820 resultados para Management by objectives.
Resumo:
This report details an evaluation of the My Choice Weight Management Programme undertaken by a research team from the School of Pharmacy at Aston University. The My Choice Weight Management Programme is delivered through community pharmacies and general practitioners (GPs) contracted to provide services by the Heart of Birmingham teaching Primary Care Trust. It is designed to support individuals who are ‘ready to change’ by enabling the individual to work with a trained healthcare worker (for example, a healthcare assistant, practice nurse or pharmacy assistant) to develop a care plan designed to enable the individual to lose 5-10% of their current weight. The Programme aims to reduce adult obesity levels; improve access to overweight and obesity management services in primary care; improve diet and nutrition; promote healthy weight and increased levels of physical activity in overweight or obese patients; and support patients to make lifestyle changes to enable them to lose weight. The Programme is available for obese patients over 18 years old who have a Body Mass Index (BMI) greater than 30 kg/m2 (greater than 25 kg/m2 in Asian patients) or greater than 28 kg/m2 (greater than 23.5 kg/m2 in Asian patients) in patients with co-morbidities (diabetes, high blood pressure, cardiovascular disease). Each participant attends weekly consultations over a twelve session period (the final iteration of these weekly sessions is referred to as ‘session twelve’ in this report). They are then offered up to three follow up appointments for up to six months at two monthly intervals (the final of these follow ups, taking place at approximately nine months post recruitment, is referred to as ‘session fifteen’ in this report). A review of the literature highlights the dearth of published research on the effectiveness of primary care- or community-based weight management interventions. This report may help to address this knowledge deficit. A total of 451 individuals were recruited on to the My Choice Weight Management Programme. More participants were recruited at GP surgeries (n=268) than at community pharmacies (n=183). In total, 204 participants (GP n=102; pharmacy n=102) attended session twelve and 82 participants (GP n=22; pharmacy 60) attended session fifteen. The unique demographic characteristics of My Choice Weight Management Programme participants – participants were recruited from areas with high levels of socioeconomic deprivation and over four-fifths of participants were from Black and Minority Ethnic groups; populations which are traditionally underserved by healthcare interventions – make the achievements of the Programme particularly notable. The mean weight loss at session 12 was 3.8 kg (equivalent to a reduction of 4.0% of initial weight) among GP surgery participants and 2.4 kg (2.8%) among pharmacy participants. At session 15 mean weight loss was 2.3 kg (2.2%) among GP surgery participants and 3.4 kg (4.0%) among pharmacy participants. The My Choice Weight Management Programme improved the general health status of participants between recruitment and session twelve as measured by the validated SF-12 questionnaire. While cost data is presented in this report, it is unclear which provider type delivered the Programme more cost-effectively. Attendance rates on the Programme were consistently better among pharmacy participants than among GP participants. The opinions of programme participants (both those who attended regularly and those who failed to attend as expected) and programme providers were explored via semi-structured interviews and, in the case of the participants, a selfcompletion postal questionnaire. These data suggest that the Programme was almost uniformly popular with both the deliverers of the Programme and participants on the Programme with 83% of questionnaire respondents indicating that they would be happy to recommend the Programme to other people looking to lose weight. Our recommendations, based on the evidence provided in this report, include: a. Any consideration of an extension to the study also giving comparable consideration to an extension of the Programme evaluation. The feasibility of assigning participants to a pharmacy provider or a GP provider via a central allocation system should also be examined. This would address imbalances in participant recruitment levels between provider type and allow for more accurate comparison of the effectiveness in the delivery of the Programme between GP surgeries and community pharmacies by increasing the homogeneity of participants at each type of site and increasing the number of Programme participants overall. b. Widespread dissemination of the findings from this review of the My Choice Weight Management Project should be undertaken through a variety of channels. c. Consideration of the inclusion of the following key aspects of the My Choice Weight Management Project in any extension to the Programme: i. The provision of training to staff in GP surgeries and community pharmacies responsible for delivery of the Programme prior to patient recruitment. ii. Maintaining the level of healthcare staff input to the Programme. iii. The regular schedule of appointments with Programme participants. iv. The provision of an increased variety of printed material. d. A simplification of the data collection method used by the Programme commissioners at the individual Programme delivery sites.
