968 resultados para Construction set


Relevância:

20.00% 20.00%

Publicador:

Resumo:

We consider the problem of increasing the threshold parameter of a secret-sharing scheme after the setup (share distribution) phase, without further communication between the dealer and the shareholders. Previous solutions to this problem require one to start off with a non-standard scheme designed specifically for this purpose, or to have communication between shareholders. In contrast, we show how to increase the threshold parameter of the standard Shamir secret-sharing scheme without communication between the shareholders. Our technique can thus be applied to existing Shamir schemes even if they were set up without consideration to future threshold increases. Our method is a new positive cryptographic application for lattice reduction algorithms, inspired by recent work on lattice-based list decoding of Reed-Solomon codes with noise bounded in the Lee norm. We use fundamental results from the theory of lattices (Geometry of Numbers) to prove quantitative statements about the information-theoretic security of our construction. These lattice-based security proof techniques may be of independent interest.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

An anonymous membership broadcast scheme is a method in which a sender broadcasts the secret identity of one out of a set of n receivers, in such a way that only the right receiver knows that he is the intended receiver, while the others can not determine any information about this identity (except that they know that they are not the intended ones). In a w-anonymous membership broadcast scheme no coalition of up to w receivers, not containing the selected receiver, is able to determine any information about the identity of the selected receiver. We present two new constructions of w-anonymous membership broadcast schemes. The first construction is based on error-correcting codes and we show that there exist schemes that allow a flexible choice of w while keeping the complexities for broadcast communication, user storage and required randomness polynomial in log n,. The second construction is based on the concept of collision-free arrays, which is introduced in this paper. The construction results in more flexible schemes, allowing trade-offs between different complexities.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Numeric sets can be used to store and distribute important information such as currency exchange rates and stock forecasts. It is useful to watermark such data for proving ownership in case of illegal distribution by someone. This paper analyzes the numerical set watermarking model presented by Sion et. al in “On watermarking numeric sets”, identifies it’s weaknesses, and proposes a novel scheme that overcomes these problems. One of the weaknesses of Sion’s watermarking scheme is the requirement to have a normally-distributed set, which is not true for many numeric sets such as forecast figures. Experiments indicate that the scheme is also susceptible to subset addition and secondary watermarking attacks. The watermarking model we propose can be used for numeric sets with arbitrary distribution. Theoretical analysis and experimental results show that the scheme is strongly resilient against sorting, subset selection, subset addition, distortion, and secondary watermarking attacks.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ever since Cox et. al published their paper, “A Secure, Robust Watermark for Multimedia” in 1996 [6], there has been tremendous progress in multimedia watermarking. The same pattern re-emerged with Agrawal and Kiernan publishing their work “Watermarking Relational Databases” in 2001 [1]. However, little attention has been given to primitive data collections with only a handful works of research known to the authors [11, 10]. This is primarily due to the absence of an attribute that differentiates marked items from unmarked item during insertion and detection process. This paper presents a distribution-independent, watermarking model that is secure against secondary-watermarking in addition to conventional attacks such as data addition, deletion and distortion. The low false positives and high capacity provide additional strength to the scheme. These claims are backed by experimental results provided in the paper.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis examined the delay causes of Malaysian public sector projects. Using a systematic approach, the researcher identified the main delay factors and categorised them into pathogens. The pathogens were matched with beneficial Supply Chain Management (SCM) tools and developed into a holistic SCM framework to facilitate improvements in Malaysian public sector projects. The researcher concluded that SCM is the potential saviour for the delay dilemma and that it is necessary for the Malaysian government to initiate the revolutionary practice.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Conceptually, the management of safety at roadworks can be seen in a three level framework. At the regulatory level, roadworks operate at the interface between the work environment, governed by workplace health and safety regulations, and the road environment, which is subject to road traffic regulations and practices. At the organizational level, national, state and local governments plan and purchase road construction and maintenance which are then delivered in-house or tendered out to large construction companies who often subcontract multiple smaller companies to supply services and labor. At the operational level, roadworks are difficult to isolate from the general public, hindering effective occupational health and safety controls. This study, from the State of Queensland, Australia, examines how well this tripartite framework functions. It includes reviews of organizational policy and procedures documents; interviews with 24 subject matter experts from various road construction and maintenance organizations, and on-site interviews with 66 road construction personnel. The study identified several factors influencing the translation of safety policies into practice including the cost of safety measures in the context of competitive tendering, lack of firm evidence of the effectiveness of safety measures, and pressures to minimize disruption to the travelling public.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

