912 resultados para Power systems reliability
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
This paper deals with approaches for sparse matrix substitutions using vector processing. Many publications have used the W-matrix method to solve the forward/backward substitutions on vector computer. Recently a different approach has been presented using dependency-based substitution algorithm (DBSA). In this paper the focus is on new algorithms able to explore the sparsity of the vectors. The efficiency is tested using linear systems from power systems with 118, 320, 725 and 1729 buses. The tests were performed on a CRAY Y MP2E/232. The speedups for a fast-forward/fast-backward using a 1729-bus system are near 19 and 14 for real and complex arithmetic operations, respectively. When forward/backward is employed the speedups are about 8 and 6 to perform the same simulations.
Resumo:
This article presents a well-known interior point method (IPM) used to solve problems of linear programming that appear as sub-problems in the solution of the long-term transmission network expansion planning problem. The linear programming problem appears when the transportation model is used, and when there is the intention to solve the planning problem using a constructive heuristic algorithm (CHA), ora branch-and-bound algorithm. This paper shows the application of the IPM in a CHA. A good performance of the IPM was obtained, and then it can be used as tool inside algorithm, used to solve the planning problem. Illustrative tests are shown, using electrical systems known in the specialized literature. (C) 2005 Elsevier B.V. All rights reserved.
Resumo:
This work presents a neural network based on the ART architecture ( adaptive resonance theory), named fuzzy ART& ARTMAP neural network, applied to the electric load-forecasting problem. The neural networks based on the ARTarchitecture have two fundamental characteristics that are extremely important for the network performance ( stability and plasticity), which allow the implementation of continuous training. The fuzzy ART& ARTMAP neural network aims to reduce the imprecision of the forecasting results by a mechanism that separate the analog and binary data, processing them separately. Therefore, this represents a reduction on the processing time and improved quality of the results, when compared to the Back-Propagation neural network, and better to the classical forecasting techniques (ARIMA of Box and Jenkins methods). Finished the training, the fuzzy ART& ARTMAP neural network is capable to forecast electrical loads 24 h in advance. To validate the methodology, data from a Brazilian electric company is used. (C) 2004 Elsevier B.V. All rights reserved.
Resumo:
The paper presents a method for security control of electric power systems effected by generation reallocation, determined by sensitivity analysis and optimisation. The model is developed considering the dynamic aspects of the network (transient stability). Security control methodology is developed using sensitivity analysis of the security margin in relation to the mechanical power of synchronous machines in the system. The power reallocated to each machine is determined by means of linear programming. To illustrate the proposed methodology, an example is presented which considers a multimachine system composed of 10 synchronous machines, 45 buses, and 72 transmission lines, based on the configuration of a southern Brazilian system.
Resumo:
This work proposes a methodology to generalize the Y-connections for 12- and 18-pulse autotransformers. A single mathematical expression, obtained through simple trigonometric operations, represents all the connections. The proposed methodology allows choosing any ratio between the input and the output voltages. The converters can operate either as step-up or as step-down voltage. To simplify the design of the windings, graphics are generated to calculate the turn-ratio and the polarity of each secondary winding, with respect to the primary winding. A design example, followed by digital simulations, illustrates the presented steps. Experimental results of two prototypes (12 and 18 pulses) are presented. The results also show that high power factor is an inherent characteristic of multi-pulse converters, without any active or passive power factor pre-regulators needs. (c) 2005 Elsevier B.V. All rights reserved.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
O método de fluxo de carga convencional é considerado inadequado para se obter o ponto de máximo carregamento (PMC) de sistemas de potência, devido à singularidade da matriz Jacobiana neste ponto. Os métodos da continuação são ferramentas eficientes para a solução deste tipo de problema, visto que técnicas de parametrização podem ser utilizadas para evitar a singularidade da matriz Jacobiana. Neste trabalho, novas opções para a etapa de parametrização do método da continuação são apresentadas. Mostra-se que variáveis com claro significado físico podem ser utilizadas na etapa de parametrização. As seguintes variáveis foram testadas: perda total de potência ativa e reativa, potência ativa e reativa na barra de referência, potência reativa das barras de geração, e as perdas de potência ativa e reativa nas linhas de transmissão (LT). Além de facilitar a implementação computacional do método de continuação, as técnicas de parametrização apresentadas simplificam a definição matemática e o entendimento do método por parte de engenheiros de potência, visto que os métodos de continuação existentes na literatura sempre utilizam técnicas de parametrização complexas, e de interpretação puramente geométrica. Resultados obtidos com a nova metodologia para os sistemas testes do IEEE (14, 30, 57 e 118 barras) mostram que as características de convergência do método de fluxo de carga convencional são melhoradas na região do PMC. Além disso, durante o traçado das curvas PV, as diversas técnicas de parametrização podem ser comutadas entre si possibilitando o cálculo de todos os pontos da curva com um número reduzido de iterações. Diversos testes são realizados para proporcionar a comparação do desempenho dos esquemas de parametrização propostos.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)
Resumo:
A constructive heuristic algorithm (CHA) to solve distribution system planning (DSP) problem is presented. The DSP is a very complex mixed binary nonlinear programming problem. A CHA is aimed at obtaining an excellent quality solution for the DSP problem. However, a local improvement phase and a branching technique were implemented in the CHA to improve its solution. In each step of the CHA, a sensitivity index is used to add a circuit or a substation to the distribution system. This sensitivity index is obtained by solving the DSP problem considering the numbers of circuits and substations to be added as continuous variables (relaxed problem). The relaxed problem is a large and complex nonlinear programming and was solved through an efficient nonlinear optimization solver. Results of two tests systems and one real distribution system are presented in this paper in order to show the ability of the proposed algorithm.
Resumo:
Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP)
Resumo:
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES)