The Iowa Department of Transportation (IDOT) has been requiring Critical Path Method (CPM) schedules on some larger or more schedule sensitive projects. The Office of Construction's expectations for enhanced project control and improved communication of project objectives have not been fully met by the use of CPM. Recognizing that the current procedures might not be adequate for all projects, IDOT sponsored a research project to explore the state-of-the-art in transportation scheduling and identify opportunities for improvement. The first phase of this project identified a technique known as the Linear Scheduling Method (LSM) as an alternative to CPM on certain highway construction projects. LSM graphically displays the construction process with respect to the location and the time in which each activity occurs. The current phase of this project was implemented to allow the research team the opportunity to evaluate LSM on all small groups of diverse projects. Unlike the first phase of the project, the research team was closely involved in the project from early in the planning phase throughout the completion of the projects. The research strongly suggests that the linear scheduling technique has great potential as a project management tool for both contractors and IDOT personnel. However, before this technique can become a viable weapon in the project management arsenal, a software application needs to be developed. This application should bring to linear scheduling a degree of functionality as rich and as comprehensive as that found in microcomputer based CPM software on the market today. The research team recommends that the IDOT extend this research effort to include the development of a linear scheduling application.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This research project was directed at laboratory and field evaluation of sodium montmorillonite clay (Bentonite) as a dust palliative for limestone surfaced secondary roads. It was postulated that the electrically charged surfaces (negative) of the clay particles could interact with the charged surfaces (positive) of the limestone and act as a bonding agent to agglomerate fine (-#200) particulates, and also to bond the fine particulates to larger (+#200) limestone particles. One mile test roads were constructed in Tama, Appanoose, and Hancock counties in Iowa using Bentonite treatment levels (by weight of aggregate) ranging from 3.0 to 12.0%. Construction was accomplished by adding dry Bentonite to the surfacing material and then dry road mixing. The soda ash/water solution (dispersing agent) was spray applied and the treated surfacing material wet mixed by motor graders to a consistency of 2 to 3 inch slump concrete. Two motor graders working in tandem provided rapid mixing. Following wet mixing the material was surface spread and compacted by local traffic. Quantitative and qualitative periodic evaluations and testing of the test roads was conducted with respect to dust generation, crust development, roughness, and braking characteristics. As the Bentonite treatment level increased dust generation decreased. From a cost/benefit standpoint, an optimum level of treatment is about 8% (by weight of aggregate). For roads with light traffic, one application at this treatment level resulted in a 60-70% average dust reduction in the first season, 40-50% in the second season, and 20-30% in the third season. Crust development was rated at two times better than untreated control sections. No discernible trend was evident with respect to roughness. There was no evident difference in any of the test sections with respect to braking distance and braking handling characteristics, under wet surface conditions compared to the control sections. Chloride treatments are more effective in dust reduction in the short term (3-4 months). Bentonite treatment is capable of dust reduction over the long term (2-3 seasons). Normal maintenance blading operations can be used on Bentonite treated areas. Soda ash dispersed Bentonite treatment is estimated to be more than twice as cost effective per percent dust reduction than conventional chloride treatments, with respect to time. However, the disadvantage is that there is not the initial dramatic reduction in dust generation as with the chloride treatment. Although dust is reduced significantly after treatment there is still dust being generated. Video evidence indicates that the dust cloud in the Bentonite treated sections does not rise as high, or spread as wide as the cloud in the untreated section. It also settles faster than the cloud in the untreated section. This is considered important for driving safety of following traffic, and for nuisance dust invasion of residences and residential areas. The Bentonite appears to be functioning as a bonding agent.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report describes the development of performance measures for the Iowa DOT Construction Offices. The offices are responsible for administering all transportation construction projects for the Iowa DOT. In conjunction with a steering team composed of representatives of the Construction Offices, the research team developed a list of eight key processes and a set of measures for each. Two kinds of data were gathered: baseline data and benchmark data. Baseline data is used to characterize current performance. Benchmark data is gathered to find organizations that have excellent performance records for one or more key functions. This report discusses the methodology used and the results obtained. The data obtained represents the first set of data points. Subsequent years will establish trends for each of the measures, showing improvement or lack of it.