peeled yield without loss of nutrients and at the same time making the peeling process easier.