836 resultados para Project Management Systems


Relevância:

90.00% 90.00%

Publicador:

Resumo:

The construction industry, one of the most important ones in the development of a country, generates unavoidable impacts on the environment. The social demand towards greater respect for the environment is a high and general outcry. Therefore, the construction industry needs to reduce the impact it produces. Proper waste management is not enough; we must take a further step in environmental management, where new measures need to be introduced for the prevention at source, such as good practices to promote recycling. Following the amendment of the legal frame applicable to Construction and Demolition Waste (C&D waste), important developments have been incorporated in European and International laws, aiming to promote the culture of reusing and recycling. This change of mindset, that is progressively taking place in society, is allowing for the consideration of C&D waste no longer as an unusable waste, but as a reusable material. The main objective of the work presented in this paper is to enhance C&D waste management systems through the development of preventive measures during the construction process. These measures concern all the agents intervening in the construction process as only the personal implication of all of them can ensure an efficient management of the C&D waste generated. Finally, a model based on preventive measures achieves organizational cohesion between the different stages of the construction process, as well as promoting the conservation of raw materials through the use and waste minimization. All of these in order to achieve a C&D waste management system, whose primary goal is zero waste generation

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Experiences relating to the InternationalMasters in Rural Development from the Technical University of Madrid (Universidad Politécnica de Madrid, UPM), the first Spanish programme to receive a mention as a Registered Education Programme by InternationalProject Management Association (IPMA) are considered. Backed by an educational strategy based on Project-Based Learning dating back twenty years, this programme has managed to adapt to the competence evaluation requirements proposed by the European Space for Higher Education (ESHE). In order to do this the training is linked to the professional qualification using competences as a reference leading to the qualification in project management as established by the IPMA.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

En este trabajo se comparan las codificaciones de competencias del Plan de estudios de CDIO (Conceive, Desing, Implement and Operate systems in the enterprise and societal context) con las definidas por el Proyecto Tuning y las de IPMA (International Project Management Asociation). También se determina el tipo de aprendizaje más apropiado para lograr la adquisición de competencias en la formación de los ingenieros y se revisa la evolución de los programas de ingeniería industrial en Perú, España y EE.UU para definir las competencias específicas aplicables al caso peruano. La codificación de CDIO responde a los estándares de acreditación de ABET (Accreditation Board for Engineering and Technology) y las competencias del Proyecto Tuning son las definidas para Latinoamérica. Se comparan las competencias definidas en los estándares de acreditación ABET en el ámbito de las ingenierías, con las competencias internacionales según el modelo IPMA. Los resultados evidencian la necesidad de aplicar modelos holísticos que abarquen competencias técnicas, contextuales y de comportamiento en los planes de estudio de ingeniería, su pertinencia para la definición de programas de ingeniería en Latinoamérica y la posibilidad de definir un plan de estudios de ingeniería industrial con una estrategia de aprendizaje apropiada.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La crisis afecta a todos los sectores, es un terremoto en cadena que se inicio en el sector inmobiliario y se ha ido introduciendo en el resto. Todo esto ha dado lugar a una caída brusca de la demanda de los servicios relacionados con la construcción, con un posicionamiento en “espera” de los Promotores e Inversores, que aún tienen liquidez para invertir, buscando oportunidades que lógicamente se tienen que producir en un entorno escasamente fiable como el actual. Aquellos Inversores que vean oportunidades, se aseguraran de que los productos que van a realizar, tengan una demanda suficiente, sus costes estén en consonancia con el mercado, pero sin que aquello perjudique al resultado final, es decir manteniendo la calidad propuesta al inicio del proceso con los costes previstos, dando lugar a un control exhaustivo del producto a realizar, lo cual obligará a una gran profesionalidad por parte de los agentes implicados. Para todo esto habrá que contar con Empresas especializadas, que aporten garantías en este proceso y aseguren tanto al promotor como al Inversor en todo momento donde y en que se invierten sus recursos. La Dirección Integrada de Proyecto (“Project Management “) aplicada al proceso constructivo es una Técnica Metodológica que ayuda a organizar, controlar y gestionar los recursos de los promotores dentro del proceso edificatorio. Cuando los recursos están limitados (que normalmente es la mayoría de las situaciones) gestionarlos de una manera eficiente se convierte en algo muy importante. Bien, pues nos encontramos con que en esta situación actual, los recursos no solo están limitados, si no que son limitados, por lo que un control y un exhaustivo seguimiento de los mismos se convierte no solo en importante si no en fundamental.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

