998 resultados para Electricity Planning
Resumo:
Background: The Early Development Instrument (EDI) is a population-level measure of five developmental domains at school-entry age. The overall aim of this thesis was to explore the potential of the EDI as an indicator of early development in Ireland. Methods: A cross-sectional study was conducted in 47 primary schools in 2011 using the EDI and a linked parental questionnaire. EDI (teacher completed) scores were calculated for 1,344 children in their first year of full-time education. Those scoring in the lowest 10% of the sample population in one or more domains were deemed to be 'developmentally vulnerable'. Scores were correlated with contextual data from the parental questionnaire and with indicators of area and school-level deprivation. Rasch analysis was used to determine the validity of the EDI. Results: Over one quarter (27.5%) of all children in the study were developmentally vulnerable. Individual characteristics associated with increased risk of vulnerability were being male; under 5 years old; and having English as a second language. Adjusted for these demographics, low birth weight, poor parent/child interaction and mother’s lower level of education showed the most significant odds ratios for developmental vulnerability. Vulnerability did not follow the area-level deprivation gradient as measured by a composite index of material deprivation. Children considered by the teacher to be in need of assessment also had lower scores, which were not significantly different from those of children with a clinical diagnosis of special needs. all domains showed at least reasonable fit to the Rasch model supporting the validity of the instrument. However, there was a need for further refinement of the instrument in the Irish context. Conclusion: This thesis provides a unique snapshot of early development in Ireland. The EDI and linked parental questionnaires are promising indicators of the extent, distribution and determinants of developmental vulnerability.
Resumo:
Submission on behalf of UCC to the Government Consultation on the White paper on Irish Aid
Resumo:
This work illustrates the influence of wind forecast errors on system costs, wind curtailment and generator dispatch in a system with high wind penetration. Realistic wind forecasts of different specified accuracy levels are created using an auto-regressive moving average model and these are then used in the creation of day-ahead unit commitment schedules. The schedules are generated for a model of the 2020 Irish electricity system with 33% wind penetration using both stochastic and deterministic approaches. Improvements in wind forecast accuracy are demonstrated to deliver: (i) clear savings in total system costs for deterministic and, to a lesser extent, stochastic scheduling; (ii) a decrease in the level of wind curtailment, with close agreement between stochastic and deterministic scheduling; and (iii) a decrease in the dispatch of open cycle gas turbine generation, evident with deterministic, and to a lesser extent, with stochastic scheduling.
Resumo:
A growing number of software development projects successfully exhibit a mix of agile and traditional software development methodologies. Many of these mixed methodologies are organization specific and tailored to a specific project. Our objective in this research-in-progress paper is to develop an artifact that can guide the development of such a mixed methodology. Using control theory, we design a process model that provides theoretical guidance to build a portfolio of controls that can support the development of a mixed methodology for software development. Controls, embedded in methods, provide a generalizable and adaptable framework for project managers to develop their mixed methodology specific to the demands of the project. A research methodology is proposed to test the model. Finally, future directions and contributions are discussed.
Resumo:
BACKGROUND: Outpatient palliative care, an evolving delivery model, seeks to improve continuity of care across settings and to increase access to services in hospice and palliative medicine (HPM). It can provide a critical bridge between inpatient palliative care and hospice, filling the gap in community-based supportive care for patients with advanced life-limiting illness. Low capacities for data collection and quantitative research in HPM have impeded assessment of the impact of outpatient palliative care. APPROACH: In North Carolina, a regional database for community-based palliative care has been created through a unique partnership between a HPM organization and academic medical center. This database flexibly uses information technology to collect patient data, entered at the point of care (e.g., home, inpatient hospice, assisted living facility, nursing home). HPM physicians and nurse practitioners collect data; data are transferred to an academic site that assists with analyses and data management. Reports to community-based sites, based on data they provide, create a better understanding of local care quality. CURRENT STATUS: The data system was developed and implemented over a 2-year period, starting with one community-based HPM site and expanding to four. Data collection methods were collaboratively created and refined. The database continues to grow. Analyses presented herein examine data from one site and encompass 2572 visits from 970 new patients, characterizing the population, symptom profiles, and change in symptoms after intervention. CONCLUSION: A collaborative regional approach to HPM data can support evaluation and improvement of palliative care quality at the local, aggregated, and statewide levels.
