934 resultados para Environmental management -- Catalonia -- Banyoles
Resumo:
Pós-graduação em Engenharia de Produção - FEB
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
The process of environmental impact assessment (EIA), in the extent of previous environmental studies, has as one of its functions to provide subsidies to the actions of environmental managment of enterprises. However, the proper estructuring of programs that allows to support this managment does not often occurs. This research sought as one of its objectives to evaluate in which extent the process of EIA can be a subsidie for the EMS, providing basic elements of this system. In addition, more specifically, the research had as one of its objetives the development of subsidies for the implantation of an Environmental Managment System (EMS), based on the model of ISO 14001 (2004), for a sewage treatment plant yet to be constructed in the city of President Venceslau / SP. In order to achieve theses objetives, a discussion was held based on the evaluation of environmental studies available in the library of Cetesb / SMA. Still, for the elaboration of subsidies for the EMS of the treatment plant, the research was focused on the structuring of environmental management program, based on the information contained in its Preliminary Environmental Report (PER). The research had as one of its products, the development of subsidies for the planning and control of the environmental aspects and impacts and for the environmental program of the enterprise, based on the use of environmental indicators. It was concluded, based on the results that, in general, the previous environmental studies analyzed showed little emphasis on the phase of development of structured environmental programs that offer guidelines to achieve the desired results for the environmental performance of the company.
Resumo:
This research has as main objective show how the auto industry has been dealing with the environmental factor, more specifically during the production process and the support areas, and how the environmental management system is implemented, the operation and maintenance. Presents a number of actions related to the theme that has been taking by the automakers, as well as a case of the Volkswagen do Brasil engine plant, in São Carlos - SP
Resumo:
Due to environmental concerns and the current legal requirements, companies are looking for ways to reconcile economic growth with environmental preservation. The purpose of this project is to show the stages of implementation of ISO 14001 in a chemical company and propose changes in chemical procedures creating goals to be achieved. In this paper, the study for the implementation of ISO 14001 is in Viapol ltda., where the lack of environmental management can cause enormous impact to the environment and may generate air, soil and water pollution. The project resulted in a mapping of all the processes and a broad survey of waste and emissions, generating proposals to change some of the processes and and creating programs to achieve the goals and objectives proposed in the Environmental Policy. Adopting an environmental management system (EMS), the company will reduce costs by decreasing the amount of raw material used, shooting down on waste disposal and the amount of it, and increasing productivity. By committing to the implementation of the EMS, companies will be demonstrating a proactive approach to environmental issues and enrich its image to consumers’ point of view
Resumo:
In view of the current environmental concerns and legal requirements, this work aims to achieve a diagnosis and offer subsidies for development of an environmental management plan in an industry. The industry considered to be a subject of study of this research is the aviculture, considered its great importance in Brazil and to present a significant environmental impact. The unit of analysis is a chicken slaughterhouse, located in Rio Claro, SP. The developed methodology for identification and analysis of environmental significative aspects were based in the concepts of environmental impact and in the ABNT NBR ISO 14.001:2004. From the analysis of selected aspects, this research proposed several environmental indicators for the company and identified points of environmental improvement. The results of this study provide methods for identifying its environmental aspects and development of its environmental management plan to chicken slaughterhouse and also to other companies.
Resumo:
When exhausted, the batteries are classified as hazardous waste because it has potentially toxic heavy metals and bio-accumulators, such as mercury, cadmium and lead in their internal composition functional. Due to the high level of danger, such waste should be properly designed to not allow theses chemical components to cause significant impacts on the environment. Thus, the recycling of waste in question is the best destination. In this context, was wanted to know, through a questionnaire in interview format, how the graduates of the Universidade Estadual Paulista Julio de Mesquita Filho of Rio Claro / SP are involved with this environmental issue. Since then, has been developed and implemented an environmental management for internal batteries
Resumo:
The implantation of environmental management systens (SGA) in companies is the first step to the company conquers the environmental certification and consequently the benefits of a sustainable production of products, services and activities can bring. However, in the way as they are proposals in bibliographies the implantation of the SGAs, does not identify the definition of the operational stages of implementation of the same ones, generating doubts on the real environmental and administrative performance that they can come to generate for the organization. In this direction, the present research brings a proposal of operational systematics for implantation of SGA in companies, detailing each stage of implantation, considering its particularitities. For in such a way, a revision of norm NBR ISO 14001:2004 was made, looking for to identify to the interpretation imperfections gifts in the normative system. Moreover, other methods of SGA implantation had been searched gifts in the bibliography, searching proposals that detailed the operational aspects of the implantation of the system. In the same way, the accomplishment of a period of training supervised in the first semester of 2007 made possible the practical experience of the functioning of a system of environmental management, beyond the contact with professionals of the area and the acquisition of documents that had helped in the development of the research. The result was the attainment of a detailed procedure more, defining the operational systematic of SGA implantation, beyond the generation of a flowchart, describing as to develop each stage. This detailing certainly will facilitate the implantation of a SGA in companies interested in improving its environmental performance.