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Recent reports have indicated that 23.5% of the nation's highway bridges are structurally deficient and 17.7% are functionally obsolete. A significant number of these bridges are on the Iowa secondary road system where over 86% of the rural bridge management responsibilities are assigned to the counties. Some of the bridges can be strengthened or otherwise rehabilitated, but many more are in need of immediate replacement. In a recent investigation (HR-365 "Evaluation of Bridge Replacement Alternatives for the County Bridge System") several types of replacement bridges that are currently being used on low volume roads were identified. It was also determined that a large number of counties (69%) have the ability and are interested in utilizing their own forces to design and construct short span bridges. After reviewing the results from HR-365, the research team developed one "new" bridge replacement concept and a modification of a replacement system currently being used. Both of these bridge replacement alternatives were investigated in this study, the results of which are presented in two volumes. This volume (Volume 2) presents the results of Concept 2 - Modification of the Beam-in-Slab Bridge. Concept 1 - Steel Beam Precast Units is presented in Volume 1. Concept 2 involves various laboratory tests of the Beam-in-Slab bridge (BISB) currently being used by Benton County and several other Iowa counties. In this investigation, the behavior and strength of the BISB were determined; a new method of obtaining composite action between the steel beams and concrete was also tested. Since the Concept 2 bridge is primarily intended for use on low-volume roads, the system can be constructed with new or used beams. In the experimental part of the investigation, there were three types of laboratory tests: push-out tests, service and ultimate load tests of models of the BISB, and composite beam tests utilizing the newly developed shear connection. In addition to the laboratory tests, there was a field test in which an existing BISB was service load tested. An equation was developed for predicting the strength of the shear connection investigated; in addition, a finite element model for analyzing the BISB was also developed. Push-out tests were completed to determine the strength of the recently developed shear connector. A total of 36 specimens were tested, with variables such as hole diameter, hole spacing, presence of reinforcement, etc. being investigated. In the model tests of the BISB, two and four beam specimens [L=9,140 mm (30 ft)] were service load tested for behavior and load distribution data. Upon completion of these tests, both specimens were loaded to failure. In the composite beam tests, four beams, one with standard shear studs and three using the shear connection developed, were tested. Upon completion of the service load tests, all four beams were loaded to failure. The strength and behavior of the beams with the new shear connection were found to be essentially the same as that of the specimen with standard shear studs.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The road paving cost continues to increase and the backlog of projects waiting for funding is growing. Finding a more cost-effective way to use the available money to pave roads will result in more miles of road being paved with the same amount of money. This project is in Cass County on G35 between US 71 and Norway-Center. It consists of a thin layer of asphalt over a base designed to achieve stability while having some permeability. This project was paved in 1996. An asphalt cement concrete pavement was chosen for the project based on cost, convenience, and historic portland cement concrete problems in Cass County. The new pavement gives quicker access time to farms and residences.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Standard Specifications for this project included requirements for placing two 500 foot test sections of Type B asphaltic concrete with 1-1/2 per cent asbestos fibres (mix size 3/8 inch, lift thickness 3/4 inch) as part of the regular construction of the surface course. These requirements were designed to provide asbestos modified mixtures for laboratory analysis and road performance evaluation. This report provides the preliminary results and analysis of test data obtained from tests on the mixtures placed on the roadway. Previous research by G. S. Zuelke (1) and J. H. Kestzman et al (2) indicated that asphaltic concrete mixtures modified with asbestos fibres improved stability, decreased permeability, and allowed the use of higher bitumen contents. This study indicated that the addition of asbestos fibres would permit the use of higher bitumen contents, theoretically improving durability, without adverse results. An indication was also obtained to the effect that asbestos mixtures were more difficult to compact in the field.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new paint testing device was built to determine the resistance of paints to darkening due to road grime being tracked onto them. The device consists of a tire rotating on a sample drum. Soil was applied to the tire and then tracked onto paint samples which were attached to the drum. A colorimeter was used to measure the lightness of the paints after being tracked. Lightness is measured from 0 (absolute black) to 100 (absolute white). Four experiments were run to determine the optimum time length to track a sample, the reproducibility, the effects of different soils, and the maximum acceptable level for darkening of a paint. The following conclusions were reached: 1) the optimum tracking time was 10 minutes; 2) the reproducibility had a standard deviation of 1.5 lightness units; 3) different soils did not have a large effect on the amount of darkening on the paints; 4) a maximum acceptable darkness could not be established based on the limited amount of data; and 5) a correlation exists between the paints which were darkening in the field and the paints which were turning the darkest on the tracking wheel.