856 resultados para 720204 Industry policy
Resumo:
The explosion in use of online social networks is an important phenomenon that provides a new set of entrepreneurial opportunities. Emerging musicians have been among the first to exploit this new market opportunity – and indeed, many have used it successfully. A recent study Carter (2009) reveals that artists who earned the most returns had an online presence on multiple social online sites and services such as MySpace and Facebook. These web pages are leveraged to build fan bases and develop different types of revenue streams. Yet, little is currently known about discovery or exploitation of such opportunities.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
The development of effective safety regulations for unmanned aircraft systems (UAS) is an issue of paramount concern for industry. The development of this framework is a prerequisite for greater UAS access to civil airspace and, subsequently, the continued growth of the UAS industry. The direct use of the existing conventionally piloted aircraft (CPA) airworthiness certification framework for the regulation of UAS has a number of limitations. The objective of this paper is to present one possible approach for the structuring of airworthiness regulations for civilian UAS. The proposed approach facilitates a more systematic, objective and justifiable method for managing the spectrum of risk associated with the diversity of UAS and their potential operations. A risk matrix is used to guide the development of an airworthiness certification matrix (ACM). The ACM provides a structured categorisation that facilitates the future tailoring of regulations proportionate to the levels of risk associated with the operation of the UAS. As a result, an objective and traceable link may be established between mandated regulations and the overarching objective for an equivalent level of safety to CPA. The ACM also facilitates the systematic consideration of a range of technical and operational mitigation strategies. For these reasons, the ACM is proposed as a suitable method for the structuring of an airworthiness certification framework for civil or commercially operated UAS (i.e., the UAS equivalent in function to the Part 21 regulations for civil CPA) and for the further structuring of requirements on the operation of UAS in un-segregated airspace.
Resumo:
Construction 2020 is a national initiative undertaken by CRC for Construction Innovation to focus its ongoing leadership of the Australian property and construction industry in applied research and best contribute to the industry's national and international growth and competitiveness. It is the first major report on the long-term outlook for the industry since the late 1990s. The report identifies nine key themes for the future of the property and construction industry. These visions describe the major concerns of the industry and the improved future working environment favoured by its stakeholders. The first and clearest vision, agreed across the industry, is that environmentally sustainable construction the creation of buildings and infrastructure that minimise their impact on the natural environment is an area of huge potential. Here technologies like Construction Innovation's LCADesign can make a big difference. This is a calculator that works out automatically from 3D computer-aided design the environmental costs of materials in a building all at the push of a button. By working with industry, we'd expect to have a comprehensive set of eco-design tools for all stages of the construction life cycle, to minimise energy use, greenhouse and other forms of waste or pollution. Other significant areas of focus in the report include the development of nationally uniform codes of practice, new tools to evaluate design and product performance, comparisons with overseas industries, and a worldwide research network to ensure that Australian technology is at the cutting edge.
Resumo:
Research on workforce diversity gained momentum in the 1990s. However, empirical findings to date on the link between gender diversity and performance have been inconsistent. Based on contrasting theories, this paper proposes a positive linear and a negative linear prediction of the gender diversity-performance relationship. The paper also proposes that industry type (services vs. manufacturing) moderates the gender diversity-performance relationship such that the relationship will be positive in service organisations and negative in manufacturing organisations. The results show partial support for the positive linear gender diversity-performance relationship and for the moderating effect of industry type. The study contributes to the field of diversity by showing that workforce gender diversity can have a different impact on organisational performance in different industries.
Resumo:
Reliable infrastructure assets impact significantly on quality of life and provide a stable foundation for economic growth and competitiveness. Decisions about the way assets are managed are of utmost importance in achieving this. Timely renewal of infrastructure assets supports reliability and maximum utilisation of infrastructure and enables business and community to grow and prosper. This research initially examined a framework for asset management decisions and then focused on asset renewal optimisation and renewal engineering optimisation in depth. This study had four primary objectives. The first was to develop a new Asset Management Decision Framework (AMDF) for identifying and classifying asset management decisions. The AMDF was developed by applying multi-criteria decision theory, classical management theory and life cycle management. The AMDF is an original and innovative contribution to asset management in that: · it is the first framework to provide guidance for developing asset management decision criteria based on fundamental business objectives; · it is the first framework to provide a decision context identification and analysis process for asset management decisions; and · it is the only comprehensive listing of asset management decision types developed from first principles. The second objective of this research was to develop a novel multi-attribute Asset Renewal Decision Model (ARDM) that takes account of financial, customer service, health and safety, environmental and socio-economic objectives. The unique feature of this ARDM is that it is the only model to optimise timing of asset renewal with respect to fundamental business objectives. The third objective of this research was to develop a novel Renewal Engineering Decision Model (REDM) that uses multiple criteria to determine the optimal timing for renewal engineering. The unique features of this model are that: · it is a novel extension to existing real options valuation models in that it uses overall utility rather than present value of cash flows to model engineering value; and · it is the only REDM that optimises timing of renewal engineering with respect to fundamental business objectives; The final objective was to develop and validate an Asset Renewal Engineering Philosophy (AREP) consisting of three principles of asset renewal engineering. The principles were validated using a novel application of real options theory. The AREP is the only renewal engineering philosophy in existence. The original contributions of this research are expected to enrich the body of knowledge in asset management through effectively addressing the need for an asset management decision framework, asset renewal and renewal engineering optimisation based on fundamental business objectives and a novel renewal engineering philosophy.