Resumo:
In Brazil, rates of urban solid waste generation increase proportionally more than the annual growing of the population. The government, from its federal authority to the municipal spheres, faces increasing challenges for Urban and Environmental management regarding to solid waste in general and, in particular, municipal solid waste. Financial problems added to public health problems that worsen with the serious environmental impacts generated every year. In August 2010 Brazil the PNRS (National Policy on Solid Waste) was approved and sanctioned in which represented a true watershed in the country as a legal framework extremely ambitious and visionary. This work presents the successes and challenges that the municipality of Sorocaba/SP is facing after more than three years of PNRS sanctioned to conduct an Urban and Environmental management suited to the new legal bases towards the subject of solid waste. The results show a large gap between the content proposed by the law and the technical, financial and temporal reality to practical implementation by the municipal government. New legislation and federal incentives, consortiums among the cities, flexible deadlines and environmental education at all levels are certainly some proposals to catalyze processes that aim to solve and overcome the challenges of solid waste
Resumo:
The building sector can cause the environmental degradation, by the natural resources consumption, machinery use and natural landscape modifying. The environmental management system (EMS) improves the environmental quality and makes the companies more competitive. So, this work developed an environmental management system in a building site focused on the solid waste and in the development of mitigation proposals for the most significant environmental impacts. To develop this work it was necessary to follow the building site activities; evaluate the solid waste management; identify the law requirements; identify the environmental aspects and impacts; evaluate the environmental impacts; and propose alternatives for mitigating the adverse environmental critical impacts. The main proposals are the reduction of the waste generation in the place that it’s generated; the reuse and correct final disposal of that wastes; the treatment and reuse of the effluent; and the supervising in the trucks and machineries avoiding the oil spilling and the air pollution
Resumo:
Given the large potential impact that the construction industry has on the environment and the need to reduce environmental degradation , environmental certifications are important tools of environmental management. This work deals with the environmental certifications of sustainable buildings LEED and AQUA . This project employed the method of exploratory research to identify the requirements that impose the greatest difficulties in the implementation of LEED and AQUA , surveying the reasons for the choice of certification to be deployed and to analyzing the main benefits perceived by certified organizations. Concepts related to the topic were obtained from the literature, leading to the development of a questionnaire that was applied in organizations that have gone through the above certifications . From the analysis of questionnaires, it was possible to highlight that the main reasons for the adoption of an environmental certificate in the construction industry are linked to economic issues such as greater market recognition and appreciation of the project and what is still needed to invest in environmental awareness industry and the whole society
Resumo:
This academic work has as its objective to demonstrate the fundamental role of communication as a tool towards implantating an environmental management project in organizations, aswell as familiarizing with the complex relashionship be-tween green businesses and its publics. The concern involving environmental prob-lems are increasing and it directly affects the consumer’s choice and their requests on organizations’ behavior. The integration with all sectors of economy is necessary as a part of a developing process that has as its main objective the environmental conservation and therefore the quality of human life on planet. There is also the question of how in the process of communication there is not an only way of interven-tion, but a continuous reciprocal action. The work is accomplished with an analyses of the green management communication of the business Grupo Abril
Resumo:
Oil spills cause serious damage to the cost life and environments. Those impacts affect ecologic and socio-economic resources (like fishing and tourism). Within this background, response actions have two main objectives: the contaminant removal, with the less additional impacts, and enhance environment restoration in order to make this process complete in the shortest time possible. The present work proposes to contribute for the emergency environmental management in cases of oil spills by systematization of relevant information for oil spill environmental sensitivity maps. The next stage was to insert all these data on a geographic database, which allows data access by web. Beside that, this work aimed to recommend suitable clean-up techniques for the ecosystems located on the study area, composed by the municipalities: Praia Grande, Mongaguá, Itanhaém and Peruíbe, belonging to Baixada Santista and Iguape, Cananéia and Ilha Comprida, south cost of São Paulo state. This area is situated between two important Brazilian ports: Santos and Paranaguá, and that make it under considerable accident risks. The results were all data inserted on the geodatabase and available to user recover the information by web consulting. With that, this work wishes to contribute to individual emergencial planning of the region.
Resumo:
The present study addresses the application of the Environmental Management System in chicken production on a farm owned by the Nardo brothers, located in the city of Guapiaçu/SP (Brazil). The objectives were to analyze the process of solid waste generation, destination and forms of treatment in this activity; propose measures to reduce the use of potable water for non-potable ends; determine other measures identified through a questionnaire drafted by Embrapa (Brazilian Agriculture Research Cooperative) and administered to employees who have direct involvement in the productive process; pay visits to chicken production enterprises; and employ the guidelines proposed by the National Fowl-Breeding Sanitation Program that guide the application of the Environmental Management System. Adequate management of waste was put into effect through the construction of a compost shed capable of meeting current production demands, in which all procedures were accompanied – from civil construction to the commercialization process of the organic fertilizer generated. The rain-gathering system for the roofs of the pens proposed to reduce the consumption of potable ground water destined for washing the floors of the pens was completely dimensioned and budgeted, allowing the motivated owners to place the project into effect in a timely fashion. Other simpler but no less important proposals were also made in order to bring the production up to the required quality standards.