Impact of a price-maker pumped storage hydro unit on the integration of wind energy in power systems
Resumo:
The increasing integration of larger amounts of wind energy into power systems raises important operational issues, such as the balance between power generation and demand. The pumped storage hydro (PSH) units are one possible solution to mitigate this problem, once they can store the excess of energy in the periods of higher generation and lower demand. However, the behaviour of a PSH unit may differ considerably from the expected in terms of wind power integration when it operates in a liberalized electricity market under a price-maker context. In this regard, this paper models and computes the optimal PSH weekly scheduling in a price-taker and price-maker scenarios, either when the PSH unit operates in standalone and integrated in a portfolio of other generation assets. Results show that the price-maker standalone PSH will integrate less wind power in comparison with the price-taker situation. Moreover, when the PSH unit is integrated in a portfolio with a base load power plant, the role of the price elasticity of demand may completely change the operational profile of the PSH unit. (C) 2014 Elsevier Ltd. All rights reserved.
Resumo:
The integration of wind power in eletricity generation brings new challenges to unit commitment due to the random nature of wind speed. For this particular optimisation problem, wind uncertainty has been handled in practice by means of conservative stochastic scenario-based optimisation models, or through additional operating reserve settings. However, generation companies may have different attitudes towards operating costs, load curtailment, or waste of wind energy, when considering the risk caused by wind power variability. Therefore, alternative and possibly more adequate approaches should be explored. This work is divided in two main parts. Firstly we survey the main formulations presented in the literature for the integration of wind power in the unit commitment problem (UCP) and present an alternative model for the wind-thermal unit commitment. We make use of the utility theory concepts to develop a multi-criteria stochastic model. The objectives considered are the minimisation of costs, load curtailment and waste of wind energy. Those are represented by individual utility functions and aggregated in a single additive utility function. This last function is adequately linearised leading to a mixed-integer linear program (MILP) model that can be tackled by general-purpose solvers in order to find the most preferred solution. In the second part we discuss the integration of pumped-storage hydro (PSH) units in the UCP with large wind penetration. Those units can provide extra flexibility by using wind energy to pump and store water in the form of potential energy that can be generated after during peak load periods. PSH units are added to the first model, yielding a MILP model with wind-hydro-thermal coordination. Results showed that the proposed methodology is able to reflect the risk profiles of decision makers for both models. By including PSH units, the results are significantly improved.
Resumo:
Dissertação para obtenção do Grau de Doutor em Engenharia Química e Bioquímica
Resumo:
A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics
Resumo:
Certificate for 100 preference shares in The Tait Storage Battery Company, Limited to the estate of Hamilton K. Woodruff, March 2, 1934.
Resumo:
Certificate for 20 shares of capital stock in The Tait Storage Battery Company Limited to the estate of Hamilton K Woodruff, March 2, 1934.
Resumo:
Crown timber regulations which include: 2 double-sided printed pages issued by the Department of Crown Lands (2 copies). Included with this are 3 printed slips of paper. 2 of these are Order and Regulations by S. Richards, Commissioner of Crown Lands, dated May 28, 1869 and 1 is a notice of sale of timber berths dated Aug.1, 1872 by Richard Wm. Scott, commissioner, 1869, 1872.
Resumo:
Printed blank by which John Brown Cullen solemnly declares that he is experienced in the art of measuring and culling timber. He states that he is entering into the service of Burton and Bro. of Barrie He will make out the specification of the timber in berths 192 and 198 and submit his findings to Burton and Brother, Oct. 22, 1877.
Resumo:
Declaration from John Brown, culler who states that there are 1167 pieces which equal 75704 cubic feet of timber to be culled, April 9, 1878.
Resumo:
Chart of bill of timber in bridges, culverts, cattle-guard and roadways, signed by S.D. Woodruff, Oct. 18, 1855.
Resumo:
List of [timber railway] piles delivered and driven (1 page, handwritten). This is signed by Alex Morrison, July 1856.
Resumo:
Chart of the bill of timber for the railway bridge near Hurst’s, signed by S.D. Woodruff, Oct. 15, 1855.
Resumo:
Letter to S.D. Woodruff stating the total quantity of timber plank in the Port Robinson Bridge at Chippawa. This is signed by Fred Holmes, Oct. 6, 1857.
Resumo:
Letter (unsigned) to George H. Gillespie regarding Col. Clark’s proposal regarding timber in Long Point. The writer [S.D. Woodruff] makes the argument that the point was purchased as a sporting preserve so it is desirable not to take the timber off the land, Aug. 5, 1868.
Resumo:
Letter to S.D. Woodruff from George H. Gillespie stating that Col. Clark has withdrawn his proposal about timber on the point. “Please send your views”, Aug. 10, 1868.