881 resultados para Electric power system stability


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Trabalho Final de Mestrado para a obtenção de grau de Mestre em Engenharia Electrotécnica Ramo de Automação e Electrónica Industrial

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The integration of growing amounts of distributed generation in power systems, namely at distribution networks level, has been fostered by energy policies in several countries around the world, including in Europe. This intensive integration of distributed, non-dispatchable, and natural sources based generation (including wind power) has caused several changes in the operation and planning of power systems and of electricity markets. Sometimes the available non-dispatchable generation is higher than the demand. This generation must be used; otherwise it is wasted if not stored or used to supply additional demand. New policies and market rules, as well as new players, are needed in order to competitively integrate all the resources. The methodology proposed in this paper aims at the maximization of the social welfare in a distribution network operated by a virtual power player that aggregates and manages the available energy resources. When facing a situation of excessive non-dispatchable generation, including wind power, real time pricing is applied in order to induce the increase of consumption so that wind curtailment is minimized. This method is especially useful when actual and day-ahead resources forecast differ significantly. The distribution network characteristics and concerns are addressed by including the network constraints in the optimization model. The proposed methodology has been implemented in GAMS optimization tool and its application is illustrated in this paper using a real 937-bus distribution network with 20.310 consumers and 548 distributed generators, some of them non-dispatchable and with must take contracts. The implemented scenario corresponds to a real day in Portuguese power system.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper consists in the characterization of medium voltage (MV) electric power consumers based on a data clustering approach. It is intended to identify typical load profiles by selecting the best partition of a power consumption database among a pool of data partitions produced by several clustering algorithms. The best partition is selected using several cluster validity indices. These methods are intended to be used in a smart grid environment to extract useful knowledge about customers’ behavior. The data-mining-based methodology presented throughout the paper consists in several steps, namely the pre-processing data phase, clustering algorithms application and the evaluation of the quality of the partitions. To validate our approach, a case study with a real database of 1.022 MV consumers was used.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Load forecasting has gradually becoming a major field of research in electricity industry. Therefore, Load forecasting is extremely important for the electric sector under deregulated environment as it provides a useful support to the power system management. Accurate power load forecasting models are required to the operation and planning of a utility company, and they have received increasing attention from researches of this field study. Many mathematical methods have been developed for load forecasting. This work aims to develop and implement a load forecasting method for short-term load forecasting (STLF), based on Holt-Winters exponential smoothing and an artificial neural network (ANN). One of the main contributions of this paper is the application of Holt-Winters exponential smoothing approach to the forecasting problem and, as an evaluation of the past forecasting work, data mining techniques are also applied to short-term Load forecasting. Both ANN and Holt-Winters exponential smoothing approaches are compared and evaluated.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The electricity market restructuring, along with the increasing necessity for an adequate integration of renewable energy sources, is resulting in an rising complexity in power systems operation. Various power system simulators have been introduced in recent years with the purpose of helping operators, regulators, and involved players to understand and deal with this complex environment. This paper focuses on the development of an upper ontology which integrates the essential concepts necessary to interpret all the available information. The restructuring of MASCEM (Multi-Agent System for Competitive Electricity Markets), and this system’s integration with MASGriP (Multi-Agent Smart Grid Platform), and ALBidS (Adaptive Learning Strategic Bidding System) provide the means for the exemplification of the usefulness of this ontology. A practical example is presented, showing how common simulation scenarios for different simulators, directed to very distinct environments, can be created departing from the proposed ontology.