828 resultados para Aumann-Shapley pricing
Resumo:
The economic and financial crisis in Europe is affecting the financing of long-term infrastructure investment. There are multiple clearly identifiable channels: reduced demand for long-term investment, a tightening prudential framework for lending, upward adjustment of risk perception, complex transition of the financial system, and increasing macroeconomic, sovereign and regulatory risk. Some of the identified channels are potentially dangerous spillovers from the crisis that entail the risk of a downward spiral (eg increasing regulatory risk), while others are efficient market responses (eg reduced investment demand, correction of pricing of risk). Consequently, public policy instruments should not address the accessibility of long-term finance per se, but should explicitly target the critical channels.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply chain from clients to consultants, contractors, sub-contractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, based on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with tendering are highly variable, 1-15%, depending upon what precisely is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
In the UK, public expenditure on transport infrastructure is nearly £6 billion for the past few years. Over £500 million per year were spent on bridge assessment and strengthening and reducing the backlog of road requiring maintenance. A further £200 million a year will be spent on keeping the safe operation of the network and efficiently through day to day maintenance, lighting and signing . The Department of Transport is planning to extend private sector experience in road management and operation by introducing Design, Build, Finance and Operate (DBFO) This paper investigates the different ways of financing road transport infrastructure including road pricing, private finance in transport infrastructure, the role of the private sector, Design, Build, Finance and Operate (DBFO) schemes, the benefits and problems of such schemes. The paper considers planning gain as a means of financing transport infrastructure with examples of developers to fund link road building and improvements to the local planning system
Resumo:
Formal and analytical risk models prescribe how risk should be incorporated in construction bids. However, the actual process of how contractors and their clients negotiate and agree on price is complex, and not clearly articulated in the literature. Using participant observation, the entire tender process was shadowed in two leading UK construction firms. This was compared to propositions in analytical models and significant differences were found. 670 hours of work observed in both firms revealed three stages of the bidding process. Bidding activities were categorized and their extent estimated as deskwork (32%), calculations (19%), meetings (14%), documents (13%), off-days (11%), conversations (7%), correspondence (3%) and travel (1%). Risk allowances of 1-2% were priced in some bids and three tiers of risk apportionment in bids were identified. However, priced risks may sometimes be excluded from the final bidding price to enhance competitiveness. Thus, although risk apportionment affects a contractor’s pricing strategy, other complex, microeconomic factors also affect price. Instead of pricing in contingencies, risk was priced mostly through contractual rather than price mechanisms, to reflect commercial imperatives. The findings explain why some assumptions underpinning analytical models may not be sustainable in practice and why what actually happens in practice is important for those who seek to model the pricing of construction bids.
Resumo:
This study is motivated by the proposition that the objectives of the AWB Ltd have changed since semi-privatisation of the Australian Wheat Board under the Wheat Marketing Act, 1989. Conceptualising this change of objectives as a shift from revenue maximization to profit maximization, this study examines the impact of such a change on the pricing policies of a multi-market price-setting firm. More specifically, this paper investigates, using two hypothetical objective functions, a risk averse AWB�s price-setting behaviour in an �overseas� and a �domestic� market in response to recent wheat industry developments. In the analysis these developments manifest themselves as differing price elasticities, differing transport costs and uncertain demand functions, and their implications particularly for the prices paid by domestic consumers are explored.
Resumo:
In developing techniques for monitoring the costs associated with different procurement routes, the central task is disentangling the various project costs incurred by organizations taking part in construction projects. While all firms are familiar with the need to analyse their own costs, it is unusual to apply the same kind of analysis to projects. The purpose of this research is to examine the claims that new, ways of working such as strategic alliancing and partnering bring positive business benefits. This requires that costs associated with marketing, estimating, pricing, negotiation of terms, monitoring of performance and enforcement of contract are collected for a cross-section of projects under differing arrangements, and from those in the supply, chain from clients to consultants, contractors, subcontractors and suppliers. Collaboration with industrial partners forms the basis for developing a research instrument, bused on time sheets, which will be relevant for all those taking part in the work. The signs are that costs associated with,with tendering are highly variable, 1-15%, depending upon what precisely, is taken into account. The research to date reveals that there are mechanisms for measuring the costs of transactions and these will generate useful data for subsequent analysis.
