900 resultados para Condition Monitoring, Asset Management, Maintenance, Ultrasound, Diagnosis


Relevância:

40.00% 40.00%

Publicador:

Resumo:

The global financial crisis, which started in the summer of 2007 and deepened in the aftermath of the Lehman failure in September 2008, has led to a virtual collapse in economic activity and increased financial volatility worldwide. For the developing countries, the main channel of transmission has been a drop in external transactions, such as trade, financial and capital flows, and remittances. The emerging economies in the southern and eastern Mediterranean have also faced declining economic activity, although there seems to be considerable variation in the relative magnitude and timing. Most of these economies have shown a delayed but more lasting response to the crisis, driven mostly by their close trade and investment ties with the EU and the Gulf Cooperation Council (GCC) countries. This book explores the fiscal, monetary and financial effects of the crisis in the region and provides an in-depth analysis of the fiscal, monetary and banking policies in the post-crisis era, the viability of their exit strategies and the future of reforms in the region. These analyses not only provide a comprehensive comparison between the countries but also provide a solid basis for assessing future economic and financial developments and reforms in the region.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

One in five strokes affects the posterior circulation. Diagnosing posterior circulation stroke can be challenging, as the vascular anatomy can be variable, and because presenting symptoms are often non-specific and fluctuating. Nevertheless, making the correct diagnosis is important, as these strokes have a high chance of recurrence, can be life threatening, and can lead to equally life-threatening complications. Investigation and management largely follow those for stroke in general, although some specific differences exist. These include the preferred use of MRI for diagnosing posterior fossa lesions, the management of basilar artery thrombosis, which may have a longer time window for recanalisation therapy, and the use of endovascular therapies for secondary prevention, which, so far, have not shown any benefit in the treatment of vertebral or basilar artery stenosis. In this review, we summarise the anatomy, aetiology and presentation of posterior circulation stroke, and discuss current approaches to management.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Texas State Department of Highways and Public Transportation, Transportation Planning Division, Austin

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"Cooperative agreement no. CR818353."

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"UILU-ENG 83-1724."--Cover.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Mode of access: Internet.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"This is our report of the Management Audit of the Illinois School District Liquid Asset Fund Plus. The audit was conducted pursuant to Senate Resolution Number 171, which was adopted April 22, 2004. This audit was conducted in accordance with generally accepted government auditing standards and the audit standards promulgated by the Office of the Auditor General at 74 III. ADM. Code 420.310. The audit report is transmitted in conformance with Section 3-14 of the Illinois State Auditing Act."--Cover letter.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

The approved project allows the Corps to dredge the Waukegan Harbor approach channel and advanced maintenance area. The area to be dredged lies immediately east of the north breakwater. It is approximately a rectangle 650 feet north and south and 1,400 feet east and west. The advanced maintenance area is a band along the north side of the channel. The approved project is for a 10-year certification, under which the Corps may remove 22,000 to 75,000 cubic yards of sediment per dredging event. The dredging depth is 22 feet and the amount to be dredged is about one foot of sediment. As a condition of the certification, disposal of the dredged sediment in Lake Michigan or the waters of the state cannot occur until the conditions of the certification are met. These conditions, which have been placed on the certification by Illinois EPA, ensure that the project meets state water quality standards and is consistent with the determinations of the Illinois Attorney General's Task Force on asbestos contamination at Illinois Beach State Park.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

"November 1982."