874 resultados para Parallel inverters
Resumo:
A novel cryptography method based on the Lorenz`s attractor chaotic system is presented. The proposed algorithm is secure and fast, making it practical for general use. We introduce the chaotic operation mode, which provides an interaction among the password, message and a chaotic system. It ensures that the algorithm yields a secure codification, even if the nature of the chaotic system is known. The algorithm has been implemented in two versions: one sequential and slow and the other, parallel and fast. Our algorithm assures the integrity of the ciphertext (we know if it has been altered, which is not assured by traditional algorithms) and consequently its authenticity. Numerical experiments are presented, discussed and show the behavior of the method in terms of security and performance. The fast version of the algorithm has a performance comparable to AES, a popular cryptography program used commercially nowadays, but it is more secure, which makes it immediately suitable for general purpose cryptography applications. An internet page has been set up, which enables the readers to test the algorithm and also to try to break into the cipher.
Resumo:
We present parallel algorithms on the BSP/CGM model, with p processors, to count and generate all the maximal cliques of a circle graph with n vertices and m edges. To count the number of all the maximal cliques, without actually generating them, our algorithm requires O(log p) communication rounds with O(nm/p) local computation time. We also present an algorithm to generate the first maximal clique in O(log p) communication rounds with O(nm/p) local computation, and to generate each one of the subsequent maximal cliques this algorithm requires O(log p) communication rounds with O(m/p) local computation. The maximal cliques generation algorithm is based on generating all maximal paths in a directed acyclic graph, and we present an algorithm for this problem that uses O(log p) communication rounds with O(m/p) local computation for each maximal path. We also show that the presented algorithms can be extended to the CREW PRAM model.
Resumo:
The InteGrade middleware intends to exploit the idle time of computing resources in computer laboratories. In this work we investigate the performance of running parallel applications with communication among processors on the InteGrade grid. As costly communication on a grid can be prohibitive, we explore the so-called systolic or wavefront paradigm to design the parallel algorithms in which no global communication is used. To evaluate the InteGrade middleware we considered three parallel algorithms that solve the matrix chain product problem, the 0-1 Knapsack Problem, and the local sequence alignment problem, respectively. We show that these three applications running under the InteGrade middleware and MPI take slightly more time than the same applications running on a cluster with only LAM-MPI support. The results can be considered promising and the time difference between the two is not substantial. The overhead of the InteGrade middleware is acceptable, in view of the benefits obtained to facilitate the use of grid computing by the user. These benefits include job submission, checkpointing, security, job migration, etc. Copyright (C) 2009 John Wiley & Sons, Ltd.
Resumo:
Relevant results for (sub-)distribution functions related to parallel systems are discussed. The reverse hazard rate is defined using the product integral. Consequently, the restriction of absolute continuity for the involved distributions can be relaxed. The only restriction is that the sets of discontinuity points of the parallel distributions have to be disjointed. Nonparametric Bayesian estimators of all survival (sub-)distribution functions are derived. Dual to the series systems that use minimum life times as observations, the parallel systems record the maximum life times. Dirichlet multivariate processes forming a class of prior distributions are considered for the nonparametric Bayesian estimation of the component distribution functions, and the system reliability. For illustration, two striking numerical examples are presented.
Resumo:
We investigate the isoperimetric problem of finding the regions of prescribed volume with minimal boundary area between two parallel horospheres in hyperbolic 3-space (the part of the boundary contained in the horospheres is not included). We reduce the problem to the study of rotationally invariant regions and obtain the possible isoperimetric solutions by studying the behavior of the profile curves of the rotational surfaces with constant mean curvature in hyperbolic 3-space. We also classify all the connected compact rotational surfaces M of constant mean curvature that are contained in the region between two horospheres, have boundary partial derivative M either empty or lying on the horospheres, and meet the horospheres perpendicularly along their boundary.
Resumo:
The present work will explain a method to achieve a remote controlled (via IR LED) alphanumeric Liquid Crystal Display. In modern times, the remote access of different devices has become quite popular, therefore, the aim of this project is to provide a useful tool that will integrate common and easy to access devices. The system includes a C language based user interface, an assembly language code for the AT89C51ED2 microcontroller instructions and some digital electronic circuits needed for the driving and control of both the LCD and the infrared communication, as well as the PC with a parallel port. The interaction of all the devices provides a whole system that can be helpful in different applications, or it can be separated into each one of its different stages to take the best advantage as possible.
Resumo:
The aim of this study was to investigate electricity supply solutions for an educationalcenter that is being built in Chonyonyo Tanzania. Off-grid power generation solutions andfurther optimization possibilities were studied for the case.The study was done for Engineers Without Borders in Sweden. Who are working withMavuno Project on the educational center. The school is set to start operating in year 2015with 40 girl students in the beginning. The educational center will help to improve genderequality by offering high quality education in a safe environment for girls in rural area.It is important for the system to be economically and environmentally sustainable. Thearea has great potential for photovoltaic power generation. Thus PV was considered as theprimary power generation and a diesel generator as a reliable backup. The system sizeoptimization was done with HOMER. For the simulations HOMER required componentdata, weather data and load data. Common components were chose with standardproperties, the loads were based on load estimations from year 2011 and the weather datawas acquired from NASA database. The system size optimization result for this base casewas a system with 26 kW PW; 5.5 kW diesel generator, 15 kW converter and 112 T-105batteries. The initial cost of the system was 55 875 €, the total net present cost 92 121 €and the levelized cost of electricity 0.264 €/kWh.In addition three optimization possibilities were studied. First it was studied how thesystem should be designed and how it would affect the system size to have night loads(security lights) use DC and could the system then be extended in blocks. As a result it wasfound out that the system size could be decreased as the inverter losses would be avoided.Also the system extension in blocks was found to be possible. The second study was aboutinverter stacking where multiple inverters can work as one unit. This type of connectionallows only the required number of inverters to run while shutting down the excess ones.This would allow the converter-unit to run with higher efficiency and lower powerconsumption could be achieved. In future with higher loads the system could be easilyextendable by connecting more inverters either in parallel or series depending on what isneeded. Multiple inverters would also offer higher reliability than using one centralizedinverter. The third study examined how the choice of location for a centralized powergeneration affects the cable sizing for the system. As a result it was found that centralizedpower generation should be located close to high loads in order to avoid long runs of thickcables. Future loads should also be considered when choosing the location. For theeducational center the potential locations for centralized power generation were found outto be close to the school buildings and close to the dormitories.