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Os combustíveis fósseis, como o carvão, o petróleo e o gás, constituem fontes de energia que em breve se esgotarão e que são demasiado caras para serem desperdiçadas pelas centrais elétricas na produção de electricidade. Para além desse facto, existem outros argumentos (sobretudo económicos) que inviabilizam a utilização destas fontes de energia em algumas regiões, abrindo caminho a fontes de energia alternativas (e.g. solar, eólica, biomassa, mini-hídricas, geotérmicas, etc) e preferencialmente com contornos locais. No caso particular de Moçambique, tem-se verificado um interesse crescente por parte do governo e de várias ONGs na promoção do uso de energias alternativas para as zonas onde a energia convencional não chega e não chegará, devido aos custos muito elevados que esse processo acarretaria. Esta dissertação apresenta um estudo aprofundado do dimensionamento dum sistema híbrido de geração de energia elétrica envolvendo gerador FV e grupo eletrogéneo de emergência para a Escola Rural da Nangade, situada no Distrito de Nangade, na Província do Cabo Delgado. São também descritos os diversos componentes e as tecnologias associadas a um sistema deste género, com a inclusão de sistemas inteligentes de controlo de energia com a utilização de inversores bidireccionais (inversores de bateria e carregadores) para sistemas isolados. Os resultados são apresentados de forma a facilitar a aplicação e montagem deste tipo de sistemas in loco. Espera-se que esta dissertação possa servir de base no futuro próximo, para a implementação deste tipo de sistemas para permitir a melhoria da qualidade de ensino através de melhores infraestruturas, democratizando desta forma o acesso à educação para as crianças das zonas rurais das várias províncias de Moçambique. Como as energias renováveis são parte integrante do Sistema Elétrico Nacional, apresenta-se resumidamente, no anexo 17, o “Plano de Desenvolvimento na Área de Energia de Moçambique”.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Neste trabalho é efetuado o dimensionamento de sistemas fotovoltaicos para serem instalados em edificações localizadas em Angola com o objetivo de analisar a produção de energia elétrica através de sistemas fotovoltaicos. Utilizando o software PVsyst na versão 6.3.2 foram dimensionados três sistemas fotovoltaicos, dois sistemas destinados a ser instalados numa residência, um ligado à rede e o outro autónomo e por fim um sistema fotovoltaico ligado à rede para uma instalação industrial. A determinação dos custos de investimento nos três sistemas foi obtida de forma aproximada, tendo como base preços dos equipamentos no mercado Português e considerando os custos de importação de mercadorias no mercado Angolano. Para os sistemas ligados à rede é analisada a rentabilidade financeira do investimento durante o período de vida útil dos módulos fotovoltaicos considerando três cenários distintos. No primeiro cenário o valor da remuneração pela energia vendida pelo produtor é igual ao valor pago pela energia comprada. No segundo e terceiros cenário de análise económica pretende-se encontrar uma tarifa de energia que torne o investimento rentável com um período de amortização de 7 e 12 anos respetivamente.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Este estudo consiste na caracterização da eficiência energética de uma bomba de calor de expansão direta que utiliza a energia solar como fonte térmica. De uma forma geral, teve-se a obrigação de procurar cada vez mais recursos renováveis e neste sentido a bomba de calor de expansão direta tem um papel importante no aquecimento de águas quentes sanitárias (AQS). Como ponto de partida, foi realizada uma descrição detalhada sobre todos os equipamentos da bomba de calor e elaborado um desenho técnico que identifica todos os componentes. No laboratório (casa inteligente) realizaram-se vários ensaios a fim de interpretar com rigor os resultados obtidos do desempenho da bomba de calor (COP) e do fator médio de desempenho sazonal (SPF). No início, realizaram-se ensaios para determinar as perdas estáticas do sistema termodinâmico, de seguida foram elaborados ensaios segundo a norma EN 16147 e por fim, ensaios de acordo com o perfil de utilização de AQS definido. No estudo experimental do COP, obteve-se uma elevada eficiência energética com um valor médio de 4,12. O COP aumenta para valores médios de 5 quando a temperatura de água no termoacumulador desce para 35ºC. Verificou-se que durante o período diurno o COP aumenta aproximadamente de 10% relativamente ao período noturno. A potência elétrica é mais elevada (450W) quando a água no termoacumulador está perto da temperatura desejável (55ºC), originando um esforço maior da bomba de calor. No estudo experimental do SPF, verificou-se que nos ensaios segundo a norma EN16147 os valores obtidos variaram entre 1,39 e 1,50 (Classe “B”). No estudo realizado de acordo com o perfil de utilização de AQS definido pelo utilizador, o SPF é superior em 12% relativamente ao obtido segundo os ensaios realizados de acordo a norma EN16147. Verificou-se que o aumento da temperatura do ar exterior implica um aumento do SPF (cerca de 2% a 5%), enquanto a energia solar não influência nos resultados.