In the year 1999 approves the Law of Construction Building (LOE, in Spanish) to regulate a sector such as construction, which contained some shortcomings from the legal point of view. Currently, the LOE has been in force 12 years, changing the spanish world of the construction, due to influenced by internationalization. Within the LOE, there regulating the different actors involved in the construction building, as the Projects design, the Director of Construction, the developer, The builder, Director of execution of the construction (actor only in Spain, similar as construcion engineer and abroad in), control entities and the users, but lacks figure Project manager will assume the delegation of the promoter helping and you organize, direct and management the process. This figure assumes that the market and contracts are not legally regulated in Spain, then should define and establish its regulation in the LOE. (Spain Construction Law) The translation in spanish of the words "Project Manager is owed to Professor Rafael de Heredia in his book Integrated Project Management, as agent acting on behalf of the organization and promoter assuming control of the project, ie Integraded Project Management . Already exist in Spain, AEDIP (Spanish Association Integrated of Project Construction management) which comprises the major companies in “Project Management” in Spain, and MeDIP (Master in Integrated Construction Project) the largest and most advanced studies at the Polytechnic University of Madrid, in "Construction Project Management" they teach which is also in Argentina. The Integrated Project ("Project Management") applied to the construction process is a methodological technique that helps to organize, control and manage the resources of the promoters in the building process. When resources are limited (which is usually most situations) to manage them efficiently becomes very important. Well, we find that in this situation, the resources are not only limited, but it is limited, so a comprehensive control and monitoring of them becomes not only important if not crucial. The alternative of starting from scratch with a team that specializes in developing these follow directly intervening to ensure that scarce resources are used in the best possible way requires the use of a specific methodology (Manual DIP, Matrix Foreign EDR breakdown structure EDP Project, Risk Management and Control, Design Management, et ..), that is the methodology used by "Projects managers" to ensure that the initial objectives of the promoters or investors are met and all actors in process, from design to construction company have the mind aim of the project will do, trying to get their interests do not prevail over the interests of the project. Among the agents listed in the building process, "Project Management" or DIPE (Director Comprehensive building process, a proposed name for possible incorporation into the LOE, ) currently not listed as such in the LOE (Act on Construction Planning ), one of the agents that exist within the building process is not regulated from the legal point of view, no obligations, ie, as is required by law to have a project, a builder, a construction management, etc. DIPE only one who wants to hire you as have been advanced knowledge of their services by the clients they have been hiring these agents, there being no legal obligation as mentioned above, then the market is dictating its ruling on this new figure, as if it were necessary, he was not hired and eventually disappeared from the building process. As the aim of this article is regular the process and implement the name of DIPE in the Spanish Law of buildings construction (LOE)

