868 resultados para Construction projects
Resumo:
The study of the creative industries is not much more than a decade old. What makes it fascinating is that it is dealing with a rapidly evolving process, where a good deal of Schumpeterian ‘creative destruction’ – of old industries, business models, and some familiar cultural and creative pursuits – can already be observed. What happens next – and who will be the winner – is hard to predict. Furthermore, the creative industries encompass both large-scale ‘industry’ (media, publishing, digital applications) and individual creative talent; both economic and cultural values, and both global reach and local context. Thus, the challenge is to integrate ‘top-down’ policy and planning with ‘bottom-up’ experimentation and innovation. There is always the promise that this new creative ecology will provide some novel answers to problems of wealth-creation for emergent economies, new solutions to problems of intellectual emancipation for individuals, and sustainable development for that most intense incubator of creative ideas, the city.
Resumo:
Delivering infrastructure projects involves many stakeholders. Their responsibilities and authorities vary over the course of the project lifecycle - from establishing the project parameters and performance requirements, to operating and maintaining the completed infrastructure. To ensure the successful delivery of infrastructure projects, it is important for the project management team to identify and manage the stakeholders and their requirements. This chapter discusses the management of stakeholders in delivering infrastructure projects, from their conception to completion. It includes managing the stakeholders for project selection and involving them to improve project constructability, operability and maintainability.
Resumo:
Ecological sustainable development (ESD), defined as that which meets the needs of the present without compromising the ability of future generations to meet their own needs, has much to offer in enhancing the quality of life of people and maintaining the environment for future generations by reducing the pollution of water, air and land, minimizing the destruction of irreplaceable ecosystems and cutting down the amount of toxic materials released. However, there is still much to do to achieve full implementation world-wide. This paper reports on three factors-design, attitudes and financial constraints - that are likely barriers to the implementation of ESD within the built environment in Australian industry. A postal questionnaire survey is described aimed at soliciting views on detailed aspects of the factors. This shows that ESD in the Australian built environment has also not been successfully implemented. The main reason is found to be due to the perceived costs involved - the cost of using environmental materials being a predominant factor. The design of ESD, being more sophisticated, also is perceived as involving stakeholders in more expense. There also appears to be a lack of knowledge and a lack of specialised and interdisciplinary design teams available in the Australian context.
Resumo:
Expenditure on R&D in the China construction industry has been relatively low in comparison with many developed countries for a number of years – a situation considered to be a major barrier to the industry’s competitiveness in general and unsatisfactory industry development of the 31 regions involved. A major problem with this is the lack of a sufficiently sophisticated method of objectively evaluating R&D activity in what are quite complex circumstances considering the size and regional differences that exist in this part of the world. A regional construction R&D evaluation system (RCRES) is presented aimed at rectifying the situation. This is based on 12 indicators drawn from the Chinese Government’s R&D Inventory of Resources in consultation with a small group of experts in the field, and further factor analysed into three groups. From this, the required evaluation is obtained by a simple formula. Examination of the results provides a ranking list of the R&D performance of each of the 31 regions, indicating a general disproportion between coastal and inland regions and highlighting regions receiving special emphasis or currently lacking in development. The understanding on this is vital for the future of China’s construction industry.
Resumo:
Thin bed technology for clay/ concrete masonry is gaining popularity in many parts of the developed economy in recent times through active engagement of the industry with the academia. One of the main drivers for the development of thin bed technology is the progressive contraction of the professional brick and block laying workforce as the younger generation is not attracted towards this profession due to the general perception of the society towards manual work as being outdated in the modern digital economy. This situation has led to soaring cost of skilled labour associated with the general delay in completion of construction activities in recent times. In parallel, the advent of manufacturing technologies in producing bricks and blocks with adherence to specified dimensions and shapes and several rapid setting binders are other factors that have contributed to the development of thin bed technology. Although this technology is still emerging, especially for applications to earthquake prone regions, field applications are reported in Germany for over a few decades and in Italy since early 2000. The Australian concrete masonry industry has recently taken keen interest in pursuing research with a view to developing this technology. This paper presents the background information including review of literature and pilot studies that have been carried out to enable planning of the development of thin bed technology. The paper concludes with recommendations for future research.
