912 resultados para Project 2001-010-C : Investment Decision Framework for Infrastructure Asset Management


Relevância:

60.00% 60.00%

Publicador:

Resumo:

The Federal Highway Administration (FHWA) approves the selection of the Reconstruction of All or Part of the Interstate (Construction Alternative) as the Preferred Alternative to provide improvements to the interstate system in the Omaha/Council Bluffs metropolitan area, extending across the Missouri River on Interstate 80 to east of the Interstate 480 interchange in Omaha, Nebraska. The study considered long-term, broad-based transportation improvements along Interstate I-29 (I-29), I-80, and I-480, including approximately 18 mainline miles of interstate and 14 interchanges (3 system, 11 service), that would add capacity and correct functional issues along the mainline and interchanges and upgrade the I-80 Missouri River Crossing. FHWA also approves the decisions to provide full access between West Broadway and I-29, design the I-80/I-29 overlap section as a dual-divided freeway, and locating the new I-80 Missouri River Bridge north of the existing bridge. Improvements to the interstate system, once implemented, would bring the segments of I-80 and I-29 (see Figure 1) up to current engineering standards and accommodate future traffic needs. This Record of Decision (ROD) concludes Tier 1 of the Council Bluffs Interstate System (CBIS) Improvements Project. Tier 1 included an examination of the area’s transportation needs, a study of alternatives to satisfy them, and broad consideration of potential environmental and social impacts. The Tier 1 evaluation consisted of a sufficient level of engineering and environmental detail to assist decision makers in selecting a preferred transportation strategy. During Tier 1 a Draft EIS (FHWA-IA- EIS-04-01D) was developed which was approved by FHWA, Iowa DOT, and Nebraska Department of Roads (NDOR) in November 2004 with comments accepted through March 15, 2005. The Draft EIS summarized the alternatives that were considered to address the transportation needs around Council Bluffs; identified reconstruction of all or part of the interstate, the “Construction Alternative,” as the Preferred Alternative; identified three system-level decisions that needed to be made at the Tier 1 level; and invited comment on the issues. The Final EIS (FHWA-IA- EIS-04-01F) further documented the Construction Alternative as the Preferred Alternative and identified the recommended decisions for the three system level decisions that needed to be made in Tier 1. This ROD defines the Selected Alternative determined in the Tier 1 studies.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The purposes of this report (Phase II of the project) are to specify in mathematical form the individual modules of the conceptual model developed in Phase I, to identify and evaluate sources of data for the model set, and to develop the transport networks necessary to support the models.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