While formal definitions and security proofs are well established in some fields like cryptography and steganography, they are not as evident in digital watermarking research. A systematic development of watermarking schemes is desirable, but at present their development is usually informal, ad hoc, and omits the complete realization of application scenarios. This practice not only hinders the choice and use of a suitable scheme for a watermarking application, but also leads to debate about the state-of-the-art for different watermarking applications. With a view to the systematic development of watermarking schemes, we present a formal generic model for digital image watermarking. Considering possible inputs, outputs, and component functions, the initial construction of a basic watermarking model is developed further to incorporate the use of keys. On the basis of our proposed model, fundamental watermarking properties are defined and their importance exemplified for different image applications. We also define a set of possible attacks using our model showing different winning scenarios depending on the adversary capabilities. It is envisaged that with a proper consideration of watermarking properties and adversary actions in different image applications, use of the proposed model would allow a unified treatment of all practically meaningful variants of watermarking schemes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This book analyses the principles underlying the construction and application of a number of boilerplate and other clauses commonly included in commercial contracts. The first Part of the work deals with general principles of interpretation. It then considers clauses which allocate commercial risk; clauses relating to performance; clauses introducing new parties by way of assignment, novation or nomination; clauses such as guarantees and indemnities which create liabilities in third parties; and dispute resolution clauses including governing law. The authors highlight common issues surrounding the application of these clauses in practice and, where appropriate, make drafting recommendations based on their analysis of case law and the operation of relevant statutes. This is a very accessible resource for all commercial practitioners.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The productivity of the construction industry has a significant effect on national economic growth. Gains from higher construction productivity flow through the economy, as all industries rely on construction to some extent as part of their business investment. Contractions and expansions of economic activity are common phenomena in an economy. Three construction cycles occurred between the years 1970 and 2011 in Malaysia. The relationships between construction productivity and economic development are examined by the partial correlation method to establish the underlying factors driving the change in construction productivity. Construction productivity is statistically significantly correlated with gross domestic product (GDP) per capita in a positive direction for the 1985–98 and 1998–2009 cycles, but not the 1970–85 cycle. Fluctuations in construction activities and the influx of foreign workers underlie the changes of construction productivity in the 1985–98 cycle. There was less fluctuation in construction activities in the 1998–2009 cycle, with changes being mainly due to the fiscal stimulation policies of the government in attempting to stabilize the economy. The intensive construction of mega-projects resulted in resource constraints and cost pressures during the 1980s and 1990s. A better management of the ‘boom-bust’ nature of the construction business cycle is required to maintain the capability and capacity of the industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry is one of the largest sources of carbon emissions. Manufacturing of raw materials, such as cement, steel and aluminium, is energy intensive and has considerable impact on carbon emissions level. Due to the rising recognition of global climate change, the industry is under pressure to reduce carbon emissions. Carbon labelling schemes are therefore developed as meaningful yardsticks to measure and compare carbon emissions. Carbon labelling schemes can help switch consumer-purchasing habits to low-carbon alternatives. However, such switch is dependent on a transparent scheme. The principle of transparency is highlighted in all international greenhouse gas (GHG) standards, including the newly published ISO 14067: Carbon footprint of products – requirements and guidelines for quantification and communication. However, there are few studies which systematically investigate the transparency requirements in carbon labelling schemes. A comparison of five established carbon labelling schemes, namely the Singapore Green Labelling Scheme, the CarbonFree (the U.S.), the CO2 Measured Label and the Reducing CO2 Label (UK), the CarbonCounted (Canada), and the Hong Kong Carbon Labelling Scheme is therefore conducted to identify and investigate the transparency requirements. The results suggest that the design of current carbon labels have transparency issues relating but not limited to the use of a single sign to represent the comprehensiveness of the carbon footprint. These transparency issues are partially caused by the flexibility given to select system boundary in the life cycle assessment (LCA) methodology to measure GHG emissions. The primary contribution of this study to the construction industry is to reveal the transparency requirements from international GHG standards and carbon labels for construction products. The findings also offer five key strategies as practical implications for the global community to improve the performance of current carbon labelling schemes on transparency.