967 resultados para Environmental involvement programs
Resumo:
Proceedings of the First International Conference on Coastal Conservation and Management in the Atlantic and Mediterranean, p. 91-98
Resumo:
Demand response has gain increasing importance in the context of competitive electricity markets environment. The use of demand resources is also advantageous in the context of smart grid operation. In addition to the need of new business models for integrating demand response, adequate methods are necessary for an accurate determination of the consumers’ performance evaluation after the participation in a demand response event. The present paper makes a comparison between some of the existing baseline methods related to the consumers’ performance evaluation, comparing the results obtained with these methods and also with a method proposed by the authors of the paper. A case study demonstrates the application of the referred methods to real consumption data belonging to a consumer connected to a distribution network.
Resumo:
Environmental Training in Engineering Education (ENTREE 2001) - integrated green policies: progress for progress, p. 329-339 (Florence, 14-17 November 2001; proceedings published as book)
Resumo:
Progress in Industrial Ecology, An International Journal, nº 4(5), p. 363-381
Resumo:
Business Strategy and the Environment nº 15, p. 71–86
Resumo:
Journal of Cleaner Production, nº 17, p. 36-52
Resumo:
Following the deregulation experience of retail electricity markets in most countries, the majority of the new entrants of the liberalized retail market were pure REP (retail electricity providers). These entities were subject to financial risks because of the unexpected price variations, price spikes, volatile loads and the potential for market power exertion by GENCO (generation companies). A REP can manage the market risks by employing the DR (demand response) programs and using its' generation and storage assets at the distribution network to serve the customers. The proposed model suggests how a REP with light physical assets, such as DG (distributed generation) units and ESS (energy storage systems), can survive in a competitive retail market. The paper discusses the effective risk management strategies for the REPs to deal with the uncertainties of the DAM (day-ahead market) and how to hedge the financial losses in the market. A two-stage stochastic programming problem is formulated. It aims to establish the financial incentive-based DR programs and the optimal dispatch of the DG units and ESSs. The uncertainty of the forecasted day-ahead load demand and electricity price is also taken into account with a scenario-based approach. The principal advantage of this model for REPs is reducing the risk of financial losses in DAMs, and the main benefit for the whole system is market power mitigation by virtually increasing the price elasticity of demand and reducing the peak demand.
Resumo:
The positioning of the consumers in the power systems operation has been changed in the recent years, namely due to the implementation of competitive electricity markets. Demand response is an opportunity for the consumers’ participation in electricity markets. Smart grids can give an important support for the integration of demand response. The methodology proposed in the present paper aims to create an improved demand response program definition and remuneration scheme for aggregated resources. The consumers are aggregated in a certain number of clusters, each one corresponding to a distinct demand response program, according to the economic impact of the resulting remuneration tariff. The knowledge about the consumers is obtained from its demand price elasticity values. The illustrative case study included in the paper is based on a 218 consumers’ scenario.
Resumo:
Journal of Environmental Management, nº 82 p. 410–432
Resumo:
The concept of demand response has drawing attention to the active participation in the economic operation of power systems, namely in the context of recent electricity markets and smart grid models and implementations. In these competitive contexts, aggregators are necessary in order to make possible the participation of small size consumers and generation units. The methodology proposed in the present paper aims to address the demand shifting between periods, considering multi-period demand response events. The focus is given to the impact in the subsequent periods. A Virtual Power Player operates the network, aggregating the available resources, and minimizing the operation costs. The illustrative case study included is based on a scenario of 218 consumers including generation sources.
Consumption Management of Air Conditioning Devices for the Participation in Demand Response Programs
Resumo:
Demand Response has been taking over the years an extreme importance. There’s a lot of demand response programs, one of them proposed in this paper, using air conditioners that could increase the power quality and decrease the spent money in many ways like: infrastructures and customers energy bill reduction. This paper proposes a method and a study on how air conditioners could integrate demand response programs. The proposed method has been modelled as an energy resources management optimization problem. This paper presents two case studies, the first one with all costumers participating and second one with some of costumers. The results obtained for both case studies have been analyzed.