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Uusiutuvan sähköntuotannon osuuden kasvaessa kasvaa tarve tasata sähköntuotannon ja kulutuksen vaihteluita varastoimalla sähköä. Power to Gas (PtG) - sähköenergiasta luonnonkaasua tarjoaa yhden mahdollisuuden varastoida sähköä. Sähköä käytetään veden elektrolyysiin, jossa syntynyt vety käytetään metanoinissa yhdessä hiilidioksidin kanssa muodostamaan korvaavaa luonnonkaasua. Näin syntynyttä korvaava luonnonkaasua sähköstä kutsutaan e-SNG-kaasuksi. Tässä työssä tutkitaan PtG-laitoksen investointi, käyttö- ja kunnossapitokuluja. Työssä luodaan laskentamalli, jolla lasketaan PtG-laitoksen neljälle käyttötapaukselle kannattavuuslaskelma. Käyttötapauksille lasketaan myös herkkyystarkasteluja. Kannattavuuslaskelmien perusteella päätellään PtG-laitoksen liiketoimintamahdollisuudet Suomessa. Työssä laskettujen kannattavuuslaskelmien perusteella PtG-laitoksen perustapausten liiketoimintamahdollisuudet ovat huonot. Laskettujen herkkyystarkastelujen perusteella havaittiin, että investointikulut, laitoksen ajoaika ja lisätulot hapesta ja lämmöstä ovat kannattavuuden kannalta kriittisimmät menestystekijät.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The research towards efficient, reliable and environmental-friendly power supply solutions is producing growing interest to the “Smart Grid” approach for the development of the electricity networks and managing the increasing energy consumption. One of the novel approaches is an LVDC microgrid. The purpose of the research is to analyze the possibilities for the implementation of LVDC microgrids in public distribution networks in Russia. The research contains the analysis of the modern Russian electric power industry, electricity market, electricity distribution business, regulatory framework and standardization, related to the implementation of LVDC microgrid concept. For the purpose of the economic feasibility estimation, a theoretical case study for comparing low voltage AC and medium voltage AC with LVDC microgrid solutions for a small settlement in Russia is presented. The results of the market and regulatory framework analysis along with the economic comparison of AC and DC solutions show that implementation of the LVDC microgrid concept in Russia is possible and can be economically feasible. From the electric power industry and regulatory framework point of view, there are no serious obstacles for the LVDC microgrids in Russian distribution networks. However, the most suitable use cases at the moment are expected to be found in the electrification of remote settlements, which are isolated from the Unified Energy System of Russia.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Welland Power and Supply Canal Company Limited, established in 1893 and incorporated in 1894 with a capital stock of $500,000. The aim of the company was to harness the natural water supply of the Niagara and Welland Rivers. In 1898 the Canadian Electrical News published a report by Henry Symons, QC outlining the main project of the company. This project involves the construction of a canal from the Welland River to the brow of the mountain at Thorold, a distance of 8 miles; the construction at Thorold of a power house, and from Thorold to Lake Ontario, a raceway by which to carry water into the lake. The estimate for the machinery to generate 100,000 horse power is £125,000; for transmission line to Toronto at a voltage of 10,000….The total estimate therefore amounts to £2,452,162, or roughly speaking, $12,000,000. Source: Canadian Electrical News, August 1898, p. 172. In 1899 the company officers petitioned the federal government desiring a name change to the Niagara-Welland Power Company Limited. Officers of the company were Harry Symons, President; Charles A. Hesson, Vice-President; and M.R. O’Loughlin, James B. Sheehan, James S. Haydon, Frederick K. Foster, directors; John S. Campbell, secretary-treasurer. The company’s head offices were located in St. Catharines, with a New York (City) office on Broad Street. In 1905 and 1909 the company petitioned the federal government for additional time to construct its works, which was granted. The company had until May 16, 1915 to complete construction. John S. Campbell (1860-1950) was a graduate of the University of Toronto and Osgoode Hall. During his university years John began his military career first in "K" Company, Queens Own rifles and then later as Commanding Officer of the 19th Lincoln Regiment, from 1906 to 1910. Upon his return to St. Catharines John Campbell served as secretary in the St. Catharines Garrison Club, a social club for military men begun in 1899. After being called to the Bar, he became a partner in the firm of Campbell and McCarron and was appointed to the bench in 1916, serving until retirement in 1934. Judge Campbell served as an alderman for several terms and was the mayor of St. Catharines in 1908 and 1909. He also served as the first chairman of the St. Catharines Public Utilities in 1914. John S. Campbell was married to Elizabeth Oille, daughter of Jerome B. and Charlotte (St. John) Oille. The family home "Cruachan" was located at 32 Church St.