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Idea Management Systems are an implementation of open innovation notion in the Web environment with the use of crowdsourcing techniques. In this area, one of the popular methods for coping with large amounts of data is duplicate de- tection. With our research, we answer a question if there is room to introduce more relationship types and in what degree would this change affect the amount of idea metadata and its diversity. Furthermore, based on hierarchical dependencies between idea relationships and relationship transitivity we propose a number of methods for dataset summarization. To evaluate our hypotheses we annotate idea datasets with new relationships using the contemporary methods of Idea Management Systems to detect idea similarity. Having datasets with relationship annotations at our disposal, we determine if idea features not related to idea topic (e.g. innovation size) have any relation to how annotators perceive types of idea similarity or dissimilarity.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La complejidad en los proyectos y la complejidad de la dirección de proyectos son conceptos cuyo interés va en aumento. En el ámbito de los proyectos, dado que la gestión de recursos y las actividades suceden en interacción con las personas, la complejidad en dirección de proyectos resulta ser una práctica inherentemente social. Esto ha hecho que en la actualidad se haya convertido en una necesidad profundizar en el concepto. En el primer capítulo de esta investigación, se hace una revisión del estado del arte del concepto y se construye un marco teórico que permite establecer y justificar las dimensiones de la complejidad en esta disciplina. De igual manera, con una revisión similar de los estándares internacionales existentes, se descubren las herramientas y modelos para el análisis de la complejidad en dirección de proyectos, con la que se pretende, a través de la práctica profesional desde organismos y alianzas internacionales, ayudar a contrastar la utilidad e interés de los conceptos propuestos. En el segundo capítulo, se presenta un marco conceptual sobre la certificación de competencias, se analizan y comparan los principales sistemas de certificación de competencias vigentes en el ámbito de la dirección de proyectos. En el tercer capítulo, se presenta un proceso metodológico novedoso para valorar, desde la integración del conocimiento experto y experimentado, dos aspectos complementarios de la complejidad de la dirección de proyectos: (a) la valoración del nivel de complejidad del proyecto; y (b), la valoración de los efectos en el desarrollo de las competencias de comportamiento de las partes implicadas. La metodología propuesta se aplica a la Comunidad de Regantes LASESA en Huesca (España), proceso que se presenta en el cuarto capítulo. LASESA es un proyecto complejo que gestiona los recursos hídricos de 10.000 hectáreas y con más de 600 propietarios implicados. Los resultados evidencian como la gestión de un proyecto complejo genera efectos positivos en el desarrollo de las competencias de comportamiento de las personas que se implican y participan en los trabajos….. ABSTRACT The complexity of the projects and the complexity of project management are concepts whose interest is increasing. In terms of projects, since the management of resources and activities occur in interaction with people, the project management complexity makes an inherently social practice. This has now has become a necessity to deepen the concept. In the first chapter of this study, we review the state of art of the concept and builds a theoretical framework that allows to establish and justify the dimensions of the complexity in this discipline. Likewise, a similar review of existing international standards, we discover the tools and models for the analysis of complexity in project management, with which it is intended, through professional practice from agencies and international alliances, help to compare the usefulness and interest of the proposed concepts. In the second chapter, we present a conceptual framework for the certification of competences, are analyzed and compared the main skills certification systems in force in the field of project management. In the third chapter, we present a novel methodological process to assess, since the integration of expert knowledge and experienced, complementary aspects of the complexity of project management: (a) the assessment of the level of complexity of the project, and (b ), the assessment of the effects on the development of behavioral competencies of the parties involved. The proposed methodology is applied to the Community Irrigation LASESA in Huesca (Spain), a process that is presented in the fourth chapter. LASESA is a complex project that manages the water resources of 10,000 acres and more than 600 landowners involved. The results show as managing a complex project generates positive effects on the development of behavioral competencies of people who are involved and participate in the work.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La mejora continua debería estar presente siempre en las empresas, dispongan o no de sistemas de gestión. Sin embargo, su aplicación en el sector de la construcción es especialmente difícil debido a las características particulares del mismo. Por este motivo se plantea el objetivo principal de esta Tesis Doctoral: “Establecer una metodología de trabajo que permita a las empresas constructoras implantar proyectos de mejora continua para incrementar la calidad de las viviendas entregadas a los usuarios”. En la investigación llevada a cabo se han inspeccionado 818 viviendas, recogiendo un total de 82.550 incidencias, las cuales se han analizado aplicando cuatro de las siete herramientas estadísticas básicas de la mejora continua (Hoja de recogida de datos, Estratificación, Histograma y Diagrama de Pareto), concluyendo que los tres oficios que concentran el 80% de los defectos, en los que convendría actuar para reducir de manera significativa los fallos de construcción en la fase de pre-entrega, son: Carpintería de Madera, Revestimientos Cerámicos e Instalación de Electricidad. De entre estos tres oficios se ha seleccionado el de Revestimientos Cerámicos para poner en práctica un proyecto de mejora continua. Analizando los datos relativos a este oficio se elabora un listado de 25 defectos tipo en los que se pueden agrupar todas las incidencias detectadas. Aplicando de nuevo las cuatro herramientas básicas de la calidad se destacan los 10 defectos tipo con mayor impacto en volumen de incidencias y en coste de reparación, para focalizar los esfuerzos de mejora. Con esta información se elabora un documento de criterios técnicos para la ejecución de los Revestimientos Cerámicos que se implanta, en parte, en varias obras para tratar de reducir los defectos detectados en las viviendas antes de la entrega a sus propietarios, y se definen unos Índices de Calidad para medir los resultados. Se toman datos de nuevo a 6 y 20 meses desde la implantación del protocolo, se analizan y se calculan los resultados del proyecto de mejora, concluyendo que se está avanzando positivamente. En base a toda la información recogida a lo largo del proceso de la investigación y de la experiencia del proyecto de mejora implantado, se presenta una propuesta de metodología para implementar proyectos de mejora, así como la documentación recomendada para su puesta en práctica, además de la documentación técnica específica para la prevención de los defectos de construcción en Revestimientos Cerámicos incluyendo las fichas de control para la recepción de materiales, control de ejecución y control de recepción del revestimiento terminado. ABSTRACT Continuous improvement should always be a core value in firms of all kinds, whether or not they implement management systems. Nevertheless, its application in the construction sector seems especially difficult due to its inherent intricacies and complexity. The study of this phenomenon is the main aim of the hereby presented PhD dissertation "Establishment of a working methodology that allows construction (related) firms to carry out projects of continuous improvement in order to increase the quality of housing upon delivery to the client". In the present research 818 housing units have been inspected, collecting a total of 82550 incidence entries, which have been analyzed by means of 4 out of the 7 basic statistical tools of continuous improvement: Data collection sheets, stratification, histogram, and Pareto diagram. The data shows that the 3 main trades where special actions should be taken in order to significantly reduce construction defects are: carpentry, ceramic cladding, and electricity systems. These trades combined account for the 80% of the total defects detected during the inspections. Among the mentioned works, ceramic tiling is selected as a continuous improvement case study project. Analysing data relative to this specific trade, a list of 25 defect types is developed. These types gather all detected defects under this group. Further applying the four statistical tools referred to above, the 10 most significant events are highlighted as to clearly determine the improvement measures. These events have the most impact on both volume of defects and reparation costs. This information is then put together in a document of technical criteria for the correct execution of ceramic tiling that is implemented in various ongoing projects under construction as to minimize the defects prior to the final delivery to the client. Also, a series of Quality Index are defined as criteria for execution suitability. 6 to 20 months after the implementation of this control protocol, the same process is repeated with the purpose of comparing results. It is concluded that a positive evolution takes place. Based both on the information collected throughout the research process and the experience of the case study, the dissertation proposes a methodology to successfully implement improvement projects along with reference documentation and specific technical documents for the prevention of construction defects in ceramic tiling, including (i) material reception control sheets, (ii) an execution control sheet, and a sheet relative to the (iii) control of the finished cladding.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