Resumo:
Formal and analytical models that contractors can use to assess and price project risk at the tender stage have proliferated in recent years. However, they are rarely used in practice. Introducing more models would, therefore, not necessarily help. A better understanding is needed of how contractors arrive at a bid price in practice, and how, and in what circumstances, risk apportionment actually influences pricing levels. More than 60 proposed risk models for contractors that are published in journals were examined and classified. Then exploratory interviews with five UK contractors and documentary analyses on how contractors price work generally and risk specifically were carried out to help in comparing the propositions from the literature to what contractors actually do. No comprehensive literature on the real bidding processes used in practice was found, and there is no evidence that pricing is systematic. Hence, systematic risk and pricing models for contractors may have no justifiable basis. Contractors process their bids through certain tendering gateways. They acknowledge the risk that they should price. However, the final settlement depends on a set of complex, micro-economic factors. Hence, risk accountability may be smaller than its true cost to the contractor. Risk apportionment occurs at three stages of the whole bid-pricing process. However, analytical approaches tend not to incorporate this, although they could.
Resumo:
Economic mechanisms enhance technological solutions by setting the right incentives to reveal information about demand and supply accurately. Market or pricing mechanisms are ones that foster information exchange and can therefore attain efficient allocation. By assigning a value (also called utility) to their service requests, users can reveal their relative urgency or costs to the service. The implementation of theoretical sound models induce further complex challenges. The EU-funded project SORMA analyzes these challenges and provides a prototype as a proof-of-concept. In this paper the approach within the SORMA-project is described on both conceptual and technical level.
Resumo:
A case study on the tendering process and cost/time performance of a public building project in Ghana is conducted. Competitive bids submitted by five contractors for the project, in which contractors were required to prepare their own quantities, were analyzed to compare differences in their pricing levels and risk/requirement perceptions. Queries sent to the consultants at the tender stage were also analyzed to identify the significant areas of concern to contractors in relation to the tender documentation. The five bidding prices were significantly different. The queries submitted for clarifications were significantly different, although a few were similar. Using a before-and-after experiment, the expected cost/time estimate at the start of the project was compared to the actual cost/time values, i.e. what happened in the actual construction phase. The analysis showed that the project exceeded its expected cost by 18% and its planned time by 210%. Variations and inadequate design were the major reasons. Following an exploration of these issues, an alternative tendering mechanism is recommended to clients. A shift away from the conventional approach of awarding work based on price, and serious consideration of alternative procurement routes can help clients in Ghana obtain better value for money on their projects.
Resumo:
One of the aims of a broad ethnographic study into how the apportionment of risk influences pricing levels of contactors was to ascertain the significant risks affecting contractors in Ghana, and their impact on prices. To do this, in the context of contractors, the difference between expected and realized return on a project is the key dependent variable examined using documentary analyses and semi-structured interviews. Most work in this has focused on identifying and prioritising risks using relative importance indices generated from the analysis of questionnaire survey responses. However, this approach may be argued to constitute perceptions rather than direct measures of the project risk. Here, instead, project risk is investigated by examining two measures of the same quantity; one ‘before’ and one ‘after’ construction of a project has taken place. Risks events are identified by ascertaining the independent variables causing deviations between expected and actual rates of return. Risk impact is then measured by ascertaining additions or reductions to expected costs due to the occurrence of risk events. So far, data from eight substantially complete building projects indicates that consultants’ inefficiency, payment delays, subcontractor-related problems and changes in macroeconomic factors are significant risks affecting contractors in Ghana.
Resumo:
The process of how contractors take account of risk when calculating their bids for construction work is investigated based on preliminary investigations and case studies in Ghana and UK. Ghana and UK were chosen, more or less arbitrarily, for the purpose of case studies, and to test the idea that there are systematic differences between the approaches in different places. Clear differences were found in the risk pricing approaches of contractors in the two countries. The difference appeared to emanate from the professional knowledge and competence of the bid team members, company policy, corporate accountability and the business environments in which the contractors operate. Both groups of contractors take account of risk in estimates. However, risk accountability was found to be higher on the agenda in the tender process of UK contractors, documented more systematically, and assessed and managed more rigorously with input from the whole bid team. Risk accountability takes place at three levels of the tender process and is dictated strongly by market forces and company circumstances.