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sir Adam Beck ( a London, Ontario manufacturer, Mayor and Conservative member of the provincial legislature) was a champion of municipal and provincial power ownership. Beck become the “Power Minister” and chairman of the Hydro-Electric Power Commission of Ontario which was the world’s first publicly owned utility. In 1925 the first unit of the Hydro Electric Power Commission’s Queenston Chippawa hydro-electric development on the Niagara River went into service. The station was renamed in 1950 as “Sir Adam Beck #1”. This marked the 25th anniversary of Beck’s death. This is one of 2 generating stations in Niagara Falls. There is also Adam Beck Plant #2. The Niagara generating stations supply one quarter of all power used in New York State and Ontario.Ontario Hydro has two water tunnels which traverse the entire City of Niagara Falls from the Village of Chippawa in the South to the Sir Adam Beck Hydro Electric Generating Stations in the North. Also they are in the process of building the third tunnel. In addition, Ontario Hydro has a 13.6 km open canal which traverses the entire City of Niagara Falls. Source: http://www.hydroone.com/OurCompany/Pages/OurHistory.aspx

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Results of a numerical study of synchronisation of two directly modulated semiconductor lasers, using bi-directional coupling, are presented. The effect of stepwise increase in the coupling strength (C) on the synchronisation of the chaotic outputs of two such lasers is studied, with the help of parameter space plots, synchronisation error plots, phase diagrams and time series outputs. Numerical results indicate that as C increases, the system achieves synchronisation as well as stability together with an increase in the output power. The stability of the synchronised states is checked by applying a perturbation to the system after it becomes synchronised and then noting the time it takes to regain synchronisation. For lower values of C the system does not regain synchronisation. But, with higher values synchronisation is regained within a very short time.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Unit commitment is an optimization task in electric power generation control sector. It involves scheduling the ON/OFF status of the generating units to meet the load demand with minimum generation cost satisfying the different constraints existing in the system. Numerical solutions developed are limited for small systems and heuristic methodologies find difficulty in handling stochastic cost functions associated with practical systems. This paper models Unit Commitment as a multi stage decision task and Reinforcement Learning solution is formulated through one efficient exploration strategy: Pursuit method. The correctness and efficiency of the developed solutions are verified for standard test systems

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Sowohl die Ressourcenproblematik als auch die drohenden Ausmaße der Klimaänderung lassen einen Umstieg auf andere Energiequellen langfristig unausweichlich erscheinen und mittelfristig als dringend geboten. Unabhängig von der Frage, auf welchem Niveau sich der Energiebedarf stabilisieren lässt, bleibt dabei zu klären, welche Möglichkeiten sich aus technischer und wirtschaftlicher Sicht in Zukunft zur Deckung unseres Energiebedarfs anbieten. Eine aussichtsreiche Option besteht in der Nutzung regenerativer Energien in ihrer ganzen Vielfalt. Die Arbeit "Szenarien zur zukünftigen Stromversorgung, kostenoptimierte Variationen zur Versorgung Europas und seiner Nachbarn mit Strom aus erneuerbaren Energien" konzentriert sich mit der Stromversorgung auf einen Teilaspekt der Energieversorgung, der zunehmend an Wichtigkeit gewinnt und als ein Schlüssel zur nachhaltigen Energieversorgung interpretiert werden kann. Die Stromversorgung ist heute weltweit für etwa die Hälfte des anthropogenen CO2-Ausstoßes verantwortlich. In dieser Arbeit wurden anhand verschiedener Szenarien Möglichkeiten einer weitgehend CO2–neutralen Stromversorgung für Europa und seine nähere Umgebung untersucht, wobei das Szenariogebiet etwa 1,1 Mrd. Einwohner und einen Stromverbrauch von knapp 4000 TWh/a umfasst. Dabei wurde untersucht, wie die Stromversorgung aufgebaut sein sollte, damit