El WCTR es un congreso de reconocido prestigio internacional en el ámbito de la investigación del transporte, y aunque las actas publicadas están en formato digital y sin ISSN ni ISBN, lo consideramos lo suficientemente importante como para que se considere en los indicadores. This paper develops a model based on agency theory to analyze road management systems (under the different contract forms available today) that employ a mechanism of performance indicators to establish the payment of the agent. The base assumption is that of asymmetric information between the principal (Public Authorities) and the agent (contractor) and the risk aversion of this latter. It is assumed that the principal may only measure the agent?s performance indirectly and by means of certain performance indicators that may be verified by the authorities. In this model there is presumed to be a relation between the efforts made by the agent and the performance level measured by the corresponding indicators, though it is also considered that there may be dispersion between both variables that gives rise to a certain degree of randomness in the contract. An analysis of the optimal contract has been made on the basis of this model and in accordance with a series of parameters that characterize the economic environment and the particular conditions of road infrastructure. As a result of the analysis made, it is considered that an optimal contract should generally combine a fixed component and a payment in accordance with the performance level obtained. The higher the risk aversion of the agent and the greater the marginal cost of public funds, the lower the impact of this performance-based payment. By way of conclusion, the system of performance indicators should be as broad as possible but should not overweight those indicators that encompass greater randomness in their results.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Los avances tecnológicos actuales que han llevado a una economía globalmente conectada, junto con la creciente tendencia hacia la privatización, globalización y desregulación están dando lugar a nuevos modelos organizativos y a un aumento de la colaboración entre proveedores y clientes, compartiendo información y flujos de proceso. Todo ello ha contribuido directamente a la gran expansión del outsourcing y a que se considere como una herramienta estratégica para las organizaciones. En este entorno y dada la creciente complejidad organizativa, el uso de una metodología para ayudar a la implantación de proyectos de outsourcing se ha convertido en algo casi necesario. En los últimos años se han propuesto algunas metodologías, especialmente para apoyo de las organizaciones cliente de outsourcing, pero no consideramos que sean completas en cuanto a contemplar todos los aspectos necesarios para guiar un proyecto de outsourcing. Es por ello que, en este artículo, proponemos una metodología para gestión de proyectos de outsourcing de TI desde el punto de vista del proveedor que sea completa y fácil de aplicar. Abstract -. Current technological advances that have led to a globally connected economy, together with the increasing trend towards privatization and deregulation, are leading to new organizational models and increased collaboration between suppliers and customers, sharing information and process flows. This has directly contributed to the great expansion of outsourcing, considering it as a strategic tool for organizations. In this environment, and given the increasing organizational complexity, the use of a methodology to assist the implementation of outsourcing projects has become almost necessary. In recent years several methodologies and models have been proposed, especially for supporting client outsourcing organizations, but we do not consider them to be complete, they do not cover all necessary aspects to manage an outsourcing project. That is the reason because we, in this paper, propose a methodology for outsourcing project management from the point of view of the suppliers that was complete and easy to apply.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