Resumo:
Project Procurement is a ‘great’ environment for ethical issues with its low-price state of mind and competition. It has many opportunities that could contribute to illegal activities or unethical behavior especially in the construction industry. In 2006 alone, 17.3% of 417 Malaysian government contract projects were considered sick due to the poor performance by the contractors. Therefore it is important to govern the project procurement, especially the plan procurement stage to ensure the accountability and transparency of the decision made in awarding the right contract to the best contractor. This is where project governance framework (PGF) is really needed in project procurement planning. Project governance is a subset of corporate governance focusing on the areas of corporate governance related to project activities, including: portfolio direction, project sponsorship, project and program management and efficiency and disclosure and reporting. This paper highlights the importance of implementing project governance framework (PGF) to ensure that the decision makers are answerable and accountable to the stakeholders, and the decision making is transparent to avoid any ethical issues arises. A comprehensive preliminary literature is carried out to discover the importance of executing PGF in project procurement in Malaysian public sector. By understanding the important of PGF, it is hoped that this will bring a signal to other developing countries to implement the similar method in ensuring the transparency of the decision making in project procurement planning in their countries.
Resumo:
Lean project management is the comprehensive adaption of other lean concept like lean construction, lean manufacturing and lean thinking into project management context. Execution of many similar industrial projects creates the idea of lean project management in companies and rapidly growing in industries. This paper offers the standardization method in order to achieve Lean project management in large scale industrial project. Standardization refers to all activity which makes two projects most identical and unify to each other like standardization of design, reducing output variability, value analysis and strategic management. Although standard project may have minor effi ciency decrease, compare to custom built project; but great advantage of standard project like cost saving, time reduction and quality improvement justify standardization methodology. This paper based on empirical experience in industrial project and theoretical analysis of benefi ts of project standardization.
Resumo:
If the trade union movement is to remain an influential force in the industrial, economic and socio/political arenas of industrialised nations it is vital that its recruitment of young members improve dramatically. Australian union membership levels have declined markedly over the last three decades and youth union membership levels have decreased more than any age group. Currently around 10% of young workers aged between 16-24 years are members of unions in Australia compared to 26% of workers aged 45-58 (Oliver, 2008). This decline has occurred throughout the union movement, in all states and in almost all industries and occupations. This research, which consists of interviews with union organisers and union officials, draws on perspectives from the labour geography literature to explore how union personnel located in various places, spaces and scales construct the issue of declining youth union membership. It explores the scale of connections within the labour movement and the extent to which these connections are leveraged to address the problem of youth union membership decline. To offer the reader a sense of context and perspective, the thesis firstly outlines the historical development of the union movement. It also reviews the literature on youth membership decline. Labour geography offers a rich and apposite analytical tool for investigation of this area. The notion of ‘scale’ as a dynamic, interactive, constructed and reconstructed entity (Ellem, 2006) is an appropriate lens for viewing youth-union membership issues. In this non-linear view, scale is a relational element which interplays with space, place and the environment (Howett, in Marston, 2000) rather than being ‘sequential’ and hierarchical. Importantly, the thesis investigates the notion of unions as ‘spaces of dependence’ (Cox, 1998a, p.2), organisations whose space is centred upon realising essential interests. It also considers the quality of unions’ interactions with others – their ‘spaces of engagement‘(Cox, 1998a, p.2), and the impact that this has upon their ability to recruit youth. The findings reveal that most respondents across the spectrum of the union movement attribute the decline in youth membership levels to factors external to the movement itself, such as changes to industrial relations legislation and the impact of globalisation on employment markets. However, participants also attribute responsibility for declining membership levels to the union movement itself, citing factors such as a lack of resourcing and a need to change unions’ perceived identity and methods of operation. The research further determined that networks of connections across the union movement are tenuous and, to date, are not being fully utilised to assist unions to overcome the youth recruitment dilemma. The study concludes that potential connections between unions are hampered by poor resourcing, workload issues and some deeply entrenched attitudes related to unions ‘defending (and maintaining) their patch’.