Resumo:
Numerous studies have documented the failure of the static and conditional capital asset pricing models to explain the difference in returns between value and growth stocks. This paper examines the post-1963 value premium by employing a model that captures the time-varying total risk of the value-minus-growth portfolios. Our results show that the time-series of value premia is strongly and positively correlated with its volatility. This conclusion is robust to the criterion used to sort stocks into value and growth portfolios and to the country under review (the US and the UK). Our paper is consistent with evidence on the possible role of idiosyncratic risk in explaining equity returns, and also with a separate strand of literature concerning the relative lack of reversibility of value firms' investment decisions.
Resumo:
Depreciation is a key element of understanding the returns from and price of commercial real estate. Understanding its impact is important for asset allocation models and asset management decisions. It is a key input into well-constructed pricing models and its impact on indices of commercial real estate prices needs to be recognised. There have been a number of previous studies of the impact of depreciation on real estate, particularly in the UK. Law (2004) analysed all of these studies and found that the seemingly consistent results were an illusion as they all used a variety of measurement methods and data. In addition, none of these studies examined impact on total returns; they examined either rental value depreciation alone or rental and capital value depreciation. This study seeks to rectify this omission, adopting the best practice measurement framework set out by Law (2004). Using individual property data from the UK Investment Property Databank for the 10-year period between 1994 and 2003, rental and capital depreciation, capital expenditure rates, and total return series for the data sample and for a benchmark are calculated for 10 market segments. The results are complicated by the period of analysis which started in the aftermath of the major UK real estate recession of the early 1990s, but they give important insights into the impact of depreciation in different segments of the UK real estate investment market.
Resumo:
Volatility, or the variability of the underlying asset, is one of the key fundamental components of property derivative pricing and in the application of real option models in development analysis. There has been relatively little work on volatility in real terms of its application to property derivatives and the real options analysis. Most research on volatility stems from investment performance (Nathakumaran & Newell (1995), Brown & Matysiak 2000, Booth & Matysiak 2001). Historic standard deviation is often used as a proxy for volatility and there has been a reliance on indices, which are subject to valuation smoothing effects. Transaction prices are considered to be more volatile than the traditional standard deviations of appraisal based indices. This could lead, arguably, to inefficiencies and mis-pricing, particularly if it is also accepted that changes evolve randomly over time and where future volatility and not an ex-post measure is the key (Sing 1998). If history does not repeat, or provides an unreliable measure, then estimating model based (implied) volatility is an alternative approach (Patel & Sing 2000). This paper is the first of two that employ alternative approaches to calculating and capturing volatility in UK real estate for the purposes of applying the measure to derivative pricing and real option models. It draws on a uniquely constructed IPD/Gerald Eve transactions database, containing over 21,000 properties over the period 1983-2005. In this first paper the magnitude of historic amplification associated with asset returns by sector and geographic spread is looked at. In the subsequent paper the focus will be upon model based (implied) volatility.
Resumo:
The increased frequency in reporting UK property performance figures, coupled with the acceptance of the IPD database as the market standard, has enabled property to be analysed on a comparable level with other more frequently traded assets. The most widely utilised theory for pricing financial assets, the Capital Asset Pricing Model (CAPM), gives market (systematic) risk, beta, centre stage. This paper seeks to measure the level of systematic risk (beta) across various property types, market conditions and investment holding periods. This paper extends the authors’ previous work on investment holding periods and how excess returns (alpha) relate to those holding periods. We draw on the uniquely constructed IPD/Gerald Eve transactions database, containing over 20,000 properties over the period 1983-2005. This research allows us to confirm our initial findings that properties held over longer periods perform in line with overall market performance. One implication of this is that over the long-term performance may be no different from an index tracking approach.