El principal objetivo del proyecto es intentar reducir los costes de algunas de las operaciones de vigilancia llevadas a cabo por agencias o instituciones de seguridad. El proyecto consiste en diseñar y desarrollar un sistema informático que permita el manejo a distancia de un cuadricóptero a través de un ordenador, utilizando el teclado y visualizando las imágenes recibidas del módulo de la videocámara. Cada cuadricóptero estará compuesto de diferentes módulos y cada módulo tiene una funcionalidad característica. Se desarrollará un sistema de gestión de aeronaves para poder añadir nuevas unidades de cuadricópteros, así como un sistema de gestión de usuarios para administrar los usuarios en el sistema. Adicionalmente, se construirá un prototipo de cuadricóptero y se implementará su unidad controladora para poder realizar las pruebas del sistema desarrollado con ello. ---ABSTRACT---The aim of this project is to attempt to reduce the costs of some surveillance services offered by security agencies or institutions. The project consists in designing and developing a computer system to remotely control a drone or quad-copter through a computer, manipulating the drone through the keyboard and watching the images captured from the camera module. Each drone is built with one or more modules, and each module has its own functionality. Both new drones and new users can be added to the computer system through the drone management system and the user management system, respectively. Both of management systems are going to be developed. The project also includes the making of a quad-copter prototype and a controller unit implementation.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