Resumo:
In construction projects, the aim of project control is to ensure projects finish on time, within budget, and achieve other project objectives. During the last few decades, numerous project control methods have been developed and adopted by project managers in practice. However, many existing methods focus on describing what the processes and tasks of project control are; not on how these tasks should be conducted. There is also a potential gap between principles that underly these methods and project control practice. As a result, time and cost overruns are still common in construction projects, partly attributable to deficiencies of existing project control methods and difficulties in implementing them. This paper describes a new project cost and time control model, the project control and inhibiting factors management (PCIM) model, developed through a study involving extensive interaction with construction practitioners in the UK, which better reflects the real needs of project managers. A set of good practice checklist is also developed to facilitate implementation of the model. © 2013 American Society of Civil Engineers.
Resumo:
The thesis begins with a conceptual model of the way that language diversity affects the strategies, organisation and subsidiary control policies of multinational companies. The model is based solely on the researcher'’ personal experience of working in a variety of international management roles, but in Chapter 2 a wide-ranging review of related academic literature finds evidence to support the key ideas. The model is developed as a series of propositions which are tested in a comparative case study, refined and then re-tested in a global survey of multinational subsidiaries. The principal findings of the empirical phases of the thesis endorse the main tenets of the model: - That language difference between parent and subsidiary will impair communication, create mistrust and impede relationship development. - That subsequently the feelings of uncertainty, suspicion and mistrust will influence the decisions taken by the parent company. - They will have heightened sensitivity to language issues and will implement policies to manage language differences. - They will adopt low-risk strategies in host countries where they are concerned about language difference. - They will use organisational and manpower strategies to minimise the consequences and risks of the communications problems with the subsidiary. - As a consequence the level of integration and knowledge flow between parent and subsidiary will be curtailed. - They will adopt styles of control that depend least on their ability to communicate with their subsidiary. Although there is adequate support for all of the above conclusions, on some key points the evidence of the Case Studies and Survey is contradictory. The thesis, therefore, closes with an agenda for further research that would address these inconsistencies.
Resumo:
This thesis considers management decision making at the ward level in hospitals especially by ward sisters, and the effectiveness of the intervention of a decision support system. Nursing practice theories were related to organisation and management theories in order to conceptualise a decision making framework for nurse manpower planning and deployment at the ward level. Decision and systems theories were explored to understand the concepts of decision making and the realities of power in an organisation. In essence, the hypothesis was concerned with changes in patterns of decision making that could occur with the intervention of a decision support system and that the degree of change would be governed by a set of `difficulty' factors within wards in a hospital. During the course of the study, a classification of ward management decision making was created, together with the development and validation of measuring instruments to test the research hypothesis. The decision support system used was rigorously evaluated to test whether benefits did accrue from its implementation. Quantitative results from sample wards together with qualitative information collected, were used to test this hypothesis and the outcomes postulated were supported by these findings. The main conclusion from this research is that a more rational approach to management decision making is feasible, using information from a decision support system. However, wards and ward sisters that need the most assistance, where the `difficulty' factors in the organisation are highest, benefit the least from this type of system. Organisational reviews are needed on these identified wards, involving managers and doctors, to reduce the levels of un-coordinated activities and disruption.