sie möglichst kostengünstig verwirklicht werden kann. Diese Frage wurde beispielsweise für Szenarien untersucht, in denen ausschließlich heute marktverfügbare Techniken berücksichtigt wurden. Auch der Einfluss der Nutzung einiger neuer Technologien, die bisher noch in Entwicklung sind, auf die optimale Gestaltung der Stromversorgung, wurde anhand einiger Beispiele untersucht. Die Konzeption der zukünftigen Stromversorgung sollte dabei nach Möglichkeit objektiven Kriterien gehorchen, die auch die Vergleichbarkeit verschiedener Versorgungsansätze gewährleisten. Dafür wurde ein Optimierungsansatz gewählt, mit dessen Hilfe sowohl bei der Konfiguration als auch beim rechnerischen Betrieb des Stromversorgungssystems weitgehend auf subjektive Entscheidungsprozesse verzichtet werden kann. Die Optimierung hatte zum Ziel, für die definierte möglichst realitätsnahe Versorgungsaufgabe den idealen Kraftwerks- und Leitungspark zu bestimmen, der eine kostenoptimale Stromversorgung gewährleistet. Als Erzeugungsoptionen werden dabei u.a. die Nutzung Regenerativer Energien durch Wasserkraftwerke, Windenergiekonverter, Fallwindkraftwerke, Biomassekraftwerke sowie solare und geothermische Kraftwerke berücksichtigt. Abhängig von den gewählten Randbedingungen ergaben sich dabei unterschiedliche Szenarien. Das Ziel der Arbeit war, mit Hilfe unterschiedlicher Szenarien eine breite Basis als Entscheidungsgrundlage für zukünftige politische Weichenstellungen zu schaffen. Die Szenarien zeigen Optionen für eine zukünftige Gestaltung der Stromversorgung auf, machen Auswirkungen verschiedener – auch politischer – Rahmenbedingungen deutlich und stellen so die geforderte Entscheidungsgrundlage bereit. Als Grundlage für die Erstellung der Szenarien mussten die verschiedenen Potentiale erneuerbarer Energien in hoher zeitlicher und räumlicher Auflösung ermittelt werden, mit denen es erstmals möglich war, die Fragen einer großräumigen regenerativen Stromversorgung ohne ungesicherte Annahmen anhand einer verlässlichen Datengrundlage anzugehen. Auch die Charakteristika der verschiedensten Energiewandlungs- und Transportsysteme mussten studiert werden und sind wie deren Kosten und die verschiedenen Potentiale in der vorliegenden Arbeit ausführlich diskutiert. Als Ausgangsszenario und Bezugspunkt dient ein konservatives Grundszenario. Hierbei handelt es sich um ein Szenario für eine Stromversorgung unter ausschließlicher Nutzung erneuerbarer Energien, die wiederum ausschließlich auf heute bereits entwickelte Technologien zurückgreift und dabei für alle Komponenten die heutigen Kosten zugrundelegt. Dieses Grundszenario ist dementsprechend auch als eine Art konservative Worst-Case-Abschätzung für unsere Zukunftsoptionen bei der regenerativen Stromversorgung zu verstehen. Als Ergebnis der Optimierung basiert die Stromversorgung beim Grundszenario zum größten Teil auf der Stromproduktion aus Windkraft. Biomasse und schon heute bestehende Wasserkraft übernehmen den überwiegenden Teil der Backup-Aufgaben innerhalb des – mit leistungsstarker HGÜ (Hochspannungs–Gleichstrom–Übertragung) verknüpften – Stromversorgungsgebiets. Die Stromgestehungskosten liegen mit 4,65 €ct / kWh sehr nahe am heute Üblichen. Sie liegen niedriger als die heutigen Preisen an der Strombörse. In allen Szenarien – außer relativ teuren, restriktiv ”dezentralen” unter Ausschluss großräumig länderübergreifenden Stromtransports – spielt der Stromtransport eine wichtige Rolle. Er wird genutzt, um Ausgleichseffekte bei der dargebotsabhängigen Stromproduktion aus erneuerbaren Quellen zu realisieren, gute kostengünstige Potentiale nutzbar zu machen und um die Speicherwasserkraft sowie die dezentral genutzte Biomasse mit ihrer Speicherfähigkeit für großräumige Backup-Aufgaben zu erschließen. Damit erweist sich der Stromtransport als einer der Schlüssel zu einer kostengünstigen Stromversorgung. Dies wiederum kann als Handlungsempfehlung bei politischen Weichenstellungen interpretiert werden, die demnach gezielt auf internationale Kooperation im Bereich der Nutzung erneuerbarer Energien setzen und insbesondere den großräumigen Stromtransport mit einbeziehen sollten. Die Szenarien stellen detaillierte und verlässliche Grundlagen für wichtige politische und technologische Zukunftsentscheidungen zur Verfügung. Sie zeigen, dass bei internationaler Kooperation selbst bei konservativen Annahmen eine rein regenerative Stromversorgung möglich ist, die wirtschaftlich ohne Probleme zu realisieren wäre und verweisen den Handlungsbedarf in den Bereich der Politik. Eine wesentliche Aufgabe der Politik läge darin, die internationale Kooperation zu organisieren und Instrumente für eine Umgestaltung der Stromversorgung zu entwickeln. Dabei kann davon ausgegangen werden, dass nicht nur ein sinnvoller Weg zu einer CO2–neutralen Stromversorgung beschritten würde, sondern sich darüber hinaus ausgezeichnete Entwicklungsperspektiven für die ärmeren Nachbarstaaten der EU und Europas eröffnen.