La tendencia actual de las redes de telecomunicaciones conduce a pensar en un futuro basado en el concepto emergente de las Smart Cities¸ que tienen como objetivo el desarrollo urbano basado en un modelo de sostenibilidad que responda a las necesidades crecientes de las ciudades. Dentro de las Smart Cities podemos incluir el concepto de Smart Grid, el cual está referido a sistemas de administración y producción de energía eficientes, que permitan un sistema energético sostenible, y que den cabida a las fuentes de energía renovables. Sistemas de este tipo se muestran a los usuarios como un conjunto de servicios con los que interactuar sin ser tan sólo un mero cliente, sino un agente más del entorno energético. Por otro lado, los sistemas de software distribuidos son cada vez más comunes en una infraestructura de telecomunicaciones cada vez más extensa y con más capacidades. Dentro de este ámbito tecnológico, las arquitecturas orientadas a servicios han crecido exponencialmente sobre todo en el sector empresarial. Con sistemas basados en estas arquitecturas, se pueden ofrecer a empresas y usuarios sistemas software basados en el concepto de servicio. Con la progresión del hardware actual, la miniaturización de los equipos es cada vez mayor, sin renunciar por ello a la potencia que podemos encontrar en sistemas de mayor tamaño. Un ejemplo es el dispositivo Raspberry Pi, que contiene un ordenador plenamente funcional contenido en el tamaño de una cajetilla de tabaco, y con un coste muy reducido. En este proyecto se pretenden aunar los tres conceptos expuestos. De esta forma, se busca utilizar el dispositivo Raspberry Pi como elemento de despliegue integrado en una arquitectura de Smart Grid orientada a servicios. En los trabajos realizados se ha utilizado la propuesta definida por el proyecto de I+D europeo e-GOTHAM, con cuya infraestructura se ha tenido ocasión de realizar diferentes pruebas de las descritas en esta memoria. Aunque esta arquitectura está orientada a la creación de una Smart Grid, lo experimentado en este PFG podría encajar en otro tipo de aplicaciones. Dentro del estudio sobre las soluciones software actuales, se ha trabajado en la evaluación de la posibilidad de instalar un Enterprise Service Bus en el Raspberry Pi y en la optimización de la citada instalación. Una vez conseguida una instalación operativa, se ha desarrollado un controlador de un dispositivo físico (sensor/actuador), denominado Dispositivo Lógico, a modo de prueba de la viabilidad del uso del Raspberry Pi para actuar como elemento en el que instalar aplicaciones en entornos de Smart Grid o Smart Home. El éxito logrado con esta experimentación refuerza la idea de considerar al Raspberry Pi, como un importante elemento a tener en cuenta para el despliegue de servicios de Smart Cities o incluso en otros ámbitos tecnológicos. ABSTRACT. The current trend of telecommunication networks lead to think in a future based on the emerging concept of Smart Cities, whose objective is to ensure the urban development based on a sustainable model to respond the new necessities of the cities. Within the Smart cites we can include the concept of Smart Grid, which is based on management systems and efficient energy production, allowing a sustainable energy producing system, and that includes renewable energy sources. Systems of this type are shown to users as a set of services that allow users to interact with the system not only as a single customer, but also as other energy environment agent. Furthermore, distributed software systems are increasingly common in a telecommunications infrastructure more extensive and with more capabilities. Within this area of technology, service-oriented architectures have grown exponentially especially in the business sector. With systems based on these architectures, can be offered to businesses and users software systems based on the concept of service. With the progression of the actual hardware, the miniaturization of computers is increasing, without sacrificing the power of larger systems. An example is the Raspberry Pi, which contains a fully functional computer contained in the size of a pack of cigarettes, and with a very low cost. This PFG (Proyecto Fin de Grado) tries to combine the three concepts presented. Thus, it is intended to use the Raspberry Pi device as a deployment element integrated into a service oriented Smart Grid architecture. In this PFG, the one proposed in the European R&D e-GOTHAM project has been observed. In addition several tests described herein have been carried out using the infrastructure of that project. Although this architecture is oriented to the creation of a Smart Grid, the experiences reported in this document could fit into other applications. Within the study on current software solutions, it have been working on assessing the possibility of installing an Enterprise Service Bus in the Raspberry Pi and optimizing that facility. Having achieved an operating installation, it has been developed a driver for a physical device (sensor / actuator), called logical device, for testing the feasibility of using the Raspberry Pi to act as an element in which to install applications in Smart Grid and Smart Home Environments. The success of this experiment reinforces the idea of considering the Raspberry Pi as an important element to take into account in the deployment of Smart Cities services or even in other technological fields.

