861 resultados para dispersed teams


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Construction is one of the most hazardous industries due to its dynamic, temporary, and decentralized nature. The Hong Kong Commissioner for Labor identifies worker behavior as the root cause of construction accidents. Behavior-based safety (BBS) is one effective approach in managing employee safety issues. However, there is little research on the application of BBS in the construction industry. This research proposes an extension of the BBS approach, proactive behavior-based safety (PBBS), to improve construction safety. PBBS integrates the theory of BBS with the technology of Proactive Construction Management System (PCMS). The innovations of PBBS are: (1) automatically monitoring location-based behaviors; (2)quantitatively measuring safety performance; (3) investigating potential causes of unsafe behaviors; and (4) improving the efficiency of safety management. A pilot study of a Hong Kong construction site practicing PBBS was conducted. The experiment results showed that PBBS performed well on construction accident prevention and the Safety Index (SI) of the two project teams, with increased improvements by 36.07% and 44.70% respectively. It is concluded that PBBS is effective and adaptable to construction industry.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose of this paper One way in which the tendering process can be further improved is by reviewing and clarifying the high costs that participants face during the course of the tendering phase. The study aims to provide project teams working in construction tender preparation a clear picture of what to expect when tendering for infrastructure projects. Design/methodology/approach Firstly, a review of current literature on tendering in infrastructure projects is conducted to identify the associated costs affecting traditional and PPP procurements as well as the potential measures contributing to tendering cost-reduction. A theoretical framework and its corresponding research hypotheses, which are based on the literature reviewed, are then proposed. An industry-wide questionnaire survey is currently under design to solicit industry practitioners’ views on tendering costs and the associated tendering cost-reduction measures. The data collected in the survey will subject to statistical analysis to test the proposed research hypotheses, which will be reported in a forthcoming paper. Findings and value The direct and indirect costs in public-private procurement have been identified and have been categorised into internal and external costs arising from working on tender submissions. A theoretical framework, mainly composed of five mechanisms of cost reduction, has been proposed and will be tested in a forthcoming industry-wide questionnaire survey. Originality/value of paper The findings are expected to lead to a transparent tendering process in infrastructure procurement, in which there is increased engagement from the private sector as well as an increase in competitive tendering.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

To report the outcomes of a randomised educational trial of a new methodology for extended immersion in medical simulation for senior medical students. Clinical Learning through Extended Immersion in Medical Simulation (CLEIMS) is a new methodology for medical student learning. It involves senior students working in teams of 4-5 through the clinical progress of one or more patients over a week, utilising a range of simulation methodologies (simulated patient assessment, simulated significant other briefing, virtual story continuations, pig-trotter wound repair, online simulated on-call modules, interprofessional simulated ward rounds and high fidelity mannequin-based emergency simulations), to enhance learning in associated workshops and seminars. A randomised educational trial comparing the methodology to seminars and workshops alone began in 2010 and interim results were reported at last year’s conference. Updated results are presented here and final primary endpoint outcomes will be available by the time of the conference.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Bricolage is one way firms innovate in the midst of resource constraints. In this thesis bricolage in entrepreneurial firms is investigated as is its impact on firm performance. The research provides empirical tests of bricolage and firm performance and tests environmental dynamism and team compositions as moderating effects that impact the bricolage-performance relationship. The limits of bricolage during firm creation are also explored. This research offers several novel theoretical contributions and some suggestions for entrepreneurs who typically use bricolage in attempts of firm creation.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Emergency Response Teams increasingly use interactive technology to help manage information and communications. The challenge is to maintain a high situation awareness for different interactive devices sizes. This research specifically compared a handheld interactive device in the form of an iPad with a large interactive multi-touch tabletop. A search and rescue inspired simulator was designed to test operator situation awareness for the two sized devices. The results show that operators had better situation awareness on the tabletop device when the operation related to detecting of moving targets, searching target locations, distinguishing target types, and comprehending displayed information.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Large complex projects often fail spectacularly in terms of cost overruns and delays; witness the London Olympics and the Airbus A380. In this project, we studied the emotional intelligence (EI) of leadership teams involved in such projects. We collected our data from 370 employees in 40 project teams working on large Australian defense contracts. We asked leadership team members to complete a scale measuring their EI, and project team members to rate the success of the projects. We found it was not the mean score, but the highest EI score in the leadership team that predicted members’ project success ratings.