951 resultados para Building simulation
Resumo:
A non-translating, long duration thunderstorm downburst has been simulated experimentally and numerically by modelling a spatially stationary steady flow impinging air jet. Velocity profiles were shown to compare well with an upper-bound of velocity measurements reported for full-scale microbursts. Velocity speed-up over a range of topographic features in simulated downburst flow was also tested with comparisons made to previous work in a similar flow, and also boundary layer wind tunnel experiments. It was found that the amplification measured above the crest of topographic features in simulated downburst flow was up to 35% less than that observed in boundary layer flow for all shapes tested. From the computational standpoint we conclude that the Shear Stress Transport (SST) model performs the best from amongst a range of eddy-viscosity and second moment closures tested for modelling the impinging jet flow.
Resumo:
A pulsed wall jet has been used to simulate the gust front of a thunderstorm downburst. Flow visualization, wind speed and surface pressure measurements were obtained. The characteristics of the hypothesized ring vortex of a full-scale downburst were reproduced at a scale estimated to be 1:3000.
Resumo:
Convective downburst wind storms generate the peak annual gust wind speed for many parts of the non-cyclonic world at return periods of importance for ultimate limit state design. Despite this there is little clear understanding of how to appropriately design for these wind events given their significant dissimilarities to boundary layer winds upon which most design is based. To enhance the understanding of wind fields associated with these storms a three-dimensional numerical model was developed to simulate a multitude of idealised downburst scenarios and to investigate their near-ground wind characteristics. Stationary and translating downdraft wind events in still and sheared environments were simulated with baseline results showing good agreement with previous numerical work and full-scale observational data. Significant differences are shown in the normalised peak wind speed velocity profiles depending on the environmental wind conditions in the vicinity of the simulated event. When integrated over the height of mid- to high rise structures, all simulated profiles are shown to produce wind loads smaller than an equivalent 10 m height matched open terrain boundary layer profile. This suggests that for these structures the current design approach is conservative from an ultimate loading standpoint. Investigating the influence of topography on the structure of the simulated near-ground downburst wind fields, it is shown that these features amplify wind speeds in a manner similar to that expected for boundary layer winds, but the extent of amplification is reduced. The level of reduction is shown to be dependent on the depth of the simulated downburst outflow.
Resumo:
Global climate change is one of the most significant environmental issues that can harm human development. One central issue for the building and construction industry to address global climate change is the development of a credible and meaningful way to measure greenhouse gas (GHG) emissions. While Publicly Available Specification (PAS) 2050, the first international GHG standard, has been proven to be successful in standardizing the quantification process, its contribution to the management of carbon labels for construction materials is limited. With the recent publication of ISO 14067: Greenhouse gases – carbon footprint of products – requirements and guidelines for quantification and communication in May 2013, it is necessary for the building and construction industry to understand the past, present and future of the carbon labelling practices for construction materials. A systematic review shows that international GHG standards have been evolving in terms of providing additional guidance on communication and comparison, as well as less flexibility on the use of carbon labels. At the same time, carbon labelling schemes have been evolving on standardization and benchmarking. In addition, future actions are needed in the aspect of raising consumer awareness, providing benchmarking, ensuring standardization and developing simulation technologies in order for carbon labelling schemes for construction materials to provide credible, accurate and transparent information on GHG emissions.
Resumo:
Scaffolds are porous biocompatible materials with suitable microarchitectures that are designed to allow for cell adhesion, growth and proliferation. They are used in combination with cells in regenerative medicine to promote tissue regeneration by means of a controlled deposition of natural extracellular matrix by the hosted cells therein. This healing process is in many cases accompanied by scaffold degradation up to its total disappearance when the scaffold is made of a biodegradable material. This work presents a computational model that simulates the degradation of scaffolds. The model works with three-dimensional microstructures, which have been previously discretised into small cubic homogeneous elements, called voxels. The model simulates the evolution of the degradation of the scaffold using a Monte Carlo algorithm, which takes into account the curvature of the surface of the fibres. The simulation results obtained in this study are in good agreement with empirical degradation measurements performed by mass loss on scaffolds after exposure to an etching alkaline solution.
Resumo:
In this paper, we explore how BIM functionalities together with novel management concepts and methods have been utilized in thirteen hospital projects in the United States and the United Kingdom. Secondary data collection and analysis were used as the method. Initial findings indicate that the utilization of BIM enables a holistic view of project delivery and helps to integrate project parties into a collaborative process. The initiative to implement BIM must come from the top down to enable early involvement of all key stakeholders. It seems that it is rather resistance from people to adapt to the new way of working and thinking than immaturity of technology that hinders the utilization of BIM.
Resumo:
Lean construction and building information modeling (BIM) are quite different initiatives, but both are having profound impacts on the construction industry. A rigorous analysis of the myriad specific interactions between them indicates that a synergy exists which, if properly understood in theoretical terms, can be exploited to improve construction processes beyond the degree to which it might be improved by application of either of these paradigms independently. Using a matrix that juxtaposes BIM functionalities with prescriptive lean construction principles, 56 interactions have been identified, all but four of which represent constructive interaction. Although evidence for the majority of these has been found, the matrix is not considered complete but rather a framework for research to explore the degree of validity of the interactions. Construction executives, managers, designers, and developers of information technology systems for construction can also benefit from the framework as an aid to recognizing the potential synergies when planning their lean and BIM adoption strategies.