Resumo:
This research is an Anglo-Indian comparative case study. It studies managerial action in the participation arena of two British multi-nationals i.e. Cadbury Limited and ICI plc. The research was carried out in matched pairs of factories of the above named companies, located in the Midlands of the UK and in Bombay in India. The data for this research was collected through semi-structured interviews with managers and non-management actors, study of company documents and non-participant observation of some participation forums. The research conceptualises the idea of a `participation arena' consisting of the structures, processes, purposes and dynamics of participation. This arena is visualised as broadly reflecting the organisation structure and can be divided into corporate, unit and shopfloor level. Managerial action in this arena is examined in terms of interaction between three sets of factors i.e. company business objectives, strategies and policies; managerial values of power and control; and the responses of unions. Similarities and differences between management action in the home and host plants of the two multi-national companies are also examined. The major findings of the research are as follows. There is significant difference between the participation arena of the parent and the subsidiary company. The latter is marked by absence of higher level participation forums and lack of opportunity for employees to discuss, let alone influence, key decisions. This results from parent company control over key activities of the subsidiary. The similarities in management action in the participation arenas of the two companies in both countries can be attributed to the operation of the three sets of factors mentioned above. Nevertheless, the particular circumstances of each company are a greater influence on managerial action than the national context. Finally, future areas of research in this field are explored.
Resumo:
Case studies in copper-alloy rolling mill companies showed that existing planning systems suffer from numerous shortcomings. Where computerised systems are in use, these tend to simply emulate older manual systems and still rely heavily on modification by experienced planners on the shopfloor. As the size and number of orders increase, the task of process planners, while seeking to optimise the manufacturing objectives and keep within the production constraints, becomes extremely complicated because of the number of options for mixing or splitting the orders into batches. This thesis develops a modular approach to computerisation of the production management and planning functions. The full functional specification of each module is discussed, together with practical problems associated with their phased implementation. By adapting the Distributed Bill of Material concept from Material Requirements Planning (MRP) philosophy, the production routes generated by the planning system are broken down to identify the rolling stages required. Then to optimise the use of material at each rolling stage, the system generates an optimal cutting pattern using a new algorithm that produces practical solutions to the cutting stock problem. It is shown that the proposed system can be accommodated on a micro-computer, which brings it into the reach of typical companies in the copper-alloy rolling industry, where profit margins are traditionally low and the cost of widespread use of mainframe computers would be prohibitive.
A comparison of U.S. and Japanese management systems and their transferability to Singapore industry
Resumo:
This research compares U.S. and Japanese management systems and evaluates their transferability to the Singaporean manufacturing industry. The objectives were:- a) To determine the effectiveness of U.S. and Japanese management systems when applied to Singapore. b) Determine the extent of transferability of U.S. and Japanese management systems to Singapore. c) Survey general problems ecountered in the application of U.S. and Japanese management systems to the Singapore industry. The study using questionnaire survey and interviews covered a total of eighty companies from four groups of firms in four industrial sectors comprising of U.S. and Japanese subsidiaries based in Singapore and their respective parent companies. Data from the questionnaires and interviews were used to investigate environmental conditions, management philosophy, management functions/practices, management effectiveness, and firm productivity. Two-way analysis of variance was used to analyse the questionnaire data. The analysis of the perceptual data from the questionnaire survey and interviews suggested that both U.S. and Japanese parent companies performed better in almost all the management variables studied when compared to their subsidiaries in Singapore. U.S. subsidiaries have less difficulty in adjusting to the Singapore environmental conditions and obtained better results than the Japanese subsidiaries in management functions/practices and management philosophy than the U.S. subsidiaries. In addition, the firm productivity (in terms of labour and capital productivity) of U.S. subsidiaries in Singapore was found to be higher than those of the Japanese subsidiaries. It was found that the Japanese parent companies returned the highest score among the four groups of firms in all the four industrial sectors for all the four management variables (i.e. environmental conditions, management philosophy, management functions/practices, and management effectiveness) surveyed using questionnaires. In contrast, the average score for Japanese subsidiaries in Singapore was generally the lowest among the four groups of firms. Thus the results of this study suggest that the transfer of U.S. management system into the Singapore industry is more successful than the Japanese management system. The problems encountered in the application of U.S. and Japanese management in Singapore were identified and discussed by the study. General recommendations for the Singaporean manufacturing industry were then made based on the findings of the questionnaire survey and interview analysis.