Resumo:
PURPOSE: To demonstrate the feasibility of using a knowledge base of prior treatment plans to generate new prostate intensity modulated radiation therapy (IMRT) plans. Each new case would be matched against others in the knowledge base. Once the best match is identified, that clinically approved plan is used to generate the new plan. METHODS: A database of 100 prostate IMRT treatment plans was assembled into an information-theoretic system. An algorithm based on mutual information was implemented to identify similar patient cases by matching 2D beam's eye view projections of contours. Ten randomly selected query cases were each matched with the most similar case from the database of prior clinically approved plans. Treatment parameters from the matched case were used to develop new treatment plans. A comparison of the differences in the dose-volume histograms between the new and the original treatment plans were analyzed. RESULTS: On average, the new knowledge-based plan is capable of achieving very comparable planning target volume coverage as the original plan, to within 2% as evaluated for D98, D95, and D1. Similarly, the dose to the rectum and dose to the bladder are also comparable to the original plan. For the rectum, the mean and standard deviation of the dose percentage differences for D20, D30, and D50 are 1.8% +/- 8.5%, -2.5% +/- 13.9%, and -13.9% +/- 23.6%, respectively. For the bladder, the mean and standard deviation of the dose percentage differences for D20, D30, and D50 are -5.9% +/- 10.8%, -12.2% +/- 14.6%, and -24.9% +/- 21.2%, respectively. A negative percentage difference indicates that the new plan has greater dose sparing as compared to the original plan. CONCLUSIONS: The authors demonstrate a knowledge-based approach of using prior clinically approved treatment plans to generate clinically acceptable treatment plans of high quality. This semiautomated approach has the potential to improve the efficiency of the treatment planning process while ensuring that high quality plans are developed.
Resumo:
We analyze the cost-effectiveness of electric utility ratepayer-funded programs to promote demand-side management (DSM) and energy efficiency (EE) investments. We specify a model that relates electricity demand to previous EE DSM spending, energy prices, income, weather, and other demand factors. In contrast to previous studies, we allow EE DSM spending to have a potential longterm demand effect and explicitly address possible endogeneity in spending. We find that current period EE DSM expenditures reduce electricity demand and that this effect persists for a number of years. Our findings suggest that ratepayer funded DSM expenditures between 1992 and 2006 produced a central estimate of 0.9 percent savings in electricity consumption over that time period and a 1.8 percent savings over all years. These energy savings came at an expected average cost to utilities of roughly 5 cents per kWh saved when future savings are discounted at a 5 percent rate. Copyright © 2012 by the IAEE. All rights reserved.
Resumo:
PURPOSE: To investigate the dosimetric effects of adaptive planning on lung stereotactic body radiation therapy (SBRT). METHODS AND MATERIALS: Forty of 66 consecutive lung SBRT patients were selected for a retrospective adaptive planning study. CBCT images acquired at each fraction were used for treatment planning. Adaptive plans were created using the same planning parameters as the original CT-based plan, with the goal to achieve comparable comformality index (CI). For each patient, 2 cumulative plans, nonadaptive plan (PNON) and adaptive plan (PADP), were generated and compared for the following organs-at-risks (OARs): cord, esophagus, chest wall, and the lungs. Dosimetric comparison was performed between PNON and PADP for all 40 patients. Correlations were evaluated between changes in dosimetric metrics induced by adaptive planning and potential impacting factors, including tumor-to-OAR distances (dT-OAR), initial internal target volume (ITV1), ITV change (ΔITV), and effective ITV diameter change (ΔdITV). RESULTS: 34 (85%) patients showed ITV decrease and 6 (15%) patients showed ITV increase throughout the course of lung SBRT. Percentage ITV change ranged from -59.6% to 13.0%, with a mean (±SD) of -21.0% (±21.4%). On average of all patients, PADP resulted in significantly (P=0 to .045) lower values for all dosimetric metrics. ΔdITV/dT-OAR was found to correlate with changes in dose to 5 cc (ΔD5cc) of esophagus (r=0.61) and dose to 30 cc (ΔD30cc) of chest wall (r=0.81). Stronger correlations between ΔdITV/dT-OAR and ΔD30cc of chest wall were discovered for peripheral (r=0.81) and central (r=0.84) tumors, respectively. CONCLUSIONS: Dosimetric effects of adaptive lung SBRT planning depend upon target volume changes and tumor-to-OAR distances. Adaptive lung SBRT can potentially reduce dose to adjacent OARs if patients present large tumor volume shrinkage during the treatment.
Resumo:
To maintain a strict balance between demand and supply in the US power systems, the Independent System Operators (ISOs) schedule power plants and determine electricity prices using a market clearing model. This model determines for each time period and power plant, the times of startup, shutdown, the amount of power production, and the provisioning of spinning and non-spinning power generation reserves, etc. Such a deterministic optimization model takes as input the characteristics of all the generating units such as their power generation installed capacity, ramp rates, minimum up and down time requirements, and marginal costs for production, as well as the forecast of intermittent energy such as wind and solar, along with the minimum reserve requirement of the whole system. This reserve requirement is determined based on the likelihood of outages on the supply side and on the levels of error forecasts in demand and intermittent generation. With increased installed capacity of intermittent renewable energy, determining the appropriate level of reserve requirements has become harder. Stochastic market clearing models have been proposed as an alternative to deterministic market clearing models. Rather than using a fixed reserve targets as an input, stochastic market clearing models take different scenarios of wind power into consideration and determine reserves schedule as output. Using a scaled version of the power generation system of PJM, a regional transmission organization (RTO) that coordinates the movement of wholesale electricity in all or parts of 13 states and the District of Columbia, and wind scenarios generated from BPA (Bonneville Power Administration) data, this paper explores a comparison of the performance between a stochastic and deterministic model in market clearing. The two models are compared in their ability to contribute to the affordability, reliability and sustainability of the electricity system, measured in terms of total operational costs, load shedding and air emissions. The process of building the models and running for tests indicate that a fair comparison is difficult to obtain due to the multi-dimensional performance metrics considered here, and the difficulty in setting up the parameters of the models in a way that does not advantage or disadvantage one modeling framework. Along these lines, this study explores the effect that model assumptions such as reserve requirements, value of lost load (VOLL) and wind spillage costs have on the comparison of the performance of stochastic vs deterministic market clearing models.