Relevância:

90.00% 90.00%

Publicador:

Resumo:

Diversos estudios consideran que las claves para el desarrollo técnico, social y económico de los países en desarrollo, y en especial en África, son la educación, la investigación y la innovación. No obstante, en el ámbito sanitario en particular, la formación e investigación en África sigue siendo escasa por diversos motivos. Por un lado, los investigadores africanos encuentran dificultades añadidas para obtener financiación frente a investigadores en países de desarrollo. Y, por otro lado, los investigadores no disponen de las herramientas y tecnologías adecuadas para acceder a información relevante para su trabajo. En este contexto, el proyecto AFRICA BUILD tiene como principal objetivo mejorar y fomentar la investigación y educación sanitaria en África a través de las nuevas tecnologías. Uno de los resultados principales de este proyecto es el AFRICA BUILD Portal (ABP), que pretende ser un punto de encuentro para los investigadores africanos, donde podrán encontrar un amplio abanico de herramientas que les permita no sólo mejorar su educación, sino compartir conocimientos con otros investigadores. Este portal, que está actualmente en desarrollo, pretende fomentar la comunicación entre instituciones africanas y les proveerá herramientas biomédicas avanzadas. En este Trabajo de Fin de Grado se han marcado como principal objetivo la mejora del sistema de e-learning que existía en el ABP. El nuevo sistema será: (i) más potente, óptimo y rico en funcionalidades, (ii) tendrá una importante base social permitiendo a los usuarios aportar información y compartir conocimiento, y (iii) será distribuido y escalable, capaz de integrar distintos gestores de contenidos didácticos como fuentes de información. Los resultados obtenidos son positivos y el nuevo sistema de aprendizaje ha mejorado la usabilidad, funcionalidad y apariencia del anterior. Para concluir, la herramienta posee aún un gran margen de mejora, pero gracias al trabajo realizado el sistema de e-learning es ahora más social, distribuido, escalable e innovador. ---ABSTRACT---Several studies find that the keys to the technical, social and economic development of developing countries, especially in Africa, are education, research and innovation. However, in the health sector in particular, training and research in Africa remains low for various reasons. On the one hand, African researchers experience additional difficulties for funding against researchers in developing countries. And on the other hand, researchers do not have the right tools and technologies to access information relevant to their work. In this context, the AFRICA BUILD project's main objective is to improve and enhance research and health education in Africa through new technologies. One of the main results of this project is the AFRICA BUILD Portal (ABP), which aims to be a meeting point for African researchers, where they can find a wide range of tools that allows them to not only improve their education but to share knowledge with other researchers. This portal, which is currently under development, aims to promote communication between African institutions and will provide advanced biomedical tools. The main objective of this Final Year Project is the improvement of the former elearning system that already existed in the ABP. The new system will be: (i) more powerful, richer in features, (ii) will have an important social base allowing users to contribute information and knowledge sharing; and (iii) will be distributed and scalable, capable of integrating different learning management systems as sources of information. The final results obtained are fairly positive and the new e-learning system has improved its usability, functionality and appearance of the former. To conclude, the tool still has much room for improvement, but thanks to the new features of the improved elearning system has become more social, distributed, scalable and innovative.