Resumo:
In Cook v Cook the Australian High Court held that the standard of reasonable care owed by a learner driver to an instructor, conscious of the driver’s lack of experience, was lower than that owed to other passengers and road users. Recently, in Imbree v McNeilly, the High Court declined to follow this principle, concluding that the driver’s status or relationship with the claimant should no longer influence or alter the standard of care owed. The decision therefore provides an opportunity to re-examine the rationale and policy behind current jurisprudence governing the standard of care owed by learner drivers. In doing so, this article considers the principles relevant to determining the standard and Imbree’s implications for other areas of tort law and claimant v defendant relationships. It argues that Imbree was influenced by changing judicial perceptions concerning the vulnerability of driving instructors and the relevance of insurance to tortious liability.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
The construction industry should be a priority to all governments because it impacts economically and socially on all citizens. Sector turnover in industrialised economies typically averages 8-12% of GDP. Further, construction is critical to economic growth. Recent Australian studies estimate that a 10% gain in efficiency in construction translates to a 2.5% increase in GDP ----- ----- Inefficiencies in the Australian construction industry have been identified by a number of recent studies modelling the building process. They have identified potential savings in time of between 25% and 40% by reducing non-value added steps in the process. A culture of reform is now emerging in the industry – one in which alternate forms of project delivery are being trial. ----- ----- Government and industry have identified Alliance Contracting as a means to increase efficiency in the construction industry as part of a new innovative procurement environment. Alliance contracting requires parties to form relationships and work cooperatively to provide a more complete service. This is a significant cultural change for the construction industry, with its well-known adversarial record in traditional contracting. Alliance contracts offer enormous potential benefits, but the Australian construction industry needs to develop new skills to effectively participate in the new relationship environment. ----- ----- This paper describes a collaborative project identifying skill needs for clients and construction professionals to more effectively participate in an increasingly sophisticated international procurement environment. The aim of identifying these skill needs is to assist industry, government, and skill developers to prepare the Australian construction workforce for the future. The collaborating Australian team has been fortunate to secure the Australian National Museum in Canberra as its live case study. The Acton Peninsula Development is the first major building development in the world awarded on the basis of a joint alliance contract.
Resumo:
This paper outlines how the project agreement operating on the Australian National Museum project in Canberra, Australia facilitated a responsible and responsive workplace environment for construction workers. A project alliancing approach was adopted and designed to encourage industrial relations innovation in the workplace. The trigger for this approach was the perceived success of the alliancing working arrangements between key project delivery teams and a desire to extend this arrangement to subcontractors, suppliers and the workforce. Changes in the Australian workplace relations environment and introduction of a national code of practice for the Australian construction industry provided impetus for reaching a new type of workplace agreement. The workplace culture and characteristics of relationships formed between workers and management on that site shaped the agreed terms and conditions of work. It also spurred the pursuit of innovative approaches to project delivery from a technology, management and workplace culture perspective.
Resumo:
AERA Distinguished Lecture, Annual Meetings of the American Educational Research Association, New Orleans, 8 April 2011. How well does educational policy, innovation and science cross borders? What are the parameters of a generalisable cultural science of education? What constitutes a principled policy 'borrowing'?
Resumo:
This thesis articulates a methodology that can be applied to the analysis and design of underlying organisational structures and processes that will consistently and effectively address ‘wicked problems’ (the most difficult class of problems that we can conceptualise: problems which consist of ‘clusters’ of problems; problems within these clusters cannot be solved in isolation from one another, and include sociopolitical and moral-spiritual issues (Rittel and Webber 1973)) in forestry. This transdisciplinary methodology has been developed from the perspective of institutional economics synthesised with perspectives from ecological economics and system dynamics. The institutionalist policymaking framework provides an approach for the explicit development of holistic policy. An illustrative application of this framework has been applied to the wicked problem of forestry in southern Tasmania as an example of the applicability of the approach in the Australian context. To date all attempts to seek solutions to that prevailing wicked problem set have relied on non-reflexive, partial and highly reductionist thinking. A formal assessment of prevailing governance and process arrangements applying to that particular forestry industry has been undertaken using the social fabric matrix. This methodology lies at the heart of the institutionalist policymaking framework, and allows for the systematic exploration of elaborately complex causal links and relationships, such as are present in southern Tasmania. Some possible attributes of an alternative approach to forest management that sustains ecological, social and economic values of forests have been articulated as indicative of the alternative policy and management outcomes that real-world application of this transdisciplinary, discursive and reflexive framework may crystallise. Substantive and lasting solutions to wicked problems need to be formed endogenously, that is, from within the system. The institutionalist policymaking framework is a vehicle through which this endogenous creation of solutions to wicked problems may be realised.