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Traditionally, it is not easy to carry out tests to identify modal parameters from existing railway bridges because of the testing conditions and complicated nature of civil structures. A six year (2007-2012) research program was conducted to monitor a group of 25 railway bridges. One of the tasks was to devise guidelines for identifying their modal parameters. This paper presents the experience acquired from such identification. The modal analysis of four representative bridges of this group is reported, which include B5, B15, B20 and B58A, crossing the Carajás railway in northern Brazil using three different excitations sources: drop weight, free vibration after train passage, and ambient conditions. To extract the dynamic parameters from the recorded data, Stochastic Subspace Identification and Frequency Domain Decomposition methods were used. Finite-element models were constructed to facilitate the dynamic measurements. The results show good agreement between the measured and computed natural frequencies and mode shapes. The findings provide some guidelines on methods of excitation, record length of time, methods of modal analysis including the use of projected channel and harmonic detection, helping researchers and maintenance teams obtain good dynamic characteristics from measurement data.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Creative digital media are increasingly utilized by companies in all industries. Here cases studies of creative media innovations in manufacturing, mining and education were facilitated and evaluated. The cases dealt respectively with designs in manufacturing, visualizing mining data, and developing tools for adult literacy. The difficulties of merging creative media teams into these different contexts were noted and the idea of creative interoperability was developed. Creative interoperability explains how creative teams can connect with other disciplines to bring about innovations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This project examined the role that written specifications play in the building procurement process and the relationship that specifications should have with respect to the use of BIM within the construction industry. A three-part approach was developed to integrate specifications, product libraries and BIM. Typically handled by different disciplines within project teams, these provide the basis for a holistic approach to the development of building descriptions through the design process and into construction.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to provide a critical analysis of recent examples of action competence among young people engaged in democratic participatory action in sustainability programs in Australia. It explores examples of priorities identified for citizen action, the forms this action takes and the ways that democratic participation can achieve positive outcomes for future sustainability. It suggests multiple ways for developing action competence that provides further opportunities for authentic and engaging citizen action for youth connected to school- and community-based learning, in new and powerful ways. Design/methodology/approach – This conceptual paper examines international literature on the theory of “action competence,” its significance for education for sustainability (EfS) and the ways it can inform education for young people’s democratic participatory citizenship and civic engagement. It analyses examples of the development of action competency among young people in Australia, including the problems and priorities identified for citizen action, the forms this action takes and how it can achieve positive outcomes for sustainability. Following this analysis, the paper suggests multiple ways for developing action competence in EfS in schools and communities in new and powerful ways. Findings – Developing EfS to increase democratic and participatory action among young citizens is now widely regarded as an urgent education priority. There are growing exemplars of school and community organizations’ involvement in developing EfS learning and teaching to increase participatory citizenship. Young people are being empowered to develop a greater sense of agency through involvement in programs that develop action competence with a focus on sustainability in and out of school. New forms of participation include student action teams and peer collaboration among youth who are marshaling social media and direction action to achieve change. Originality/value – It contributes to the literature on multiple ways for developing action competence in EfS.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Background Internationally the stroke unit is recognised as the evidence-based model for patient management, although clarity about the effective components of stroke units is lacking. Whilst skilled nursing care has been proposed as one component, the theoretical and empirical basis for stroke nursing is limited. We attempted to explore the organisational context of stroke unit nursing, to determine those features that staff perceived to be important in facilitating high quality care. Design A case study approach was used, that included interviews with nurses and members of the multidisciplinary teams in two Canadian acute stroke units. A total of 20 interviews were completed, transcribed and analysed thematically using the Framework Approach. Trustworthiness was established through the review of themes and their interpretation by members of the stroke units. Findings Nine themes that comprised an organisational context that supported the delivery of high quality nursing care in acute stroke units were identified, and provide a framework for organisational development. The study highlighted the importance of an overarching service model to guide the organisation of care and the development of specialist and advanced nursing roles. Whilst multidisciplinary working appears to be a key component of stroke unit nursing, various organisational challenges to its successful implementation were highlighted. In particular the consequence of differences in the therapeutic approach of nurses and therapy staff needs to be explored in greater depth. Successful teamwork appears to depend on opportunities for the development of relationships between team members as much as the use of formal communication systems and structures. A co-ordinated approach to education and training, clinical leadership, a commitment to research, and opportunities for role and practice development also appear to be key organisational features of stroke unit nursing. Recommendations for the development of stroke nursing leadership and future research into teamwork in stroke settings are made.