The objective of the thesis is to structure and model the factors that contribute to and can be used in evaluating project success. The purpose of this thesis is to enhance the understanding of three research topics. The goal setting process, success evaluation and decision-making process are studied in the context of a project, business unitand its business environment. To achieve the objective three research questionsare posed. These are 1) how to set measurable project goals, 2) how to evaluateproject success and 3) how to affect project success with managerial decisions.The main theoretical contribution comes from deriving a synthesis of these research topics which have mostly been discussed apart from each other in prior research. The research strategy of the study has features from at least the constructive, nomothetical, and decision-oriented research approaches. This strategy guides the theoretical and empirical part of the study. Relevant concepts and a framework are composed on the basis of the prior research contributions within the problem area. A literature review is used to derive constructs of factors withinthe framework. They are related to project goal setting, success evaluation, and decision making. On the basis of this, the case study method is applied to complement the framework. The empirical data includes one product development program, three construction projects, as well as one organization development, hardware/software, and marketing project in their contexts. In two of the case studiesthe analytic hierarchy process is used to formulate a hierarchical model that returns a numerical evaluation of the degree of project success. It has its origin in the solution idea which in turn has its foundation in the notion of projectsuccess. The achieved results are condensed in the form of a process model thatintegrates project goal setting, success evaluation and decision making. The process of project goal setting is analysed as a part of an open system that includes a project, the business unit and its competitive environment. Four main constructs of factors are suggested. First, the project characteristics and requirements are clarified. The second and the third construct comprise the components of client/market segment attractiveness and sources of competitive advantage. Together they determine the competitive position of a business unit. Fourth, the relevant goals and the situation of a business unit are clarified to stress their contribution to the project goals. Empirical evidence is gained on the exploitation of increased knowledge and on the reaction to changes in the business environment during a project to ensure project success. The relevance of a successful project to a company or a business unit tends to increase the higher the reference level of project goals is set. However, normal performance or sometimes performance below this normal level is intentionally accepted. Success measures make project success quantifiable. There are result-oriented, process-oriented and resource-oriented success measures. The study also links result measurements to enablers that portray the key processes. The success measures can be classified into success domains determining the areas on which success is assessed. Empiricalevidence is gained on six success domains: strategy, project implementation, product, stakeholder relationships, learning situation and company functions. However, some project goals, like safety, can be assessed using success measures that belong to two success domains. For example a safety index is used for assessing occupational safety during a project, which is related to project implementation. Product safety requirements, in turn, are connected to the product characteristics and thus to the product-related success domain. Strategic success measures can be used to weave the project phases together. Empirical evidence on their static nature is gained. In order-oriented projects the project phases are oftencontractually divided into different suppliers or contractors. A project from the supplier's perspective can represent only a part of the ¿whole project¿ viewed from the client's perspective. Therefore static success measures are mostly used within the contractually agreed project scope and duration. Proof is also acquired on the dynamic use of operational success measures. They help to focus on the key issues during each project phase. Furthermore, it is shown that the original success domains and success measures, their weights and target values can change dynamically. New success measures can replace the old ones to correspond better with the emphasis of the particular project phase. This adjustment concentrates on the key decision milestones. As a conclusion, the study suggests a combination of static and dynamic success measures. Their linkage to an incentive system can make the project management proactive, enable fast feedback and enhancethe motivation of the personnel. It is argued that the sequence of effective decisions is closely linked to the dynamic control of project success. According to the used definition, effective decisions aim at adequate decision quality and decision implementation. The findings support that project managers construct and use a chain of key decision milestones to evaluate and affect success during aproject. These milestones can be seen as a part of the business processes. Different managers prioritise the key decision milestones to a varying degree. Divergent managerial perspectives, power, responsibilities and involvement during a project offer some explanation for this. Finally, the study introduces the use ofHard Gate and Soft Gate decision milestones. The managers may use the former milestones to provide decision support on result measurements and ad hoc critical conditions. In the latter milestones they may make intermediate success evaluation also on the basis of other types of success measures, like process and resource measures.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

La valoración de una empresa como sistema dinámico es bastante compleja, los diferentes modelos o métodos de valoración son una aproximación teórica y por consiguiente simplificadora de la realidad. Dichos modelos, se aproximan mediante supuestos o premisas estadísticas que nos permiten hacer dicha simplificación, ejemplos de estos, son el comportamiento del inversionista o la eficiencia del mercado. Bajo el marco de un mercado emergente, este proceso presenta de indistinta forma retos paracualquier método de valoración, dado a que el mercado no obedece a los paradigmas tradicionales. Lo anterior hace referencia a que la valoración es aún más compleja, dado que los inversionistas se enfrentan a mayores riesgos y obstáculos. Así mismo, a medida que las economías se globalizan y el capital es más móvil, la valoración tomaráaún más importancia en el contexto citado. Este trabajo de gradopretende recopilar y analizar los diferentes métodos de valoración, además de identificar y aplicar aquellos que se reconocen como “buenas prácticas”. Este proceso se llevó a cabo para una de las empresas más importantes de Colombia, donde fundamentalmente se consideró el contexto de mercado emergente y específicamente el sector petrolero, como criterios para la aplicación del tradicional DCF y el práctico R&V.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