Resumo:
Evolving family structure and economic conditions may affect individuals' ability and willingness to plan for future long-term care (LTC) needs. We applied life course constructs to analyze focus group data from a study of family decision making about LTC insurance. Participants described how past exposure to caregiving motivated them to engage in LTC planning; in contrast, child rearing discouraged LTC planning. Perceived institutional and economic instability drove individuals to regard financial LTC planning as either a wise precaution or another risk. Perceived economic instability also shaped opinions that adult children are ill-equipped to support parents' LTC. Despite concerns about viability of social insurance programs, some participants described strategies to maximize gains from them. Changing norms around aging and family roles also affected expectations of an active older age, innovative LTC options, and limitations to adult children's involvement. Understanding life course context can inform policy efforts to encourage LTC planning.
Resumo:
In order to develop a strategic plan that will guide their priorities and resource allocation for 2018-2021, North Carolina Sea Grant has implemented a multi-stage process designed to increase stakeholder engagement and to better assess and serve the coastal priorities of North Carolinians. This project explores strengths and potential areas for improvement within NC Sea Grant’s planning process with a specific focus on maximizing stakeholder engagement. By interviewing staff, observing focus groups, and creating a survey instrument for public distribution, we developed a set of recommendations highlighting the ways that NC Sea Grant can better facilitate inclusion of stakeholder, public, and staff input in its strategic planning process, such as holding some stakeholder events outside of typical business hours and discussing ways to incorporate diversity into the strategic plan.
Resumo:
As announced in the November 2000 issue of MathStats&OR [1], one of the projects supported by the Maths, Stats & OR Network funds is an international survey of research into pedagogic issues in statistics and OR. I am taking the lead on this and report here on the progress that has been made during the first year. A paper giving some background to the project and describing initial thinking on how it might be implemented was presented at the 53rd session of the International Statistical Institute in Seoul, Korea, in August 2001 in a session on The future of statistics education research [2]. It sounded easy. I considered that I was something of an expert on surveys having lectured on the topic for many years and having helped students and others who were doing surveys, particularly with the design of their questionnaires. Surely all I had to do was to draft a few questions, send them electronically to colleagues in statistical education who would be only to happy to respond, and summarise their responses? I should have learnt from my experience of advising all those students who thought that doing a survey was easy and to whom I had to explain that their ideas were too ambitious. There are several inter-related stages in survey research and it is important to think about these before rushing into the collection of data. In the case of the survey in question, this planning stage revealed several challenges. Surveys are usually done for a purpose so even before planning how to do them, it is advisable to think about the final product and the dissemination of results. This is the route I followed.
Resumo:
This paper examines whether increases to published wholesale prices justify the retail electricity price increases imposed on residential consumers in January 2008. The study is based on analysis of two questions: Is the reported wholesale price a reliable indicator of the cost electricity retailers are paying to buy power; and is the corporate structure of the British electricity sector competitive? [Taken from first paragraph of summary]
Resumo:
This paper examines global experiences with electricity liberalisation relevant to the new legislation on electricity passed by the Indonesian parliament in September 2009. It covers experiences in the UK, EU, USA and ten major developing economies. Finally, the paper comments on a number of the issues emerging from this survey, in particular the reliance on public finance for extensions to electricity networks, the advantages of public finance for cheaper capital and for developing renewables, and the comparative evidence on efficiency.
Resumo:
There is now a broad scientific consensus that the global climate is changing in ways that are likely to have a profound impact on human society and the natural environment over the coming decades. The challenge for Facilities Mangers is to ensure that business continuity plans acknowledge the potential for such events and have contingencies in place to ensure that their organisation can recover from an extreme weather event in a timely fashion. This paper will review current literature/theories pertinent to extreme weather events and business continuity planning; will consider issues of risk; identify the key drivers that need to be considered by Facilities Managers in preparing contingency/disaster recover plans; and identify gaps in knowledge (understanding and toolkits) that need to be addressed. The paper will also briefly outline a 3 year research project underway in the UK to address the issues