Resumo:
In recent years the topic of risk management has moved up the agenda of both government and industry, and private sector initiatives to improve risk and internal control systems have been mirrored by similar promptings for change in the public sector. Both regulators and practitioners now view risk management as an integral part of the process of corporate governance, and an aid to the achievement of strategic objectives. The paper uses case study material on the risk management control system at Birmingham City Council to extend existing theory by developing a contingency theory for the public sector. The case demonstrates that whilst the structure of the control system fits a generic model, the operational details indicate that controls are contingent upon three core variables—central government policies, information and communication technology and organisational size. All three contingent variables are suitable for testing the theory across the broader public sector arena.
Resumo:
Biomass is projected to account for approximately half of the new energy production required to achieve the 2020 primary energy target in the UK. Combined heat and power (CHP) bioenergy systems are not only a highly efficient method of energy conversion, at smaller-scales a significant proportion of the heat produced can be effectively utilised for hot water, space heating or industrial heating purposes. However, there are many barriers to project development and this has greatly inhibited deployment in the UK. Project viability is highly subjective to changes in policy, regulation, the finance market and the low cost incumbent; a high carbon centralised energy system. Unidentified or unmitigated barriers occurring during the project lifecycle may not only negatively impact on the project but could ultimately lead to project failure. The research develops a decision support system (DSS) for small-scale (500 kWe to 10 MWe) biomass combustion CHP project development and risk management in the early stages of a potential project’s lifecycle. By supporting developers in the early stages of project development with financial, scheduling and risk management analysis, the research aims to reduce the barriers identified and streamline decision-making. A fuzzy methodology is also applied throughout the developed DSS to support developers in handling the uncertain or approximate information often held at the early stages of the project lifecycle. The DSS is applied to a case study of a recently failed (2011) small-scale biomass CHP project to demonstrate its applicability and benefits. The application highlights that the proposed development within the case study was not viable. Moreover, further analysis of the possible barriers with the DSS confirmed that some possible modifications to be project could have improved this, such as a possible change of feedstock to a waste or residue, addressing the unnecessary land lease cost or by increasing heat utilisation onsite. This analysis is further supported by a practitioner evaluation survey that confirms the research contribution and objectives are achieved.
Resumo:
Risk and knowledge are two concepts and components of business management which have so far been studied almost independently. This is especially true where risk management is conceived mainly in financial terms, as, for example, in the banking sector. The banking sector has sophisticated methodologies for managing risk, such as mathematical risk modeling. However. the methodologies for analyzing risk do not explicitly include knowledge management for risk knowledge creation and risk knowledge transfer. Banks are affected by internal and external changes with the consequent accommodation to new business models new regulations and the competition of big players around the world. Thus, banks have different levels of risk appetite and policies in risk management. This paper takes into consideration that business models are changing and that management is looking across the organization to identify the influence of strategic planning, information systems theory, risk management and knowledge management. These disciplines can handle the risks affecting banking that arise from different areas, but only if they work together. This creates a need to view them in an integrated way. This article sees enterprise risk management as a specific application of knowledge in order to control deviation from strategic objectives, shareholders' values and stakeholders' relationships. Before and after a modeling process it necessary to find insights into how the application of knowledge management processes can improve the understanding of risk and the implementation of enterprise risk management. The article presents a propose methodology to contribute to providing a guide for developing risk modeling knowledge and a reduction of knowledge silos, in order to improve the quality and quantity of solutions related to risk inquiries across the organization.