El presente trabajo tiene como finalidad caracterizar conceptos y elementos clave del caos y de la complejidad existente en la relación entre las organizaciones y la comunidad. Esta relación parte de la base de satisfacer las necesidades de los actores involucrados y, así mismo, mejorar el desempeño de cada uno, y contribuir al bienestar de la sociedad y a la perdurabilidad de las empresas. Para alcanzar el objetivo planteado, inicialmente se hace necesario contextualizar conceptos que estarán presentes durante todo el escrito. Por esto se expondrán términos como teoría de la complejidad, teoría del caos, los aspectos más representativos de la relación comunitaria y el marketing y su impacto en las comunidades. La teoría de la complejidad permitirá entender los sistemas como un todo, en donde las relaciones e interacciones de cada una de sus diferentes partes nos conducen a innumerables escenarios posibles. También se buscará entender la importancia de la relación organización-comunidad, ya que la comunidad puede jugar un papel determinante cuando las organizaciones se adaptan a los cambios. Es de suma importancia establecer relaciones estratégicas con la comunidad, entendiendo a la comunidad como un sistema o grupo social con determinadas características, que permitan tanto a las organizaciones como a la misma comunidad entender, comprender y satisfacer eficazmente las necesidades subyacentes y, así, llegar a establecer un entorno de retroalimentación continua y sostenibilidad a lo largo del tiempo. Actualmente, el funcionamiento del mundo ha cambiado en cierta medida, ya que antes la base del conocimiento se centraba en función del orden y la regularidad. Ahora, en cambio, se destaca la creatividad y la dinámica que son causadas por el desorden y la irregularidad presentes en los sistemas. El mundo se plantea como un grupo de innumerables sistemas auto-organizados, donde su funcionamiento puede provocar resultados impredecibles o aleatorios. La materia de complejidad en los sistemas se ha desarrollado por diferentes autores según aproximaciones desde diferentes ramas de la ciencia, como la cibernética, basada en los mecanismos de retroalimentación y control; desde la teoría general de los sistemas, que da énfasis en el dinamismo presente en los sistemas y cómo la organización está presente en su estructura. En el presente proyecto se realizará un estudio de tipo teórico-conceptual: se seleccionarán las bases de datos, fuentes de información y los documentos más representativos o que proporcionen la mayor información posible que permita el completo entendimiento de la investigación y de sus alcances propuestos. Es así que esta investigación busca aportar más elementos dentro de los diferentes estudios que pretenden explicar y mejorar la perdurabilidad de las empresas bajo las diferentes líneas de investigación. A través del tiempo, el GIPE ha ido evolucionando de acuerdo con los resultados de las investigaciones y se ha centrado en cuatro líneas de investigación: Liderazgo, Realidad, Estrategia y Gerencia. El proyecto de investigación “Relación de las organizaciones con el medio y marketing” hace parte de la línea de gerencia y busca identificar oportunidades gerenciales para las organizaciones que las acerquen al conocimiento y manejo de las áreas funcionales (Facultad de Administración, 2013). Además, el proyecto se adentra en las organizaciones en entornos complejos y su relación con la comunidad, y se observa así la organización como un ser vivo que contribuye al bienestar de la sociedad que, finalmente, es lo que garantiza su perdurabilidad.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Land cover maps at different resolutions and mapping extents contribute to modeling and support decision making processes. Because land cover affects and is affected by climate change, it is listed among the 13 terrestrial essential climate variables. This paper describes the generation of a land cover map for Latin America and the Caribbean (LAC) for the year 2008. It was developed in the framework of the project Latin American Network for Monitoring and Studying of Natural Resources (SERENA), which has been developed within the GOFC-GOLD Latin American network of remote sensing and forest fires (RedLaTIF). The SERENA land cover map for LAC integrates: 1) the local expertise of SERENA network members to generate the training and validation data, 2) a methodology for land cover mapping based on decision trees using MODIS time series, and 3) class membership estimates to account for pixel heterogeneity issues. The discrete SERENA land cover product, derived from class memberships, yields an overall accuracy of 84% and includes an additional layer representing the estimated per-pixel confidence. The study demonstrates in detail the use of class memberships to better estimate the area of scarce classes with a scattered spatial distribution. The land cover map is already available as a printed wall map and will be released in digital format in the near future. The SERENA land cover map was produced with a legend and classification strategy similar to that used by the North American Land Change Monitoring System (NALCMS) to generate a land cover map of the North American continent, that will allow to combine both maps to generate consistent data across America facilitating continental monitoring and modeling