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Ten miles of U.S. Highway 20 in Webster County began to show deterioration in 1990. Any deterioration was unexpected, since the road was just constructed in 1986 and 1987. The deterioration looked much like the staining and cracking of D-cracking. Cracking was found on 391 joints throughout the 10 mile four lane divided highway. Evaluation of cores from the project reveal low air contents at those locations where cracking is occurring. The cause of the low air contents can only be speculated on. A possible cause may be the vibration from the paver coupled with the additional vibration at the joints. Other projects constructed in 1986 and 1987 with the same equipment show no signs of distress.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Iowa Department of Transportation has been using the Bureau of Public Roads (BPR) Roughometer as part of its detour analysis process for more than 20 years. Advances in technology have made the BPR Roughometer obsolete for ride quality testing. High-speed profilers that can collect the profile of the road at highway speeds are the standard ride instruments for determining ride quality on pavements. The objective of the project was to develop a correlation between the BPR Roughometer and the high-speed laser South Dakota type Profiler (SD Profiler). Nineteen pavement sections were chosen to represent the range of types and conditions for detours. Three computer simulation models were tested on the profiler profiles. The first model is the International Ride Index (IRI) which is considered the standard index for reporting ride quality in the United States. The second model is the Ride Number (RN) developed by the University of Michigan Transportation Research Institute and the third model used is a quarter-car simulation of the BPR Roughometer (ASTM E-1170) which should match the speed and range of roadway features experienced by Iowa's BPR Roughometer Unit. The BPR Roughometer quarter-car model provided the best overall correlation with Iowa's BPR Roughometer.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This report presents the results of a number of detailed Iowa access management case studies. Case studies were selected to provide a cross-section of locations and community sizes in Iowa as well as a variety of project types. Generally, access management projects completed during the mid-1990s were chosen as case studies. Projects ranging from driveway consolidation to full raised medians were analyzed on a before and after basis in terms of traffic safety, traffic operations, and adjacent business vitality. Sources of information used for the case study analysis included: road project files; traffic accident records; state sales tax records; and personal interviews of business owners, business customers, and local officials. The case study results from Iowa essentially confirm results of previous access management research from around the nation. Recent access in Iowa had significant, positive impacts in terms of traffic safety. The average reduction of annual accidents and accident rates on improved roadways was approximately 40%. Improvements in access management also led to significantly better roadway operations for most case studies. Although a small number of individual businesses do report sales losses and/or customer complaints once projects have been completed, access management projects in Iowa have not had an adverse impact on the majority of businesses located along them. In fact, some access management projects in Iowa seem to have contributed to an improved business environment along the corridors that have been improved. The results from the Iowa case studies presented in this report will be used to develop access management education materials for Iowa transportation professionals and other audiences interested in the impacts of access management.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project continues the research which addresses the numerous bridge problems on the Iowa secondary road system. It is a continuation (Phase 2) of Project HR-382, in which two replacement alternatives (Concept 1: Steel Beam Precast Units and Concept 2: Modification of the Benton County Beam-in-Slab Bridge) were investigated. In previous research for concept 1, a precast unit bridge was developed through laboratory testing. The steel-beam precast unit bridge requires the fabrication of precast double-tee (PCDT) units, each consisting of two steel beams connected by a reinforced concrete deck. The weight of each PCDT unit is minimized by limiting the deck thickness to 4 in., which permits the units to be constructed off-site and then transported to the bridge site. The number of units required is a function of the width of bridge desired. Once the PCDT units are connected, a cast-in-place reinforced concrete deck is cast over the PCDT units and the bridge railing attached. Since the steel beam PCDT unit bridge design is intended primarily for use on low-volume roads, used steel beams can be utilized for a significant cost savings. In previous research for concept 2, an alternate shear connector (ASC) was developed and subjected to static loading. In this investigation, the ASC was subjected to cyclic loading in both pushout specimens and composite beam tests. Based on these tests, the fatigue strength of the ASC was determined to be significantly greater than that required in typical low volume road single span bridges. Based upon the construction and service load testing, the steel-beam precast unit bridge was successfully shown to be a viable low volume road bridge alternative. The construction process utilized standard methods resulting in a simple system that can be completed with a limited staff. Results from the service load tests indicated adequate strength for all legal loads. An inspection of the bridge one year after its construction revealed no change in the bridge's performance. Each of the systems previously described are relatively easy to construct. Use of the ASC rather than the welded studs significantly simplified the work, equipment, and materials required to develop composite action between the steel beams and the concrete deck.