Resumo:
The recent changes on power systems paradigm requires the active participation of small and medium players in energy management. With an electricity price fluctuation these players must manage the consumption. Lowering costs and ensuring adequate user comfort levels. Demand response can improve the power system management and bring benefits for the small and medium players. The work presented in this paper, which is developed aiming the smart grid context, can also be used in the current power system paradigm. The proposed system is the combination of several fields of research, namely multi-agent systems and artificial neural networks. This system is physically implemented in our laboratories and it is used daily by researchers. The physical implementation gives the system an improvement in the proof of concept, distancing itself from the conventional systems. This paper presents a case study illustrating the simulation of real-time pricing in a laboratory.
Resumo:
A monitorização ambiental é essencial para a tomada de decisões tanto na ciência como na indústria. Em particular, uma vez que a água é essencial à vida e a superfície da Terra é composta principalmente por água, a monitorização do clima e dos parâmetros relacionados com a água em ecossistemas sensíveis, tais como oceanos, lagoas, rios e lagos, é de extrema importância. Um dos métodos mais comuns para monitorar a água é implantar bóias. O presente trabalho está integrado num projeto mais amplo, com o objetivo de projectar e desenvolver uma bóia autónoma para a investigação científica com dois modos de funcionamento: (i) monitorização ambiental ; e (ii) baliza ativa de regata. Assim, a bóia tem duas aplicações principais: a coleta e armazenamento de dados e a assistência a regatas de veleiros autónomos. O projeto arrancou há dois anos com um grupo de quatro estudantes internacionais. Eles projetaram e construíram a estrutura física, compraram e montaram o sistema de ancoragem da bóia e escolherem a maioria dos componentes electrónicos para o sistema geral de controlo e medição. Este ano, durante o primeiro semestre, dois estudantes belgas - Jeroen Vervenne e Hendrick Verschelde – trabalharam nos subsistemas de recolha e armazenamento de dados (unidade de controlo escrava) e de telemetria e configuração (unidade de controlo mestre) assim como definiram o protocolo de comunicação da aplicação. O trabalho desta tese continua o desenvolvimento do subsistema de telemetria e configuração. Este subsistema _e responsável pela configuração do modo de funcionamento e dos sensores assim como pela comunicação com a estacão de base (controlo ambiental), barcos (baliza ativa de regata) e com o subsistema de recolha e armazenamento de dados. O desenvolvimento do subsistema de recolha e armazenamento de dados, que coleta e armazena num cartão SD os dados dos sensores selecionados, prossegue com outro estudante belga - Mathias van Flieberge. O objetivo desta tese é, por um lado, implementar o subsistema de telemetria e de configuração na unidade de controle mestre e, por outro lado, refinar e implementar, conjuntamente com Mathias van Flieberge, o protocolo de nível de aplicação projetado. Em particular, a unidade de controlo mestre deve processar e atribuir prioridades às mensagens recebidas da estacão base, solicitar dados à unidade de controlo escrava e difundir mensagens com informação de posição e condições de vento e água no modo de regata. Enquanto que a comunicação entre a unidade de controlo mestre e a estacão base e a unidade de controlo mestre e os barcos é sem fios, a unidade de controlo mestre e a unidade de controlo escrava comunicam através de uma ligação série. A bóia tem atualmente duas limitações: (i) a carga máxima é de 40 kg; e (ii) apenas pode ser utilizada em rios ou próximo da costa dada à limitação de distância imposta pela técnica de comunicação sem fios escolhida.
Resumo:
Three cases of dengue fever involving the central nervous system (CNS) are reported. All occurred in 1994 during a dengue (DEN) epidemic caused by serotypes DEN-1 and DEN-2. The first case examined was a 17-year-old girl who complained of fever, nuchal rigidity and genital bleeding. Three blood samples were positive by anti-dengue IgM ELISA and showed hemagglutination-inhibition (HI) test titers ³ 1,280. The second case concerned a 86-year-old woman with fever, muscle and joint pains, altered consciousness, syncope, nuchal rigidity and meningismus. Her blood sample showed an HI titer of 1:320 for flaviviruses, and an IgM ELISA positive for dengue. The third case was a 67-year-old woman with fever, abnormal behaviour, seizures, tremor of extremities, thrombocytopenia, increased hematocrit and leukopenia. The patient suffered a typical case of dengue hemorrhagic fever with ensuing shock and a fatal outcome. A single blood sample showed HI antibodies of ³ 1,280 and an IgM ELISA positive for dengue. No virus could be isolated from any patient by inoculation of blood into C6/36 cells and suckling mice. No other agent of disease was encountered in the patient.