830 resultados para ARCHITECTURAL PATRIMONY
Resumo:
The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in-sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Resumo:
The complexity of construction projects and the fragmentation of the construction industry undertaking those projects has effectively resulted in linear, uncoordinated and highly variable project processes in the UK construction sector. Research undertaken at the University of Salford resulted in the development of an improved project process, the Process Protocol, which considers the whole lifecycle of a construction project whilst integrating its participants under a common framework. The Process Protocol identifies the various phases of a construction project with particular emphasis on what is described in the manufacturing industry as the ‘fuzzy front end’. The participants in the process are described in terms of the activities that need to be undertaken in order to achieve a successful project and process execution. In addition, the decision-making mechanisms, from a client perspective, are illustrated and the foundations for a learning organization/industry are facilitated within a consistent Process Protocol.
Resumo:
Techniques for modelling urban microclimates and urban block surfaces temperatures are desired by urban planners and architects for strategic urban designs at the early design stages. This paper introduces a simplified mathematical model for urban simulations (UMsim) including urban surfaces temperatures and microclimates. The nodal network model has been developed by integrating coupled thermal and airflow model. Direct solar radiation, diffuse radiation, reflected radiation, long-wave radiation, heat convection in air and heat transfer in the exterior walls and ground within the complex have been taken into account. The relevant equations have been solved using the finite difference method under the Matlab platform. Comparisons have been conducted between the data produced from the simulation and that from an urban experimental study carried out in a real architectural complex on the campus of Chongqing University, China in July 2005 and January 2006. The results show a satisfactory agreement between the two sets of data. The UMsim can be used to simulate the microclimates, in particular the surface temperatures of urban blocks, therefore it can be used to assess the impact of urban surfaces properties on urban microclimates. The UMsim will be able to produce robust data and images of urban environments for sustainable urban design.
Resumo:
A survey of stencils as used by architects, engineers and surveyors in the 18th, 19th and 20th centuries.
Resumo:
Organizational issues are inhibiting the implementation and strategic use of information technologies (IT) in the construction sector. This paper focuses on these issues and explores processes by which emerging technologies can be introduced into construction organizations. The paper is based on a case study, conducted in a major house building company that was implementing a virtual reality (VR) system for internal design review in the regional offices. Interviews were conducted with different members of the organization to explore the introduction process and the use of the system. The case study findings provide insight into the process of change, the constraints that inhibit IT implementation and the relationship between new technology and work patterns within construction organizations. They suggest that (1) user-developer communications are critical for the successful implementation of non-diffused innovations in the construction industry; and (2) successful uptake of IT requires both strategic decision-making by top management and decision-making by technical managers.
Resumo:
The paper provides details of the size and scope of construction research carried out in a number of architecture, civil engineering and building related departments in British universities. After considering the level of funding, the type of research projects undertaken and the resulting outputs, especially how these benefit industry, the paper focuses on the careers of academics and researchers and the way in which research is organized at university, departmental and team levels. Finally, the paper suggests that whilst the construction research community in universities has many strengths, there is a danger that in responding to recent opportunities it may overreach itself. The end result may be disappointing for all parties involved. Some of the factors which would contribute to an effective approach to the development of links between universities and industry are discussed.