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Currently we are facing an overburdening growth of the number of reliable information sources on the Internet. The quantity of information available to everyone via Internet is dramatically growing each year [15]. At the same time, temporal and cognitive resources of human users are not changing, therefore causing a phenomenon of information overload. World Wide Web is one of the main sources of information for decision makers (reference to my research). However our studies show that, at least in Poland, the decision makers see some important problems when turning to Internet as a source of decision information. One of the most common obstacles raised is distribution of relevant information among many sources, and therefore need to visit different Web sources in order to collect all important content and analyze it. A few research groups have recently turned to the problem of information extraction from the Web [13]. The most effort so far has been directed toward collecting data from dispersed databases accessible via web pages (related to as data extraction or information extraction from the Web) and towards understanding natural language texts by means of fact, entity, and association recognition (related to as information extraction). Data extraction efforts show some interesting results, however proper integration of web databases is still beyond us. Information extraction field has been recently very successful in retrieving information from natural language texts, however it is still lacking abilities to understand more complex information, requiring use of common sense knowledge, discourse analysis and disambiguation techniques.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In early stages of design and modeling, computers and computer applications are often considered an obstacle, rather than a facilitator of the process. Most notably, brainstorms, process modeling with business experts, or development planning, are often performed by a team in front of a whiteboard. While "whiteboarding" is recognized as an effective tool, low-tech solutions that allow remote participants to contribute are still not generally available. This is a striking observation, considering that vast majority of teams in large organizations are distributed teams. And this has also been one of the key triggers behind the project described in this article, where a team of corporate researchers decided to identify state of the art technologies that could facilitate the scenario mentioned above. This paper is an account of a research project in the area of enterprise collaboration, with a strong focus on the aspects of human computer interaction in mixed mode environments, especially in areas of collaboration where computers still play a secondary role. It is describing a currently running corporate research project. © 2012 Springer-Verlag.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Creative and ad-hoc work often involves non-digital artifacts, such as whiteboards and post-it notes. The preferred method of brainstorming and idea development, while facilitating work among collocated participants, makes it particularly tricky to involve remote participants, not even mentioning cases where live social involvement is required and the number and location of remote participants can be vast. Our work has originally focused on large distributed teams in business entities. Vast majority of teams in large organizations are distributed teams. Our team of corporate researchers decided to identify state of the art technologies that could facilitate the scenarios mentioned above. This paper is an account of a research project in the area of enterprise collaboration, with a strong focus on the aspects of human computer interaction in mixed mode environments, especially in areas of collaboration where computers still play a secondary role. It is describing a currently running corporate research project. In this paper we signal the potential use of the technology in situation, where community involvement is either required or desirable. The goal of the paper is to initiate a discussion on the use of technologies, initially designed as supporting enterprise collaboration, in situation requiring community engagement. In other words, it is a contribution of technically focused research exploring the uses of the technology in areas such as social engagement and community involvement. © 2012 IEEE.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Males of lek-breeding species defend clustered territories from which they display to visiting females. However, the mechanisms leading to the adoption of clustered male display sites are often unknown. In this study, we examined the possibility of a resource-based lek in New Zealand’s lesser short-tailed bat (Mystacina tuberculata) (Mammalia: Chiroptera), by assessing the placement of “singing roosts” used by males in relation to communal roosting sites used by females. The “resource-based lek” model posits that males settle near resources required by females to increase female encounter rates. For most bat species, where females are highly mobile and widely dispersed across landscapes while foraging, communal daytime roosts dominated by females may represent such a resource. Through use of video footage, spatial analyses of singing-roost locations, and passive-integrated transponder tags we confirmed that M. tuberculata employs a lek mating system. We found that male singing roosts were significantly clustered in space, were defended by resident individuals, and were visited by females (who did not receive resources from males) for mating purposes. Transponder records also indicated that some singing roosts were shared between multiple males. Spatial logistic regression indicated that singing-roost locations were associated with communal roosting sites. Communal roosts are selected based on criteria independent of the locations of singing roosts, suggesting that males responded to the location of communal roosts and not the reverse. Mystacina tuberculata thus provides evidence of a resource-based lek, and is only the second bat species worldwide confirmed to use a lek-mating system.