998 resultados para program optimization
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
A-1 Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
The purpose of this investigation was to evaluate the Compensatory Wetland Mitigation Program at the Iowa Department of Transportation (DOT) in terms of regulatory compliance. Specific objectives included: 1) Determining if study sites meet the definition of a jurisdictional wetland. 2) Determining the degree of compliance with requirements specified in Clean Water Act Section 404 permits. A total of 24 study sites, in four age classes were randomly selected from over 80 sites currently managed by the Iowa DOT. Wetland boundaries were delineated in the field and mitigation compliance was determined by comparing the delineated wetland acreage at each study site to the total wetland acreage requirements specified in individual CWA Section 404 permits. Of the 24 sites evaluated in this study, 58 percent meet or exceed Section 404 permit requirements. Net gain ranged from 0.19 acre to 27.2 acres. Net loss ranged from 0.2 acre to 14.6 acres. The Denver Bypass 1 site was the worst performer, with zero acres of wetland present on the site and the Akron Wetland Mitigation Site was the best performer with slightly more than 27 acres over the permit requirement. Five of the 10 under-performing sites are more than five years post construction, two are five years post construction, one is three years post construction and the remaining two are one year post construction. Of the sites that meet or exceed permit requirements, approximately 93 percent are five years or less post construction and approximately 43 percent are only one year old. Only one of the 14 successful sites is more than five years old. Using Section 404 permit acreage requirements as the criteria for measuring success, 58 percent of the wetland mitigation sites investigated as part of this study are successful. Using net gain/loss as the measure of success, the Compensatory Wetland Mitigation Program has been successful in creating/restoring nearly 44 acres of wetland over what was required by permits.
Resumo:
Monthly Public Assistance Statistical Report Family Investment Program
Resumo:
SUPPLEMENTAL SECURITY INCOME PROGRAM
Resumo:
Future plans for funding for Iowa Department of Transportation Report.
Resumo:
A basic prerequisite for in vivo X-ray imaging of the lung is the exact determination of radiation dose. Achieving resolutions of the order of micrometres may become particularly challenging owing to increased dose, which in the worst case can be lethal for the imaged animal model. A framework for linking image quality to radiation dose in order to optimize experimental parameters with respect to dose reduction is presented. The approach may find application for current and future in vivo studies to facilitate proper experiment planning and radiation risk assessment on the one hand and exploit imaging capabilities on the other.
Resumo:
America’s roadways are in serious need of repair. According to the American Society of Civil Engineers (ASCE), one-third of the nation’s roads are in poor or mediocre condition. ASCE has estimated that under these circumstances American drivers will sacrifice $5.8 billion and as many as 13,800 fatalities a year from 1999 to 2001 ( 1). A large factor in the deterioration of these roads is a result of how well the steel reinforcement transfers loads across the concrete slabs. Fabricating this reinforcement using a shape conducive to transferring these loads will help to aid in minimizing roadway damage. Load transfer within a series of concrete slabs takes place across the joints. For a typical concrete paved road, these joints are approximately 1/8-inch gaps between two adjacent slabs. Dowel bars are located at these joints and used to transfer load from one slab to its adjacent slabs. As long as the dowel bar is completely surrounded by concrete no problems will occur. However, when the hole starts to oblong a void space is created and difficulties can arise. This void space is formed due to a stress concentration where the dowel contacts the concrete. Over time, the repeated process of traffic traveling over the joint crushes the concrete surrounding the dowel bar and causes a void in the concrete. This void inhibits the dowel’s ability to effectively transfer load across the joint. Furthermore, this void gives water and other particles a place to collect that will eventually corrode and potentially bind or lock the joint so that no thermal expansion is allowed. Once there is no longer load transferred across the joint, the load is transferred to the foundation and differential settlement of the adjacent slabs will occur.
Resumo:
SUPPLEMENTAL SECURITY INCOME PROGRAM
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
The Food Assistance Monthly Participation Report is a monthly summary of Food Assistance program participation, Statewide and for each Iowa county. Breakouts are reported for participants also in the FIP program, those only receiving Food Assistance, and those that are receiving economic assistance under other programs (primarily Medicaid). This report may also be known as the F-1 Report.
Resumo:
A-1 Monthly Public Assistance Statistical Report Family Investment Program, June 2005
Resumo:
State Audit Reports