Resumo:
Current trends in workforce development indicate the movement of workers within and across occupations to be the norm. In 2009, only one in three vocational education and training (VET) graduates in Australia ended up working in an occupation for which they were trained. This implies that VET enhances the employability of its graduates by equipping them with the knowledge and competencies to work in different occupations and sectors. This paper presents findings from a Government-funded study that examined the occupational mobility of selected associate professional and trades occupations within the Aged Care, Automotive and Civil Construction sectors in Queensland. The study surveyed enrolled nurses and related workers, motor mechanics and civil construction workers to analyse their patterns of occupational mobility, future work intentions, reasons for taking and leaving work, and the factors influencing them to leave or remain in their occupations. This paper also discusses the implications of findings for the training of workers in these sectors and more generally.
Resumo:
Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.
Resumo:
View from the Construction sector as to the need to improve OHS culture What were the goals and the outcomes of the CRC Construction Innovation research Leadership behaviours to drive OHS culture change in industry What benefits to the construction sector have occurred through these initiatives What we have learnt on the journey
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
Construction 2020 is a national initiative undertaken by CRC for Construction Innovation to focus its ongoing leadership of the Australian property and construction industry in applied research and best contribute to the industry's national and international growth and competitiveness. It is the first major report on the long-term outlook for the industry since the late 1990s. The report identifies nine key themes for the future of the property and construction industry. These visions describe the major concerns of the industry and the improved future working environment favoured by its stakeholders. The first and clearest vision, agreed across the industry, is that environmentally sustainable construction the creation of buildings and infrastructure that minimise their impact on the natural environment is an area of huge potential. Here technologies like Construction Innovation's LCADesign can make a big difference. This is a calculator that works out automatically from 3D computer-aided design the environmental costs of materials in a building all at the push of a button. By working with industry, we'd expect to have a comprehensive set of eco-design tools for all stages of the construction life cycle, to minimise energy use, greenhouse and other forms of waste or pollution. Other significant areas of focus in the report include the development of nationally uniform codes of practice, new tools to evaluate design and product performance, comparisons with overseas industries, and a worldwide research network to ensure that Australian technology is at the cutting edge.
Resumo:
This paper examines current teaching practice within the context of the Bachelor of Design (Fashion) programme at AUT University and compares it to the approach adopted in previous years. In recent years, staff on the Bachelor of Design (Fashion) adopted a holistic approach to the assessment of design projects similar to the successful ideas and methods put forward by Stella Lange at the FINZ conference, 2005. Prior to adopting this holistic approach, the teaching culture at AUT University was modular and divorced the development of conceptual design ideas from the technical processes of patternmaking and garment construction, thus limiting the creative potential of integrated project work. Fashion Design is not just about drawing pretty pictures but is rather an entire process that encapsulates conceptual design ideas and technical processes within the context of a target market. Fashion design at AUT being under the umbrella of a wider Bachelor of Design must encourage a more serious view of Fashion and Fashion Design as a whole. In the development of the Bachelor of Design degree at AUT, the university recognised that design education would be best serviced by an inclusive approach. At inception, Core Studio and Core Theory papers formed the first semester of the programme across the discipline areas of Fashion, Spatial Design, Graphic Design and Digital Design. These core papers reinforce the reality that there is a common skill set that transcends all design disciplines with the differentiation between disciplines being determined by the techniques and processes they adopt. Studio based teaching within the scope of a major design project was recognised and introduced some time ago for students in their graduating year, however it was also expected that by year 3 the student had amassed the basic skills required to be able to work in this way. The opinion concerning teaching these basic skills was that they were best serviced by a modular approach. Prior attempts to manage design project delivery leant towards deconstructing the newly formed integrated papers in order to ensure key technical skills were covered in enough depth. So, whilst design projects have played an integral part in the delivery of fashion design over the year levels, the earlier projects were timetabled by discipline and unconvincingly connected. This paper discusses how the holistic approach to assessment must be coupled with an integrated approach to delivery. The methods and processes used are demonstrated and some recently trialled developments are shown to have resulted in achieving the integrated approach in both delivery and assessment.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.