Resumo:
This paper investigates the mutual relations of three current drivers of construction: lean construction, building information modelling and sustainability. These drivers are based on infrequently occurring changes, only incidentally simultaneous, in their respective domains. It is contended that the drivers are mutually supportive and thus synergistic. They are aligned in the sense that all require, promote or enable collaboration. It is argued that these three drivers should be implemented in a unified manner for rapid and robust improvements in construction industry performance and the quality of the constructed facilities and their benefits for stakeholders and wider society.
Resumo:
Building with Building Information Modelling (BIM) changes design and production processes. But can BIM be used to support process changes designed according to lean production and lean construction principles? To begin to answer this question we provide a conceptual analysis of the interaction of lean construction and BIM for improving construction. This was investigated by compiling a detailed listing of lean construction principles and BIM functionalities which are relevant from this perspective. These were drawn from a detailed literature survey. A research framework for analysis of the interaction between lean and BIM was then compiled. The goal of the framework is to both guide and stimulate research; as such, the approach adopted up to this point is constructive. Ongoing research has identified 55 such interactions, the majority of which show positive synergy between the two.
Resumo:
This series of research vignettes is aimed at sharing current and interesting research findings from our team of international Entrepreneurship researchers. In this vignette, Alireza Javanmardi Kashan and Kavoos Mohannak considers ‘How do firms develop competitive capabilities within product innovation projects?’
Resumo:
The objective of this experimental study is to capture the dynamic temporal processes that occur in changing work settings and to test how work control and individuals' motivational predispositions interact to predict reactions to these changes. To this aim, we examine the moderating effects of global self-determined and non-self-determined motivation, at different levels of work control, on participants' adaptation and stress reactivity to changes in workload during four trials of an inbox activity. Workload was increased or decreased at Trial 3, and adaptation to this change was examined via fluctuations in anxiety, coping, motivation, and performance. In support of the hypotheses, results revealed that, for non-self-determined individuals, low work control was stress-buffering and high work control was stress-exacerbating when predicting anxiety and intrinsic motivation. In contrast, for self-determined individuals, high work control facilitated the adaptive use of planning coping in response to a change in workload. Overall, this pattern of results demonstrates that, while high work control was anxiety-provoking and demotivating for non-self-determined individuals, self-determined individuals used high work control to implement an adaptive antecedent-focused emotion regulation strategy (i.e., planning coping) to meet situational demands. Other interactive effects of global motivation emerged on anxiety, active coping, and task performance. These results and their practical implications are discussed.
Resumo:
This study investigated the effects of workload, control, and general self-efficacy on affective task reactions (i.e., demands-ability fit, active coping, and anxiety) during a work simulation. The main goals were: (1) to determine the extent general self-efficacy moderates the effects of demand and control on affective task reactions, and; (2) to determine if this varies as a function of changes in workload. Participants (N=141) completed an inbox activity under conditions of low or high control and within low and high workload conditions. The order of trials varied so that workload increased or decreased. Results revealed individuals with high general self-efficacy reported better demands-abilities fit and active coping as well as less anxiety. Three interactive effects were found. First, it was found that high control increased demands-abilities fit from trial 1 to trial 2, but only when workload decreased. Second, it was found that low efficacious individuals active coping increased in trial 2, but only under high control. Third, it was found that high control helped high efficacious individuals manage anxiety when workload decreased. However, for individuals with low general self-efficacy, neither high nor low control alleviated anxiety (i.e., whether workload increased or decreased over time).
Resumo:
The Construction industry accounts for a tenth of global GDP. Still, challenges such as slow adoption of new work processes, islands of information, and legal disputes, remain frequent, industry-wide occurrences despite various attempts to address them. In response, IT-based approaches have been adopted to explore collaborative ways of executing construction projects. Building Information Modelling (BIM) is an exemplar of integrative technologies whose 3D-visualisation capabilities have fostered collaboration especially between clients and design teams. Yet, the ways in which specification documents are created and used in capturing clients' expectations based on industry standards have remained largely unchanged since the 18th century. As a result, specification-related errors are still common place in an industry where vast amounts of information are consumed as well as produced in the course project implementation in the built environment. By implication, processes such as cost planning which depend on specification-related information remain largely inaccurate even with the use of BIM-based technologies. This paper briefly distinguishes between non-BIM-based and BIM-based specifications and reports on-going efforts geared towards the latter. We review exemplars aimed at extending Building Information Models to specification information embedded within the objects in a product library and explore a viable way of reasoning about a semi-automated process of specification using our product library.
Resumo:
4D modeling - the simulation and visualisation of the construction process - is now a common method used during the building construction process with reasonable support from existing software. The goal of this paper is to examine the information needs required to model the deconstruction/demolition process of a building. The motivation is the need to reduce the impacts on the local environment during the deconstruction process. The focus is on the definition and description of the activities to remove building components and on the assessment of the noise, dust and vibration implications of these activities on the surrounding environment. The outcomes of the research are: i. requirements specification for BIM models to support operational deconstruction process planning, ii. algorithms for augmenting the BIM with the derived information necessary to automate planning of the deconstruction process with respect to impacts on the surrounding environment, iii. algorithms to build naive deconstruction activity schedules.