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Describes the development and testing of a robotic system for charging blast holes in underground mining. The automation system supports four main tactical functions: detection of blast holes; teleoperated arm pose control; automatic arm pose control; and human-in-the-loop visual servoing. We present the system architecture, and analyse the major components, Hole detection is crucial for automating the process, and we discuss theoretical and practical aspects in detail. The sensors used are laser range finders and cameras installed in the end effector. For automatic insertion, we consider image processing techniques to support visual servoing the tool to the hole. We also discuss issues surrounding the control of heavy-duty mining manipulators, in particular, friction, stiction, and actuator saturation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The housing construction industry in Saudi Arabia has been booming rapidly in the past two decades. This boom has faced multiple downfalls in relation to government regulations and building codes, one of which is the application of sustainable methods to the housing construction. This paper sheds some light on the current role of the Saudi government and the role of the Saudi Building Code (SBC) in the housing construction industry. The methodology utilised in this paper was a Delphi survey that was distributed to twenty-five key stakeholders in the housing construction industry in Saudi Arabia. The results indicate that there is a lack of integration between the Saudi Building Code and the current construction methods used in the current construction industry. Some factors and elements are recommended to be incorporated into the Saudi Building Code and to be adopted as regulations in the Saudi housing construction industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Funded by an Australian Research Council (ARC) Linkage grant over four years (2009–13), the Major Infrastructure Procurement project sought to find more effective and efficient ways of procuring and delivering the nation’s social and economic infrastructure by investigating constraints relating to construction capacity, competition, and finance in new public sector major infrastructure.1 The research team comprised researchers in construction economics and finance from Queensland University of Technology (QUT), Griffith University (GU), The University of Hong Kong (UHK), and The University of Newcastle (UoN). Project partners included state government departments and agencies responsible for infrastructure procurement and delivery from all Australian mainland states, and private sector companies and peak bodies in the infrastructure sector (see “Introduction” for complete list). There are a number of major outcomes from this research project. The first of these is a scientifically developed decisionmaking model for procurement of infrastructure that deploys a novel and state-of-the-art integration of dominant microeconomic theory (including theories developed by two Nobel Prize winners). The model has been established through empirical testing and substantial experiential evidence as a valid and reliable guide to configuring procurement of new major and mega infrastructure projects in pursuance of superior Valuefor- Money (VfM). The model specifically addresses issues of project size, bundling of contracts, and exchange relationships. In so doing, the model determines the suitability of adopting a Public-Private Partnership (PPP) mode.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A recurring feature of modern practice is the stress placed on project professionals, with both debilitating effects on the people concerned and indirectly affecting project success. Cost estimation, for example, is an essential task for successful project management involving a high level of uncertainty. It is not surprising, therefore, that young cost estimators especially can become stressful at work due to a lack of experience and the heavy responsibilities involved. However, the concept of work stress and the associated underlying dimensions has not been clearly defined in extant studies in the construction management field. To redress this situation, an updated psychology perceived stress questionnaire (PSQ) , first developed by Levenstein et al (1993) and revised by Fliege et al (2005), is used to explore the dimensions of work stress with empirical evidence from the construction industry in China. With 145 reliable responses from young (less than 5 years’ experience) Chinese cost estimators, this study explores the internal dimensions of work stress, identifying four dimensions of tension, demands, lack of joy and worries. It is suggested that this four-dimensional structure may also be applicable in a more general context.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Research problem: Overfitting and collinearity problems commonly exist in current construction cost estimation applications and obstruct researchers and practitioners in achieving better modelling results. Research objective and method: A hybrid approach of Akaike information criterion (AIC) stepwise regression and principal component regression (PCR) is proposed to help solve overfitting and collinearity problems. Utilization of this approach in linear regression is validated by comparing it with other commonly used approaches. The mean square error obtained by leave-one-out cross validation (MSELOOCV) is used in model selection in deciding predictive variables.