Resumo:
Purpose - This paper aims to provide empirical results which suggest that there is a need for more widespread adoption of supply chain management among Irish firms. Design/methodology/approach - The Republic of Ireland is a small, open, trade-dependent economy and is one of the fastest growing economies in the developed world. However, due to rising costs, there is an increasing trend in Ireland to outsource lower function manufacturing processes to lower-cost locations but to retain high-skill functions (such as R&D). This trend, together with other factors such as its peripheral location, suggests that supply chain management is critical from an Irish perspective. In order to gain unique insights of current levels of awareness/adoption of SCM and the potential impact SCM could have on competitiveness, a survey was conducted among 776 Irish firms. Findings - Overall, the findings suggest that many firms in Ireland pay lip-service to the importance of SCM elements and objectives but the majority of firms, about two thirds, have only a passing understanding of what constitutes SCM. Only 25 per cent adopt SCM programmes and only 9 per cent of Irish companies have a specialised SCM or logistics manager. The gaps in their understanding of SCM are matched by the gaps in their awareness of key costs (e.g. 59 per cent of companies do not know their total supply chain costs). While there are supply chain management adopters in Ireland that are already well up the s-curve of innovation transfer, it is the larger group of less aware companies that must become better at how they manage their supply chains. Originality/value - The paper offers a useful insight into supply chain management and its role in Irish industry. © Emerald Group Publishing Limited.
Resumo:
The profusion of performance measurement models suggested by Management Accounting literature in the 1990’s is one illustration of the substantial changes in Management Accounting teaching materials since the publication of “Relevance Lost” in 1987. At the same time, in the general context of increasing competition and globalisation it is widely thought that national cultural differences are tending to disappear, meaning that management techniques used in large companies, including performance measurement and management instruments (PMS), tend to be the same, irrespective of the company nationality or location. North American management practice is traditionally described as a contractually based model, mainly focused on financial performance information and measures (FPMs), more shareholder-focused than French companies. Within France, literature historically defined performance as being broadly multidimensional, driven by the idea that there are no universal rules of management and that efficient management takes into account local culture and traditions. As opposed to their North American brethren, French companies are pressured more by the financial institutions that fund them rather than by capital markets. Therefore, they pay greater attention to the long-term because they are not subject to quarterly capital market objectives. Hence, management in France should rely more on long-term qualitative information, less financial, and more multidimensional data to assess performance than their North American counterparts. The objective of this research is to investigate whether large French and US companies’ practices have changed in the way the textbooks have changed with regards to performance measurement and management, or whether cultural differences are still driving differences in performance measurement and management between them. The research findings support the idea that large US and French companies share the same PMS features, influenced by ‘universal’ PM models.
Resumo:
This article argues that, post Enron, governance reforms around the world have served to raise the profile of risk management, and emphasise the need for a corporate wide approach to internal control that is overseen by the Board of Directors. In the US, this is most clearly demonstrated by the emergence of Enterprise Risk Management (ERM), defined as 'a process, effected by an entity's board of directors, management and other personnel, applied in strategy setting across the enterprise, designed to identify potential events that may affect the entity, and manage risk to be within its risk appetite, to provide reasonable assurance regarding the achievement of entity objectives.' (COSO, 2004, p.2). In practical terms, however, the introduction of an enterprise wide holistic risk management system poses a big challenge to all but the smallest of organisations. The financial crisis has clearly shown that enterprise wide risk management remains a dream rather than a reality for even the world's largest and once highly respected companies.
Resumo:
The purpose of this article is to evaluate the effectiveness of learning by doing as a practical tool for managing the training of students in "Library Management" at the ULSIT, Sofia, Bulgaria, by using the creation of project 'Data Base “Bulgarian Revival Towns” (CD), financed by Bulgarian Ministry of Education, Youth and Science (1/D002/144/13.10.2011) headed by Prof. DSc Ivanka Yankova, which aims to create new information resource for the towns which will serve the needs of scientific researches. By participating in generating the an array in the database through searching, selection and digitization of documents from these period, at the same time students get an opportunity to expand their skills to work effectively in a team, finding the interdisciplinary, a causal connection between the studied items, objects and subjects and foremost – practical experience in the field of digitization, information behavior, strategies for information search, etc. This method achieves good results for the accumulation of sustainable knowledge and it generates motivation to work in the field of library and information professions.