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Most states, including Iowa, have a significant number of substandard bridges. This number will increase significantly unless some type of preventative maintenance is employed. Both the Iowa Department of Transportation and Iowa counties have successfully employed numerous maintenance, repair and rehabilitation (MR&R) strategies for correcting various types of deficiencies. However, successfully employed MR&R procedures are often not systematically documented or defined for those involved in bridge maintenance. This study addressed the need for a standard bridge MR&R manual for Iowa with emphasis for secondary road applications. As part of the study, bridge MR&R activities that are relevant to the state of Iowa have been systematically categorized into a manual, in a standardized format. Where pertinent, design guidelines have been presented. Material presented in this manual is divided into two major categories: 1) Repair and Rehabilitation of Bridge Superstructure Components, and 2) Repair and Rehabilitation of Bridge Substructure Components. There are multiple subcategories within both major categories that provide detailed information. Some of the detailed information includes step-by-step procedures for accomplishing MR&R activities, material specifications and detailed drawings where available. The source of information contained in the manual is public domain technical literature and information provided by Iowa County Engineers. A questionnaire was sent to all 99 counties in Iowa to solicit information and the research team personally solicited input from many Iowa counties as a follow-up to the questionnaire.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Many rural communities have developed around highways or major county roads; as a result, the main street through small rural communities is often part of a high-speed rural highway. Highways and county roads are characterized by high speeds outside the city limits; they then transition into a reduced speed section through the rural community. Consequently, drivers passing through the community often enter at high speeds and maintain those speeds as they travel through the community. Traffic calming in small rural communities along major roadways is common in Europe, but the U.S. does not have experience with applying traffic-calming measures outside of major urban areas. The purpose of the project was to evaluate traffic-calming treatments on the major road through small Iowa communities using either single-measure low-cost or gateway treatments. The project was partially funded by the Iowa Highway Research Board (IHRB). The focus of the IHRB portion was to evaluate single-measure, low-cost, traffic-calming measures that are appropriate to major roads through small rural communities. Seven different low-cost traffic treatments were implemented and evaluated in five rural Iowa communities. The research evaluated the use of two gateway treatments in Union and Roland; five single-measure treatments (speed table, on-pavement “SLOW” markings, a driver speed feedback sign, tubular markers, and on-pavement entrance treatments) were evaluated in Gilbert, Slater, and Dexter.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Cold in-place recycling (CIR) has become an attractive method for rehabilitating asphalt roads that have good subgrade support and are suffering distress related to non-structural aging and cracking of the pavement layer. Although CIR is widely used, its use could be expanded if its performance were more predictable. Transportation officials have observed roads that were recycled under similar circumstances perform very differently for no clear reason. Moreover, a rational mix design has not yet been developed, design assumptions regarding the structural support of the CIR layer remain empirical and conservative, and there is no clear understanding of the cause-effect relationships between the choices made during the design/construction process and the resulting performance. The objective of this project is to investigate these relationships, especially concerning the age of the recycled pavement, cumulative traffic volume, support conditions, aged engineering properties of the CIR materials, and road performance. Twenty-four CIR asphalt roads constructed in Iowa from 1986 to 2004 were studied: 18 were selected from a sample of roads studied in a previous research project (HR-392), and 6 were selected from newer CIR projects constructed after 1999. This report summarizes the results of a comprehensive program of field distress surveys, field testing, and laboratory testing for these CIR asphalt roads. The results of this research can help identify changes that should be made with regard to design, material selection, and construction in order to lengthen the time between rehabilitation cycles and improve the performance and cost-effectiveness of future recycled roads.