872 resultados para requirements specification
Resumo:
This paper tells about the recognition of temporal expressions and the resolution of their temporal reference. A proposal of the units we have used to face up this tasks over a restricted domain is shown. We work with newspapers' articles in Spanish, that is why every reference we use is in Spanish. For the identification and recognition of temporal expressions we base on a temporal expression grammar and for the resolution on a dictionary, where we have the information necessary to do the date operation based on the recognized expressions. In the evaluation of our proposal we have obtained successful results for the examples studied.
Resumo:
The consideration of personalization politics in the context of any web application modelling method obliges to the revision of its different modelling activities, which must be adapted to take into account the information regarding the user (usually gathered in a user model) to define aspects such as navigation or presentation. Additionally, they must provide a set of techniques to populate such user model. Finally, and because of the rapid pace at which personalization politics usually change, the modelling process should provide support not only for static personalization rules (known at design time) but also for the definition or change of these rules once the application has been deployed. This article presents, in the context of the Object Oriented Hypermedia Method (OO-H), a personalization framework that fulfils these requirements, and is organized around four main concepts: (1) a set of design activities that capture the personalization requirements known at design time, (2) a mechanism for the specification of personalization rules, defined by means of an XML template, that decouples the definition of the personalization model from the remaining models, (3) an execution architecture that supports the change at execution time of these rules and (4) an extensible repository that includes a set of register mechanisms for the user activity in the system. The possibility of extension of this repository facilitates its adaptation to the particular characteristics of any particular application.
Resumo:
The aim of this study is to analyse the physical and physiological factors in soccer training at different categories of training. The participants were 30 soccer players of 8-aside soccer in the under 10’s age group (9.93±0.25 years) who participated in the under 10 Provincial Tournament in Alicante. During training, the variables of covered distance, heart rate, speed (average and maximum values) as well as the methodology used and position were registered. After the statistical analysis and its related discussion, it was concluded that the players do not show differences in the covered total distance in relation to the category. Notwithstanding, there are differences with regards to speed and heart rate, which are caused by the greater physical development of the players in comparison to the under10’s age group category. Regarding the methodology employed, it is worth stressing that the coaches used, to a greater extend, the global method, followed by the mixed method.
Resumo:
The construction industry is characterised by fragmentation and suffers from lack of collaboration, often adopting adversarial working practices to achieve deliverables. For the UK Government and construction industry, BIM is a game changer aiming to rectify this fragmentation and promote collaboration. However it has become clear that there is an essential need to have better controls and definitions of both data deliverables and data classification. Traditional methods and techniques for collating and inputting data have shown to be time consuming and provide little to improve or add value to the overall task of improving deliverables. Hence arose the need in the industry to develop a Digital Plan of Work (DPoW) toolkit that would aid the decision making process, providing the required control over the project workflows and data deliverables, and enabling better collaboration through transparency of need and delivery. The specification for the existing Digital Plan of Work (DPoW) was to be, an industry standard method of describing geometric, requirements and data deliveries at key stages of the project cycle, with the addition of a structured and standardised information classification system. However surveys and interviews conducted within this research indicate that the current DPoW resembles a digitised version of the pre-existing plans of work and does not push towards the data enriched decision-making abilities that advancements in technology now offer. A Digital Framework is not simply the digitisation of current or historic standard methods and procedures, it is a new intelligent driven digital system that uses new tools, processes, procedures and work flows to eradicate waste and increase efficiency. In addition to reporting on conducted surveys above, this research paper will present a theoretical investigation into usage of Intelligent Decision Support Systems within a digital plan of work framework. Furthermore this paper will present findings on the suitability to utilise advancements in intelligent decision-making system frameworks and Artificial Intelligence for a UK BIM Framework. This should form the foundations of decision-making for projects implemented at BIM level 2. The gap identified in this paper is that the current digital toolkit does not incorporate the intelligent characteristics available in other industries through advancements in technology and collation of vast amounts of data that a digital plan of work framework could have access to and begin to develop, learn and adapt for decision-making through the live interaction of project stakeholders.
Report of the High-Performance Computing Applications Requirements Group. III/6074/94-EN, April 1994